← Back
Predominantly retail with other uses
3504 FT INDEPENDENCE ST
BRONX · BIN 2015839
💬 Discuss this project
1931Year Built
3Stories
K4Building Class
R6Zoning
3,907 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸
Predominantly retail with other uses · 3,276 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 07/17/2019
FiledStatusContractorScope
07/17/2019Permit IssuedJECO ELEC'L SERVICE CORP.4 meters, 1 new_meters
Building Lifecycle
All (25)Filed (4)Permit Issued (5)Signed Off (2)Violation (10)Special Inspection (4)
01/04/2022
Signed off — Alteration
Restoration of gas service to mixed-use building including Replacement of 52 feet of 1 1/2" gas piping from main valve to 1st-floor meter room and installation of (2) direct vent combi. units @ 3rd and( 1) hot water heater and (1) boiler @4th floor.
X00446737-I1
01/04/2022
Signed off — Alteration
INSTALLATION OF (1) GAS BOILER @ 4TH FLOOR BOILER ROOM VENTED WITH NEW TYPE 'B' VENT THROUGH THE ROOF AND (2) DIRECT VENT COMBI UNITS @3 RD FLOOR BOILER ROOM.
X00450929-I1
06/14/2021
Permit issued — Plumbing
X00446737-I1-PL
06/07/2021
Filed — Alteration
Restoration of gas service to mixed-use building including Replacement of 52 feet of 1 1/2" gas piping from main valve to 1st-floor meter room and installation of (2) direct vent combi. units @ 3rd and( 1) hot water heater and (1) boiler @4th floor.
X00446737-P2
05/27/2021
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Hammond
04/26/2021
Permit issued — Boiler Equipment
X00450929-I1-BE
04/26/2021
Permit issued — Plumbing
X00446737-I1-PL
03/02/2021
Filed — Alteration
Restoration of gas service to mixed-use building including Replacement of 52 feet of 1 1/2" gas piping from main valve to 1st-floor meter room and installation of (2) direct vent combi. units @ 3rd and( 1) hot water heater and (1) boiler @4th floor.
X00446737-P1
02/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Hammond
02/04/2021
Violation issued (HPD, closed)
I
02/03/2021
Violation issued (HPD, open)
B
02/03/2021
Violation issued (HPD, closed)
C
02/03/2021
Violation issued (HPD, closed)
C
02/03/2021
Violation issued (HPD, closed)
C
01/25/2021
Permit issued — Plumbing
X00446737-I1-PL
01/22/2021
Permit issued — Boiler Equipment
X00450929-I1-BE
01/18/2021
Filed — Alteration
Restoration of gas service to mixed-use building including Replacement of 52 feet of 1 1/2" gas piping from main valve to 1st-floor meter room and installation of (2) direct vent combi. units @ 3rd and( 1) hot water heater and (1) boiler @4th floor.
X00446737-I1
01/18/2021
Filed — Alteration
INSTALLATION OF (1) GAS BOILER @ 4TH FLOOR BOILER ROOM VENTED WITH NEW TYPE 'B' VENT THROUGH THE ROOF AND (2) DIRECT VENT COMBI UNITS @3 RD FLOOR BOILER ROOM.
X00450929-I1
01/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
Patrick Hammond
01/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
Patrick Hammond
07/15/2008
Violation issued (ECB, closed)
Unknown
11/29/2007
Violation issued (ECB, closed)
Construction
10/29/2007
Violation issued (ECB, closed)
Construction
04/14/2000
Violation issued (ECB, closed)
Construction
11/26/1999
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AWN2207/08/2026
OWNER OF 84 WEST 238TH ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMMOND ARCHITECTURE406/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW CODE CONSULTING LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST PLUMBING & HVAC INCPlumbing607/08/2026
HESCOTT, CARDINALElectrical103/21/2026
RAMSARRAN, RAMESHElectrical103/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC06/14/2021
DOB NOWBoiler EquipmentSigned-offBEST PLUMBING & HVAC INC04/26/2021
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC04/26/2021
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC01/25/2021
DOB NOWBoiler EquipmentSigned-offBEST PLUMBING & HVAC INC01/22/2021
BISPLISSUEDSAFEPIPE PLUMBING INC07/10/2003
BISOTISSUEDAWN CORPORARTION11/30/1999
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/27/2021HVAC-R and service water heating equipmentPatrick Hammondenergy_progress
02/22/2021HVAC-R and service water heating equipmentPatrick Hammondenergy_progress
01/13/2021HVAC-R and service water heating equipmentPatrick Hammondenergy_progress
01/13/2021HVAC-R and service water heating system controlsPatrick Hammondenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00446737-I1Request digital key ↗
08/15/2026X00446737-P1Request digital key ↗
08/15/2026X00446737-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/25/2026X00450929-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00446737-I1Open ↗
08/13/2026X00450929-I1Open ↗
08/13/2026X00446737-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026X00450929-I1Open ↗
09/23/2026X00450929-I1Open ↗
09/01/2026X00446737-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00446737-P1Open ↗
08/25/2026X00446737-I1Open ↗
08/13/2026X00446737-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00446737-I1Open ↗
08/13/2026X00450929-I1Open ↗