← Back
Over six families without stores
375 E MOSHOLU PARKWAY N
BRONX · BIN 2017934
💬 Discuss this project
1937Year Built
6Stories
C1Building Class
R7AZoning
62,118 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized60 Open Violations ▸
Over six families without stores · Owner of record: MOSHOLU PARTNERS III LLC · 16,500 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
38 R HOLDING CO. LLC903/22/2026
MOSHOLU PARTNERS III LLC103/22/2026
53 HOLDING703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2025$5.7M—— → —$92/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL DENIS ASSOCIATES207/17/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXPRESS PL SWR & WTR APlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL DENIS ASSOCIATES2472207/17/2023
Building Lifecycle
All (69)Filed (2)Permit Issued (2)Violation (60)Inspection (4)Special Inspection (1)
04/30/2026
Violation issued (HPD, closed)
A
01/05/2026
Violation issued (HPD, closed)
C
01/05/2026
Violation issued (HPD, closed)
C
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
12/26/2023
Violation issued (HPD, closed)
B
08/01/2023
Permit issued — Plumbing
X00642309-I1-PL
07/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL DENIS
07/17/2023
Filed — Alteration
HEREBY FILING TO INSTALL 1 NEW TWIN SET METER IN THE CELLAR FOR BUILDING, REMOVE EXISTING GAS PIPING AND INSTALL NEW GAS PIPING THRU THE BUILDING FROM METER TO EXISTING GAS RANGES, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X00642309-P1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2022
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
10/25/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2022
Violation issued (HPD, open)
C
08/04/2022
Violation issued (HPD, open)
C
08/04/2022
Violation issued (HPD, open)
C
05/25/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/10/2022
Permit issued — Plumbing
X00642309-I1-PL
12/30/2021
Filed — Alteration
HEREBY FILING TO INSTALL 1 NEW TWIN SET METER IN THE CELLAR FOR BUILDING, REMOVE EXISTING GAS PIPING AND INSTALL NEW GAS PIPING THRU THE BUILDING FROM METER TO EXISTING GAS RANGES, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X00642309-I1
12/12/2021
Violation issued (HPD, open)
C
11/24/2021
Violation issued (HPD, closed)
C
11/24/2021
Violation issued (HPD, open)
C
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2019
Violation issued (HPD, open)
B
06/10/2019
Violation issued (HPD, open)
B
06/10/2019
Violation issued (HPD, open)
B
06/10/2019
Violation issued (HPD, closed)
C
06/10/2019
Violation issued (HPD, closed)
A
06/10/2019
Violation issued (HPD, closed)
B
06/10/2019
Violation issued (HPD, closed)
B
06/10/2019
Violation issued (HPD, closed)
B
06/10/2019
Violation issued (HPD, closed)
B
05/03/2019
Violation issued (HPD, open)
C
05/03/2019
Violation issued (HPD, closed)
B
05/03/2019
Violation issued (HPD, closed)
B
05/03/2019
Violation issued (HPD, closed)
B
05/03/2019
Violation issued (HPD, closed)
B
05/03/2019
Violation issued (HPD, closed)
B
05/03/2019
Violation issued (HPD, closed)
B
05/03/2019
Violation issued (HPD, closed)
B
01/31/2019
Violation issued (HPD, open)
C
01/02/2019
Violation issued (HPD, open)
A
12/24/2018
Violation issued (HPD, closed)
C
12/24/2018
Violation issued (HPD, closed)
A
12/24/2018
Violation issued (HPD, open)
C
12/24/2018
Violation issued (HPD, closed)
B
10/11/2018
Violation issued (HPD, open)
B
10/11/2018
Violation issued (HPD, closed)
B
10/11/2018
Violation issued (HPD, closed)
B
10/11/2018
Violation issued (HPD, closed)
B
10/11/2018
Violation issued (HPD, closed)
B
10/11/2018
Violation issued (HPD, closed)
A
07/25/2018
Violation issued (HPD, closed)
C
07/25/2018
Violation issued (HPD, closed)
A
07/25/2018
Violation issued (HPD, closed)
B
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEXPRESS PLBG SWR & WTR MA08/01/2023
DOB NOWPlumbingSigned-offEXPRESS PLBG SWR & WTR MA01/10/2022
BISOTISSUEDNY LANDMARKS GEN CONSTRUC08/26/2009
BISEQISSUEDROCK SCAFFOLDING CORP08/19/2009
BISOTISSUEDSEOUL CONSTRUCTION, CO.03/26/2004
BISEQISSUEDSEOUL CONSTRUCTION INC.03/26/2004
BISOTISSUEDDOUGLAS SIMMONS/A.L. EASTMOND02/21/2001
BISFBISSUEDAMBASSADOR FUEL08/31/1999
1 project · most recent 07/17/2023
Gas
FiledStatusContractorScope
07/17/2023Signed-offEXPRESS PL SWR & WTR AGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/07/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/25/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/25/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/18/2023Fire-Resistant Penetrations and JointsPAUL DENISspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026X00642309-P1Request digital key ↗
08/24/2026X00642309-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/26/2009220025023Open ↗
08/19/2009220023980Open ↗
▸BISWORK PERMIT APPLICATION2
08/26/2009220025023Open ↗
08/19/2009220023980Open ↗
▸Seals & Professional Certifications8
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/26/2009220025023Open ↗
08/19/2009220023980Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/26/2009220025023Open ↗
08/19/2009220023980Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026X00642309-I1Open ↗
08/13/2026X00642309-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/26/2009220025023Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X00642309-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
08/26/2009220025023Open ↗
08/19/2009220023980Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026X00642309-I1Open ↗
08/13/2026X00642309-P1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
08/26/2009220025023Open ↗
08/19/2009220023980Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/26/2009220025023Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/26/2009220025023Open ↗
08/19/2009220023980Open ↗