← Back
Elevator apt, semi-fireproof without stores
165 EAST 205 STREET
BRONX · BIN 2017394
💬 Discuss this project
1937Year Built
6Stories
D1Building Class
R8Zoning
22,437 sfGross Floor Area
31Units
Rent Stabilized34 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 165 E. 205TH STREET,LLC · 4,473 sf lot · 5.02 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
4 jobs · most recent 08/27/2025
General Wiring
FiledStatusContractorScope
08/27/2025Permit IssuedDELTA ELEC'L CONTR'G CORPGeneral Wiring
05/20/2025CompleteACCURATE ELEC'L CORP.—
02/21/2020CompleteRICHARD NEU—
02/21/2019Complete247 ELECTRICAL CORP—
1 job · most recent 01/20/2026
Sidewalk Shed
FiledStatusContractorScope
01/20/2026Signed-offNEW YORK CITY PRIME CORPSidewalk Shed
Building Lifecycle
All (73)Filed (3)Permit Issued (5)Signed Off (3)Violation (60)Special Inspection (2)
08/06/2026
Violation issued (HPD, open)
C
08/06/2026
Violation issued (HPD, open)
A
07/30/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
B
07/30/2026
Violation issued (HPD, open)
C
07/22/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01347242-I1
06/08/2026
Signed off — Alteration
FACADE REPAIR TO INCLUDE MASONRY REPAIRS AND REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01312877-I1
05/26/2026
Violation issued (HPD, open)
C
05/26/2026
Violation issued (HPD, open)
B
05/26/2026
Violation issued (HPD, closed)
C
05/24/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, open)
C
04/06/2026
Permit issued — General Construction
X01312877-I1-GC
03/08/2026
Violation issued (HPD, open)
C
03/03/2026
Violation issued (HPD, closed)
A
03/03/2026
Violation issued (HPD, open)
B
03/03/2026
Violation issued (HPD, closed)
A
03/03/2026
Violation issued (HPD, closed)
A
02/07/2026
Violation issued (HPD, closed)
C
02/07/2026
Violation issued (HPD, open)
C
01/24/2026
Violation issued (HPD, closed)
C
01/20/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01347242-I1
01/20/2026
Permit issued — Sidewalk Shed
X01347242-I1-SH
01/19/2026
Violation issued (ECB, closed)
Construction
01/18/2026
Violation issued (HPD, closed)
B
01/18/2026
Violation issued (HPD, open)
C
01/12/2026
Violation issued (HPD, closed)
C
01/11/2026
Violation issued (HPD, closed)
C
01/11/2026
Violation issued (HPD, open)
C
01/11/2026
Violation issued (HPD, open)
C
01/08/2026
Violation issued (HPD, closed)
B
01/08/2026
Violation issued (HPD, closed)
C
01/08/2026
Violation issued (HPD, closed)
A
01/08/2026
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, open)
C
12/31/2025
Violation issued (HPD, closed)
B
12/29/2025
Violation issued (HPD, open)
C
12/29/2025
Violation issued (HPD, open)
C
12/25/2025
Violation issued (HPD, open)
C
12/25/2025
Violation issued (HPD, open)
C
12/25/2025
Violation issued (HPD, open)
C
12/24/2025
Permit issued — General Construction
X01312877-I1-GC
12/16/2025
Violation issued (HPD, closed)
C
12/16/2025
Violation issued (HPD, closed)
C
12/16/2025
Violation issued (HPD, closed)
A
12/16/2025
Violation issued (HPD, closed)
A
12/16/2025
Violation issued (HPD, closed)
A
12/16/2025
Violation issued (HPD, closed)
C
12/16/2025
Violation issued (HPD, closed)
A
12/12/2025
Violation issued (HPD, closed)
B
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, open)
C
12/12/2025
Violation issued (HPD, open)
C
11/24/2025
Filed — Alteration
FACADE REPAIR TO INCLUDE MASONRY REPAIRS AND REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01312877-I1
11/14/2025
Violation issued (HPD, open)
C
11/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
11/03/2025
Violation issued (HPD, open)
C
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHIMIENTI REALTY404/09/2026
NEW YORK CITY PRIME404/09/2026
JASCO604/08/2026
165 E. 205TH STREET,LLC403/22/2026
165 E 205TH STREET LLC CH203/22/2026
165 E 205 ST LLC203/22/2026
165 205TH STREET LLC CHIM103/22/2026
SAJID CONSTRUCTION103/22/2026
CHEMENTER REALTY ASSOCIAT103/22/2026
OWNER OF 165 E 205 STREET103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.101/20/2026
INSITE DESIGN STUDIO111/24/2025
ADITI SARKAR, ARCHITECT, PLLC102/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JASCO, INCGeneral Contractor404/08/2026
VISION CONSTRUCTION BXGeneral Contractor404/09/2026
DIMITRIOS ROSVOGLOUElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
NEW YORK CITY PRIME CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488111/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offVISION CONSTRUCTION BX04/06/2026
DOB NOWSidewalk ShedSigned-offNEW YORK CITY PRIME CORP01/20/2026
DOB NOWGeneral ConstructionSigned-offVISION CONSTRUCTION BX12/24/2025
DOB NOWSidewalk ShedSigned-offJASCO, INC02/17/2021
DOB NOWSidewalk ShedSigned-offJASCO, INC02/22/2020
BISOTISSUEDSAJID CONSTRUCTION CORP04/21/2020
BISOTISSUEDSAJID CONSTRUCTION CORP02/27/2020
BISFBISSUEDJACK PICCINI, INC05/03/2013
BISPLISSUEDA.R.L. PLUMBING & HTG LLC05/03/2013
BISEQISSUEDL&B CONSTRUCTION NY, INC.11/20/2003
BISFSISSUEDNEAL M. RUDIKOFF10/03/2002
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/06/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
11/03/2025FinalJAMES CORNEJOprogress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/17/2026X01312877-I1Request digital key ↗
08/17/2026X01347242-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00315700-I1Request digital key ↗
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION5
05/13/2021240269197Open ↗
04/10/2020240269197Open ↗
02/27/2020240269197Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
02/27/2020240269197Open ↗
05/04/2013220287516Open ↗
05/04/2013220287516Open ↗
▸Seals & Professional Certifications13
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/11/2014220287516Open ↗
05/04/2013220287516Open ↗
05/04/2013220287516Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026X01312877-I1Open ↗
08/17/2026X01347242-I1Open ↗
08/13/2026X00315700-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/27/2020240269197Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/04/2013220287516Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/27/2020240269197Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/27/2020240269197Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/04/2013220287516Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026X01312877-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026X01312877-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE5
02/05/2014220287516Open ↗
01/11/2014220287516Open ↗
12/27/2013220287516Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING1
05/04/2013220287516Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
02/27/2020240269197Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00315700-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/04/2013220287516Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01312877-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/11/2014220287516Open ↗
05/04/2013220287516Open ↗
05/04/2013220287516Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/11/2014220287516Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/27/2020240269197Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/11/2014220287516Open ↗
05/04/2013220287516Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/11/2014220287516Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
02/27/2020240269197Open ↗
02/11/2014220287516Open ↗
05/04/2013220287516Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
02/27/2020240269197Open ↗
▸BISEFILING COVER SHEET1
05/04/2013220287516Open ↗