← Back
One story retail building
2 BEDFORD PARK BLVD
BRONX · BIN 2017611
💬 Discuss this project
1926Year Built
1Stories
K1Building Class
R8Zoning
6,305 sfGross Floor Area
9Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 2-14 BEDFORD PARK BLVD · 6,305 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction4p · 1 filing · 12 docs
1 job · most recent 06/22/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
06/22/2026Permit Issued1 DNA DESIGNS INCOthers
Other
Captiveaire Captive Aire , DU50HFA 1,750 CFM · Kitchen Exhaust ×1
1 job · most recent 06/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/22/2026Permit IssuedSIGNORE & SONS PLBG CORPGas, Water/Sanitary
1 job · most recent 09/17/2025
General Wiring
FiledStatusContractorScope
09/17/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
Building Lifecycle
All (39)Filed (5)Permit Issued (5)Signed Off (1)Violation (18)Inspection (2)Special Inspection (8)
06/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2026
Filed — Alteration
Interior renovation of the existing store as per plan. No change to use, egress or occupancy under this application.
X01299045-P1
05/04/2026
Permit issued — Plumbing
X01299045-S1-PL
10/16/2025
Permit issued — General Construction
X01299045-I1-GC
10/10/2025
Filed — Alteration
Interior renovation of the existing store as per plan. No change to use, egress or occupancy under this application.
X01299045-I1
10/10/2025
Filed — Alteration
Interior renovation of the existing store as per plan. No change to use, egress or occupancy under this application.
X01299045-S1
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
10/07/2025
Special inspection requirement — Final
Samy Abouzid
10/07/2025
Special inspection requirement — Mechanical Systems
Samy Abouzid
06/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/01/2024
Violation issued (FDNY_ORDER, closed)
09/29/2022
Signed off — Alteration
X00739397-I1
09/14/2022
Permit issued — General Construction
X00739397-I1-GC
07/15/2022
Permit issued — Sidewalk Shed
X00720396-I1-SH
06/03/2022
Permit issued — Sidewalk Shed
X00720396-I1-SH
05/22/2022
Filed — Alteration
X00739397-I1
05/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMIR ABDALLA
05/16/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMIR ABDALLA
05/16/2022
Special inspection requirement — Final
SAMIR ABDALLA
05/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMIR ABDALLA
05/16/2022
Special inspection requirement — Masonry
SAMIR ABDALLA
04/19/2022
Filed — Alteration
X00720396-I1
04/18/2022
Violation issued (ECB, closed)
Construction
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/27/2001
Violation issued (ECB, closed)
Construction
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/1988
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMS CONTRACTOR607/08/2026
AZ GROUP CONTRACTING503/22/2026
2-14 BEDFORD PARK BLVD203/22/2026
214 BEDFORD REALTY CO103/22/2026
LORDAE REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INFINITY DESIGN CONSULTANT INC306/22/2026
LIGHT HOUSE105/22/2022
MOHAMMAD AHEAD, PE104/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
GREEN STUDIO403/21/2026
SERVICE CORP103/21/2026
SERVICE103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AZ GROUP CONTRACTING INCGeneral Contractor303/21/2026
GSR CONTRACTOR INCGeneral Contractor303/21/2026
REEDY, GWENDOLYNElectrical203/21/2026
1 DNA DESIGNS INCGeneral Contractor104/09/2026
AMS CONTRACTOR INCGeneral Contractor107/08/2026
SIGNORE & SONS PLBG CORPPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAMY ABOUZID ENGINEERING9517110/10/2025
LIGHTHOUSE5538105/22/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP05/04/2026
DOB NOWGeneral ConstructionPermit Issued1 DNA DESIGNS10/16/2025
DOB NOWGeneral ConstructionSigned-offAZ GROUP CONTRACTING INC09/14/2022
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC07/15/2022
DOB NOWSidewalk ShedPermit IssuedAMS CONTRACTOR INC06/03/2022
BISFPISSUEDNY BUSINESS FIRE SYSTEM INC02/06/2002
BISPLISSUEDC.R.U. MECHAN & HEAT INC01/26/2002
BISOTISSUEDKORMAN DESIGN & BUILD01/09/2002
BISFPISSUEDIDEAL FIRE CONTROL INC07/10/2001
BISMHISSUEDFORDHAM REFRI & AIR-COND02/27/2001
BISPLISSUEDMAGOR PLUMBING & HEATING04/29/1998
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/01/1998
BISOTISSUEDGOOD-WILL MECHANICAL CORP.03/24/1998
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/09/2025Fire-Resistant Penetrations and JointsSamy Abouzidspecial
10/07/2025FinalSamy Abouzidprogress
10/07/2025Mechanical SystemsSamy Abouzidspecial
05/16/2022Structural Stability – Alterations of existing buildingsSAMIR ABDALLAspecial
05/16/2022Energy Code Compliance InspectionsSAMIR ABDALLAprogress
05/16/2022FinalSAMIR ABDALLAprogress
05/16/2022Fire-Resistant Penetrations and JointsSAMIR ABDALLAspecial
05/16/2022MasonrySAMIR ABDALLAspecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026X00720396-I1Request digital key ↗
08/24/2026X00739397-I1Request digital key ↗
08/18/2026X01299045-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026X00720396-I1Open ↗
08/24/2026X00739397-I1Open ↗
08/18/2026X01299045-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X01299045-I1Open ↗
09/23/2026X01299045-I1Open ↗
08/24/2026X00739397-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026X01299045-I1Open ↗
08/24/2026X00739397-I1Open ↗
08/24/2026X00739397-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026X01299045-P1Open ↗
08/13/2026X01299045-I1Open ↗
08/13/2026X01299045-S1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026X00739397-I1Open ↗