← Back
Two family frame
2675 BAINBRIDGE AVENUE
BRONX · BIN 2016858
💬 Discuss this project
1915Year Built
2.5Stories
B2Building Class
R5BZoning
2,640 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 1,990 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof2p · 1 filing · 3 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar2p · 2 filings · 14 docs
Basement1p · 1 filing · 11 docs
2 jobs · most recent 12/19/2024
General Wiring
FiledStatusContractorScope
12/19/2024CompleteTEAM H ELECTRIC LLCGeneral Wiring
11/11/2021Permit IssuedBIG CITY ELECTRICAL CONTGeneral Wiring
Building Lifecycle
All (79)Filed (6)Permit Issued (5)Signed Off (3)Violation (30)Inspection (5)Objection (10)Special Inspection (20)
09/30/2025
Signed off — Alteration
Interior work on existing 2-family house to resolve ECB violations; remove illegal partitions. Repair fire damage. No change in use, egress or occupancy.
X00690041-I1
09/16/2025
Signed off — Alteration
Install new plumbing fixtures at cellar level, 1st fl, and second fl.
X00711465-I1
09/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/26/2025
Signed off — Alteration
X01235658-I1
08/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/04/2025
Permit issued — Structural
X01235658-I1-ST
06/09/2025
Filed — Alteration
X01235658-I1
05/02/2025
Special inspection requirement — Final
Mina Eskaros
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hany Demetry
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
05/02/2025
Special inspection requirement — Air barrier - visual inspection
PAUL MARINO
05/02/2025
Special inspection requirement — Fenestration areas
PAUL MARINO
05/02/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
05/02/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
05/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
04/25/2025
Filed — Alteration
Interior work on existing 2-family house to resolve ECB violations; remove illegal partitions. Repair fire damage. No change in use, egress or occupancy.
X00690041-P2
03/20/2025
Permit issued — General Construction
X00690041-I1-GC
01/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/27/2025
Permit issued — Plumbing
X00711465-I1-PL
01/17/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
01/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
01/15/2025
Objection resolved — Addressed
12/26/2024
Objection resolved — Addressed
12/09/2024
Objection resolved — Addressed
12/09/2024
Objection resolved — Addressed
12/09/2024
Objection resolved — Addressed
12/09/2024
Special inspection requirement — Fenestration air leakage
12/09/2024
Special inspection requirement — Air barrier - visual inspection
12/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
12/09/2024
Special inspection requirement — Lighting in dwelling units
12/09/2024
Special inspection requirement — Fenestration areas
12/09/2024
Special inspection requirement — Energy Code Compliance Inspections
12/04/2024
Objection raised — Scope
12/02/2024
Objection raised — Zoning
12/02/2024
Objection raised — Scope
12/02/2024
Objection raised — Other
12/02/2024
Objection raised — Zoning
11/22/2024
Filed — Alteration
Install new plumbing fixtures at cellar level, 1st fl, and second fl.
X00711465-P1
11/22/2024
Filed — Alteration
Interior work on existing 2-family house to resolve ECB violations; remove illegal partitions. Repair fire damage. No change in use, egress or occupancy.
X00690041-P1
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
11/21/2024
Special inspection requirement — Final
Darlyn Alvarez
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
06/14/2024
Permit issued — General Construction
X00690041-I1-GC
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2023
Permit issued — General Construction
X00690041-I1-GC
04/03/2022
Filed — Alteration
Interior work on existing 2-family house to resolve ECB violations; remove illegal partitions. Repair fire damage. No change in use, egress or occupancy.
X00690041-I1
04/03/2022
Filed — Alteration
Install new plumbing fixtures at cellar level, 1st fl, and second fl.
X00711465-I1
09/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/24/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Violation issued (ECB, closed)
Construction
09/24/2021
Violation issued (ECB, closed)
Construction
08/09/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 79 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C106/09/2025
SOTIR ASSOCIATES504/25/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor507/08/2026
LIBERTY GENERAL CONTRACTINGGeneral Contractor303/21/2026
BIG CITY ELECTRICAL CONTElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292106/09/2025
ROJAS ENGINEERING PLLC6232304/25/2025
ENGINEERING CONSULTING SE2050104/03/2022
SOTIR ASSOCIATES7473104/03/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offURENA CONST & DESIGN INC08/04/2025
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC03/20/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/27/2025
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC06/14/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY GENERAL CONTRACTI10/13/2023
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/02/2025FinalMina Eskarosprogress
05/02/2025Fire-Resistant Penetrations and JointsHany Demetryspecial
05/02/2025Energy Code Compliance InspectionsPAUL MARINOprogress
05/02/2025Air barrier - visual inspectionPAUL MARINOenergy_progress
05/02/2025Fenestration areasPAUL MARINOenergy_progress
05/02/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
05/02/2025Fenestration air leakagePAUL MARINOenergy_progress
05/02/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
01/17/2025Energy Code Compliance InspectionsPAUL MARINOprogress
01/17/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
12/09/2024Fenestration air leakage—energy_progress
12/09/2024Air barrier - visual inspection—energy_progress
12/09/2024Fenestration and door U-factor and product ratings—energy_progress
12/09/2024Lighting in dwelling units—energy_progress
12/09/2024Fenestration areas—energy_progress
12/09/2024Energy Code Compliance Inspections—progress
11/22/2024Energy Code Compliance Inspections—progress
11/21/2024Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
11/21/2024FinalDarlyn Alvarezprogress
11/18/2024Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026X00690041-P2Request digital key ↗
08/24/2026X00690041-I1Request digital key ↗
08/20/2026X00711465-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026X00690041-P1Open ↗
08/13/2026X00711465-I1Open ↗
08/13/2026X00711465-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026X00690041-I1Open ↗
09/23/2026X00690041-I1Open ↗
08/27/2026X00711465-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00690041-P2Open ↗
08/24/2026X00690041-P1Open ↗
08/24/2026X00690041-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026X00690041-I1Open ↗
08/27/2026X00711465-I1Open ↗
08/26/2026X00690041-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026X00690041-I1Open ↗
08/24/2026X00690041-P2Open ↗
08/20/2026X00711465-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00690041-I1Open ↗