← Back
Elevator apt, semi-fireproof without stores
2255 UNIVERSITY AVENUE
BRONX · BIN 2014752
💬 Discuss this project
1929Year Built
6Stories
D1Building Class
R7-1Zoning
43,176 sfGross Floor Area
37Units
LL97 CoveredRent Stabilized8 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 2257 UNVISITY REALTY, · 10,078 sf lot · 4.28 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
Bulkhead1p · 1 filing · 7 docs
1 job · most recent 03/31/2025
Scaffold
FiledStatusContractorScope
03/31/2025Permit IssuedUPTOWN CONSTRUCTION SERVScaffold
Building Lifecycle
All (79)Filed (3)Permit Issued (4)Signed Off (1)Facade (FISP) (3)Violation (60)Objection (2)Special Inspection (6)
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/19/2026
Violation issued (HPD, open)
B
04/15/2026
Violation issued (HPD, closed)
B
03/26/2026
Signed off — Alteration
Filing for facade repairs work that includes repair of brick masonry bulkhead and exterior walls, repair of eroded mortar joints, replacement of cracked windowsills, etc. as per plans filed herewith. No change in use, egress or occupancy.
X01199097-I1
12/16/2025
Cycle 10 facade report submitted
12/16/2025
Cycle 10 facade report signed — SAFE
12/01/2025
Cycle 10 facade inspection completed
08/25/2025
Permit issued — Sidewalk Shed
X01102800-I1-SH
07/31/2025
Violation issued (ECB, closed)
Construction
05/15/2025
Permit issued — General Construction
X01199097-I1-GC
04/08/2025
Objection resolved — Addressed
04/07/2025
Objection raised — Admin
04/02/2025
Filed — Alteration
Filing for facade repairs work that includes repair of brick masonry bulkhead and exterior walls, repair of eroded mortar joints, replacement of cracked windowsills, etc. as per plans filed herewith. No change in use, egress or occupancy.
X01199097-I1
04/01/2025
Permit issued — Supported Scaffold
X01203327-I1-SF
03/31/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01203327-I1
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
03/21/2025
Special inspection requirement — Masonry
JOSE LANDAURO
03/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSE LANDAURO
03/21/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSE LANDAURO
03/21/2025
Special inspection requirement — Final
JOSE LANDAURO
03/21/2025
Special inspection requirement — Air barrier - visual inspection
JOSE LANDAURO
02/10/2025
Violation issued (ECB, closed)
Construction
02/10/2025
Violation issued (ECB, closed)
Construction
09/18/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/2024
Filed — Alteration
X01102800-I1
08/29/2024
Permit issued — Sidewalk Shed
X01102800-I1-SH
07/11/2024
Violation issued (ECB, closed)
Construction
05/16/2024
Violation issued (ECB, closed)
Boilers
07/24/2023
Violation issued (HPD, closed)
B
07/24/2023
Violation issued (HPD, closed)
A
07/24/2023
Violation issued (HPD, closed)
B
07/24/2023
Violation issued (HPD, closed)
C
07/24/2023
Violation issued (HPD, closed)
B
01/05/2023
Violation issued (HPD, closed)
C
01/05/2023
Violation issued (HPD, closed)
C
12/29/2022
Violation issued (HPD, closed)
C
12/29/2022
Violation issued (HPD, closed)
B
12/29/2022
Violation issued (HPD, closed)
B
09/24/2021
Violation issued (ECB, closed)
Construction
02/06/2021
Violation issued (HPD, closed)
C
01/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
A
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
A
03/10/2020
Violation issued (HPD, closed)
B
03/10/2020
Violation issued (HPD, closed)
C
04/02/2019
Violation issued (HPD, closed)
B
01/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/11/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2017
Violation issued (HPD, closed)
C
01/18/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/04/2016
Violation issued (HPD, closed)
C
01/19/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/14/2016
Violation issued (HPD, closed)
B
12/10/2015
Violation issued (HPD, closed)
A
12/02/2015
Violation issued (HPD, closed)
C
07/30/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 79 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY507/08/2026
UPTOWN CONSTRUCTION SERVICE GROUP I307/08/2026
ROSENBERG REALTY GROUP303/22/2026
2257 UNVISITY REALTY,403/22/2026
2257 UNIVERSITY REALTY1403/22/2026
J B REALTY ASSOCIATE103/22/2026
NEW DAWN SUNRISE CORP.203/22/2026
WAVECREST MANAGEMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE M. LANDAURO, P.E.104/02/2025
ASHRAF CORP103/31/2025
VOLUME SPACE CONSULTING INC.108/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD DESIGNS103/21/2026
RIGHT WAY SERVICES NYC203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor207/08/2026
ALLSTATE RESTORATION CORP.General Contractor203/21/2026
UPTOWN CONSTRUCTION SERVGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616104/02/2025
JOSE M. LANDAURO3500104/02/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP08/25/2025
DOB NOWGeneral ConstructionSigned-offALLSTATE RESTORATION CORP.05/15/2025
DOB NOWSupported ScaffoldPermit IssuedUPTOWN CONSTRUCTION SERV04/01/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP08/29/2024
BISOTISSUEDN. KOFSKY & SON INC06/10/2004
BISOTISSUEDGHOTRA GENERAL CONSTRUCTION INC.02/26/2004
BISEQISSUEDGHOTRA CONSTRUCTION CORP.02/26/2004
BISEQISSUEDGHOTRA CONSTRUCTION CORP.12/12/2003
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/26/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
03/21/2025MasonryJOSE LANDAUROspecial
03/21/2025Structural Stability – Alterations of existing buildingsJOSE LANDAUROspecial
03/21/2025Energy Code Compliance InspectionsJOSE LANDAUROprogress
03/21/2025FinalJOSE LANDAUROprogress
03/21/2025Air barrier - visual inspectionJOSE LANDAUROenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026X01102800-I1Request digital key ↗
08/19/2026X01203327-I1Request digital key ↗
08/19/2026X01199097-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026X01102800-I1Open ↗
08/19/2026X01203327-I1Open ↗
08/13/2026X01199097-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026X01199097-I1Open ↗
08/22/2026X01199097-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026X01199097-I1Open ↗
08/22/2026X01199097-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01199097-I1Open ↗