← Back
Over six families without stores
2767 MORRIS AVENUE
BRONX · BIN 2017515
💬 Discuss this project
1923Year Built
5Stories
C1Building Class
R8Zoning
—Gross Floor Area
26Units
30 Open Violations ▸
Over six families without stores · Owner of record: JMV REALTY CORP · 3.83 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 5Under Construction3p · 1 filing · 8 docs
Floor 4Under Construction3p · 1 filing · 8 docs
Floor 3Under Construction3p · 1 filing · 8 docs
Floor 2Under Construction3p · 1 filing · 8 docs
Floor 1Under Construction3p · 1 filing · 8 docs
BasementUnder Construction1p · 1 filing · 8 docs
Sub-BasementUnder Construction3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIMLEKA REALTY104/09/2026
J M V REALTY603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSS ENGINEERS206/22/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXPRESS PL SWR & WTR APlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492206/22/2026
Building Lifecycle
All (71)Filed (2)Permit Issued (1)Violation (60)Inspection (4)Special Inspection (4)
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2026
Filed — Alteration
INTERIOR PLUMBING WORK. REMOVAL OF ALL GAS METERS SERVICING 26 APTS AND PIPING , THE SYSTEM WILL BE TRANSFORMED FROM EACH EXISTING APT GAS METERS TO INDIVIDUAL METER LOCATED IN THE BASEMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
X01368712-P1
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/30/2026
Violation issued (HPD, open)
A
04/06/2026
Permit issued — Plumbing
X01368712-I1-PL
03/25/2026
Filed — Alteration
INTERIOR PLUMBING WORK. REMOVAL OF ALL GAS METERS SERVICING 26 APTS AND PIPING , THE SYSTEM WILL BE TRANSFORMED FROM EACH EXISTING APT GAS METERS TO INDIVIDUAL METER LOCATED IN THE BASEMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
X01368712-I1
02/04/2026
Violation issued (HPD, open)
C
02/04/2026
Violation issued (HPD, closed)
C
01/10/2026
Violation issued (HPD, open)
B
01/10/2026
Violation issued (HPD, open)
B
01/10/2026
Violation issued (HPD, closed)
C
01/10/2026
Violation issued (HPD, open)
C
11/18/2025
Violation issued (HPD, closed)
I
10/19/2025
Violation issued (HPD, open)
A
10/19/2025
Violation issued (HPD, closed)
C
09/13/2025
Violation issued (HPD, open)
C
06/05/2025
Violation issued (HPD, open)
A
12/05/2024
Violation issued (HPD, open)
B
12/05/2024
Violation issued (HPD, open)
A
12/05/2024
Violation issued (HPD, open)
C
12/05/2024
Violation issued (HPD, open)
B
11/30/2024
Violation issued (HPD, open)
B
11/30/2024
Violation issued (HPD, open)
A
11/30/2024
Violation issued (HPD, closed)
B
09/01/2024
Violation issued (HPD, open)
C
09/01/2024
Violation issued (HPD, open)
A
04/30/2024
Violation issued (HPD, closed)
C
04/30/2024
Violation issued (HPD, open)
B
04/30/2024
Violation issued (HPD, closed)
C
04/03/2024
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
I
08/25/2023
Violation issued (HPD, closed)
B
08/25/2023
Violation issued (HPD, closed)
B
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/25/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, closed)
B
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2023
Violation issued (HPD, closed)
A
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
C
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
B
02/01/2023
Violation issued (HPD, closed)
A
02/01/2023
Violation issued (HPD, closed)
A
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedEXPRESS PLBG SWR & WTR MA04/06/2026
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING02/12/2015
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING02/20/2014
1 project · most recent 06/22/2026
Gas
FiledStatusContractorScope
06/22/2026Permit IssuedEXPRESS PLBG SWR & WTR MAGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/22/2026Tenant Protection Plan Compliance—special
06/22/2026Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
06/16/2026Tenant Protection Plan Compliance—special
06/12/2026Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026X01368712-P1Request digital key ↗
08/17/2026X01368712-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
02/26/2015240048845Open ↗
02/20/2014240048845Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/20/2014240048845Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026X01368712-I1Open ↗
08/17/2026X01368712-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X01368712-P1Open ↗
08/22/2026X01368712-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/20/2014240048845Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/20/2014240048845Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/20/2014240048845Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/08/2017240048845Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01368712-P1Open ↗
08/17/2026X01368712-I1Open ↗
▸Energy Compliance1
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/20/2014240048845Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/20/2014240048845Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/26/2015240048845Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/08/2017240048845Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
12/08/2017240048845Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/20/2014240048845Open ↗