← Back
Three families
2906 HEATH AVENUE
BRONX · BIN 2015727
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R6Zoning
4,020 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 2,427 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivil
Roof1p · 1 filing · 4 docs
Floor 22p · 2 filings · 10 docs
Floor 13p · 2 filings · 12 docs
Basement4p · 3 filings · 14 docs
1 job · most recent 03/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026——Air Conditioning Systems
Cooling
Gree GREE SPLIT SYSTEM HEAT PUMP MODEL L1V18HP230V1R32A0 18,000 BTU · Condensing Unit ×8
1 job · most recent 03/27/2026
FiledStatusContractorScope
03/27/2026———
1 job · most recent 03/27/2026
Water/Sanitary
FiledStatusContractorScope
03/27/2026——Water/Sanitary
Building Lifecycle
All (84)Filed (5)Permit Issued (1)Violation (22)Objection (33)Special Inspection (23)
07/16/2026
Objection raised — Other
07/06/2026
Filed — Alteration CO
INTERIOR RENOVATION TO EXISTING RESIDENTIAL BUILDING AND ADDING UNITS TO A TOTAL OF 8 UNITS
X00490260-P1
04/10/2026
Special inspection requirement — Air barrier - visual inspection
04/10/2026
Special inspection requirement — Fenestration areas
04/09/2026
Objection raised — Other
04/09/2026
Objection raised — Other
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Scope
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Zoning
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Fire_Protection
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Cost
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Structural
04/09/2026
Objection raised — Scope
04/09/2026
Objection raised — Admin
04/09/2026
Objection raised — Scope
04/09/2026
Objection raised — Energy
04/09/2026
Objection raised — Other
04/09/2026
Objection raised — Zoning
03/27/2026
Filed — Alteration
Installation of split systems to supply proposed multiple dwelling in connection with Alt CO application X01352063-I1.
X01354003-I1
03/27/2026
Filed — Alteration
Installation of split systems to supply proposed multiple dwelling in connection with Alt CO application X01352063-I1.
X01354003-S3
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/27/2026
Special inspection requirement — Maintenance information
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — Mechanical Systems
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2026
Special inspection requirement — Maintenance information
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/02/2026
Filed — Alteration CO
Conversion of existing 3 family dwelling into an 8-family dwelling.
X01352063-I1
03/02/2026
Special inspection requirement — Metering
03/02/2026
Special inspection requirement — Interior lighting power
03/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/02/2026
Special inspection requirement — Insulation placement and R values
03/02/2026
Special inspection requirement — Fenestration air leakage
03/02/2026
Special inspection requirement — Permanent certificate
03/02/2026
Special inspection requirement — Maintenance information
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/01/2026
Special inspection requirement — Sprinkler Systems
Latest 60 of 84 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BABA CONSTRUCTION509/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES207/06/2026
COLOMBO ARCHITECTURAL STUDIO PC303/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING203/21/2026
KDV DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor107/02/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMAMC CONSULTING REPS LLC03/07/2025
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/10/2026Air barrier - visual inspection—energy_progress
04/10/2026Fenestration areas—energy_progress
03/27/2026HVAC-R and service water piping design and insulation—energy_progress
03/27/2026HVAC-R and service water heating equipment—energy_progress
03/27/2026Maintenance information—energy_progress
03/27/2026HVAC-R and service water heating system controls—energy_progress
03/25/2026Final—progress
03/25/2026Mechanical Systems—special
03/23/2026HVAC-R and service water heating equipment—energy_progress
03/23/2026Maintenance information—energy_progress
03/23/2026HVAC-R and service water piping design and insulation—energy_progress
03/23/2026HVAC-R and service water heating system controls—energy_progress
03/02/2026Metering—energy_progress
03/02/2026Interior lighting power—energy_progress
03/02/2026Fenestration and door U-factor and product ratings—energy_progress
03/02/2026Insulation placement and R values—energy_progress
03/02/2026Fenestration air leakage—energy_progress
03/02/2026Permanent certificate—energy_progress
03/02/2026Maintenance information—energy_progress
03/02/2026Fire-Resistance Rated Construction—progress
03/02/2026Energy Code Compliance Inspections—progress
03/02/2026Fire-Resistant Penetrations and Joints—special
02/01/2026Sprinkler Systems—special
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026X00490260-P1Request digital key ↗
08/24/2026X00490260-I1Request digital key ↗
08/17/2026X01352063-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/22/2022220747324Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026X00490260-P1Open ↗
08/24/2026X00490260-I1Open ↗
08/17/2026X01352063-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/24/2026X00490260-P1Open ↗
08/13/2026X00490260-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00490260-I1Open ↗
08/24/2026X00490260-P1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/22/2022220747324Open ↗