← Back
Elevator apt, semi-fireproof without stores
227 EAST 203 STREET
BRONX · BIN 2017273
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R8Zoning
50,762 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized69 Open Violations 67 unresolved · 2 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: 227 E 203 REALTY LLC · 10,680 sf lot · 4.75 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 6Under Construction6p · 1 filing · 5 docs
Floor 5Under Construction6p · 1 filing · 5 docs
Floor 4Under Construction6p · 1 filing · 5 docs
Floor 3Under Construction6p · 1 filing · 5 docs
Floor 2Under Construction6p · 1 filing · 5 docs
Floor 1Under Construction6p · 1 filing · 5 docs
1 job · most recent 11/03/2025
FiledStatusContractorScope
11/03/2025Permit IssuedRICHARD NEU—
2 jobs · most recent 03/20/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
03/20/2026Permit IssuedFAIZ AHMEDScaffold
10/31/2025Permit IssuedUNITED KING CONSTRUCTIONSidewalk Shed
Building Lifecycle
All (71)Filed (3)Permit Issued (4)Violation (60)Inspection (2)Special Inspection (2)
09/22/2026
Permit issued — General Construction
X01364654-I1-GC
08/18/2026
Violation issued (HPD, open)
A
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
A
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
08/18/2026
Violation issued (HPD, open)
B
06/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2026
Violation issued (HPD, open)
A
04/10/2026
Permit issued — General Construction
X01364654-I1-GC
04/06/2026
Filed — Alteration
BRICK CRACK REPAIR WORK, WINDOW SILL REPAIR WORK AND PARAPET REPLACEMENT WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
X01364654-I1
04/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
03/20/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01368284-I1
03/20/2026
Permit issued — Supported Scaffold
X01368284-I1-SF
02/26/2026
Special inspection requirement — Masonry
KAMRUL AHSAN
11/03/2025
Permit issued — Sidewalk Shed
X01311802-I1-SH
10/31/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01311802-I1
10/29/2025
Violation issued (ECB, open)
Construction
10/29/2025
Violation issued (ECB, open)
Construction
10/29/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2025
Violation issued (HPD, closed)
C
11/16/2024
Violation issued (HPD, open)
C
11/13/2024
Violation issued (HPD, closed)
C
10/04/2024
Violation issued (HPD, open)
B
10/04/2024
Violation issued (HPD, open)
B
10/04/2024
Violation issued (HPD, closed)
C
08/11/2024
Violation issued (HPD, open)
C
01/11/2024
Violation issued (HPD, open)
C
01/11/2024
Violation issued (HPD, closed)
C
01/11/2024
Violation issued (HPD, closed)
C
01/11/2024
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, open)
A
10/24/2023
Violation issued (HPD, open)
B
10/24/2023
Violation issued (HPD, open)
B
10/24/2023
Violation issued (HPD, open)
B
10/24/2023
Violation issued (HPD, open)
B
10/24/2023
Violation issued (HPD, open)
A
10/24/2023
Violation issued (HPD, open)
C
10/24/2023
Violation issued (HPD, closed)
C
10/24/2023
Violation issued (HPD, closed)
B
10/24/2023
Violation issued (HPD, open)
C
10/24/2023
Violation issued (HPD, open)
B
10/24/2023
Violation issued (HPD, open)
B
10/24/2023
Violation issued (HPD, open)
C
10/24/2023
Violation issued (HPD, closed)
A
10/22/2023
Violation issued (HPD, closed)
C
10/22/2023
Violation issued (HPD, open)
C
10/19/2023
Violation issued (HPD, closed)
C
10/19/2023
Violation issued (HPD, open)
C
10/19/2023
Violation issued (HPD, open)
C
10/19/2023
Violation issued (HPD, open)
B
10/19/2023
Violation issued (HPD, open)
C
10/15/2023
Violation issued (HPD, closed)
C
10/15/2023
Violation issued (HPD, closed)
C
10/15/2023
Violation issued (HPD, open)
C
10/15/2023
Violation issued (HPD, open)
C
10/01/2023
Violation issued (ECB, closed)
Elevators
Latest 60 of 71 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED KING CONSTRUCTION304/09/2026
227 E 203 REALTY LLC303/22/2026
HDW 203 LLC C J REALTY CO203/22/2026
C J REALTY CO LLC803/22/2026
HDW 203 LLC203/22/2026
J REALTY103/22/2026
OWNER OF 227 EAST 203 ST103/22/2026
CJ REALTY CO LLC STATION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2025$3.2M—YFK 203 REALTY LLC → 227 E 203 REALTY LLC$63/sf building
02/25/2015$1.0M—CJ REALTY CO LLC → HDW 203 LLC$20/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BITOPI CONSULTANTS LLC104/06/2026
ALWAYS FAST SERVICES CORP103/20/2026
MJE PROFESSIONAL SERVICES110/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAIZ AHMEDGeneral Contractor309/23/2026
UNITED KING CONSTRUCTIONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036104/06/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFAIZ AHMED09/22/2026
DOB NOWGeneral ConstructionPermit IssuedFAIZ AHMED04/10/2026
DOB NOWSupported ScaffoldPermit IssuedFAIZ AHMED03/20/2026
DOB NOWSidewalk ShedPermit IssuedUNITED KING CONSTRUCTION11/03/2025
BISEQISSUEDS.P.S. NY CONSTRUCTION CO03/22/2011
BISEQISSUEDS.P.S. NY CONSTRUCTION CO11/23/2010
BISFBISSUEDA & S WELDING & BOILER REPAIR01/12/1993
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/02/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
02/26/2026MasonryKAMRUL AHSANspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026X01368284-I1Request digital key ↗
08/18/2026X01311802-I1Request digital key ↗
08/17/2026X01364654-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
04/29/2011220094190Open ↗
11/24/2010220094190Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/24/2010220094190Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026X01368284-I1Open ↗
08/17/2026X01364654-I1Open ↗
08/13/2026X01311802-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/24/2010220094190Open ↗
11/24/2010220094190Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X01364654-I1Open ↗
08/26/2026X01364654-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/24/2010220094190Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/24/2010220094190Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/24/2010220094190Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01364654-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
11/24/2010220094190Open ↗
▸BISSHED LETTER1
04/29/2011220094190Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
11/24/2010220094190Open ↗