← Back
One story retail building
3165 BAINBRIDGE AVENUE
BRONX · BIN 2018027
💬 Discuss this project
1928Year Built
1Stories
K1Building Class
R5DZoning
6,242 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
One story retail building · 7,500 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
Mechanical
Roof4p · 2 filings · 17 docs
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GEORGE RANALLO PROPERTIES707/08/2026
BROTHERLY BUILDS CONSTRUCTION407/08/2026
OWNER OF 3171 BAINBRIDGE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THORNTON TOMASETTI201/31/2025
ASHRAF CORP101/13/2025
MERRITT ENGINEERING CONSULTANTS, DPC108/09/2024
ASR ENGINEERING PC104/17/2024
HC ARCHITECT, PC106/16/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
SUPERIOR FIRE CONTROL103/21/2026
OUTSOURCE CONSULTANTS, INC.403/21/2026
JP EXPEDITE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPERIOR FIRE CONTROL INCGeneral Contractor303/21/2026
NEW YORK PLBG-HTG-COOLINGPlumbing203/22/2026
CRAIG SAMUELSElectrical103/21/2026
BROTHERLY BUILDS CONSTRUCGeneral Contractor107/08/2026
PERFORMANCE MECHANCIALGeneral Contractor107/08/2026
SIGNS CADScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827201/31/2025
BITOPI CONSULTANTS LLC7036101/13/2025
MERRITT ENGINEERING CONSU460108/09/2024
SYED ENGINEERING, P.C.7054104/17/2024
Building Lifecycle
All (34)Filed (6)Permit Issued (4)Signed Off (3)Violation (2)Objection (2)Special Inspection (17)
03/14/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS WORK TO INCLUDE HVAC REPLACEMENT OF AN 18 TON UNIT ON ROOF. NO CHANGE OF USE, EGRESS OR OCCUPANCY (INTERNAL PROJECT REF#48100R014234)
X01076701-I1
02/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
02/07/2025
Special inspection requirement — Mechanical Systems
JONAR MADRIAGA
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
02/07/2025
Special inspection requirement — Final
JONAR MADRIAGA
02/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
JONAR MADRIAGA
02/07/2025
Special inspection requirement — Maintenance information
JONAR MADRIAGA
02/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JONAR MADRIAGA
02/07/2025
Special inspection requirement — Shutoff dampers
JONAR MADRIAGA
01/31/2025
Filed — Alteration
MECHANICAL MODIFICATIONS WORK TO INCLUDE HVAC REPLACEMENT OF AN 18 TON UNIT ON ROOF. NO CHANGE OF USE, EGRESS OR OCCUPANCY (INTERNAL PROJECT REF#48100R014234)
X01076701-P1
01/17/2025
Permit issued — Mechanical Systems
X01156518-I1-MS
01/13/2025
Filed — Alteration
X01156518-I1
11/19/2024
Permit issued — Mechanical Systems
X01076701-I1-MS
10/24/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Fire_Protection
10/18/2024
Filed — Alteration
MECHANICAL MODIFICATIONS WORK TO INCLUDE HVAC REPLACEMENT OF AN 18 TON UNIT ON ROOF. NO CHANGE OF USE, EGRESS OR OCCUPANCY (INTERNAL PROJECT REF#48100R014234)
X01076701-I1
08/09/2024
Filed — Alteration
REPLACE 1ST FLOOR SPLIT SYSTEM AND REPLACE ROOFTOP AC UNIT FOR CHASE BANK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00688856-I1
05/28/2024
Signed off — Alteration
PROPOSED BRICK REPLACEMENT OF REAR SIDE PARAPET WALL TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01035380-I1
04/23/2024
Permit issued — General Construction
X01035380-I1-GC
04/17/2024
Filed — Alteration
PROPOSED BRICK REPLACEMENT OF REAR SIDE PARAPET WALL TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01035380-I1
02/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Krepcio
02/28/2022
Special inspection requirement — Mechanical Systems
Christopher Krepcio
02/28/2022
Special inspection requirement — Final
Christopher Krepcio
02/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Krepcio
02/28/2022
Special inspection requirement — Maintenance information
Christopher Krepcio
02/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Krepcio
02/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Krepcio
02/28/2022
Special inspection requirement — Electrical motors and elevators
Christopher Krepcio
10/13/2020
Signed off — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN ON METAL PANEL, NO CHANGE TO USE, EGRESS OR OCCUPATION
X00353836-I1
06/17/2020
Permit issued — Sign
X00353836-I1-SG
06/16/2020
Filed — Alteration
REPLACE ILLUMINATED ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN ON METAL PANEL, NO CHANGE TO USE, EGRESS OR OCCUPATION
X00353836-I1
06/02/2020
Special inspection requirement — Final
Hackjong Choi
09/10/2009
Violation issued (ECB, open)
Plumbing
01/19/2000
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSUPERIOR FIRE CONTROL INC01/17/2025
DOB NOWMechanical SystemsSigned-offPERFORMANCE MECHANCIAL11/19/2024
DOB NOWGeneral ConstructionSigned-offBROTHERLY BUILDS CONSTRUC04/23/2024
DOB NOWSignSigned-offSIGNS CAD CORP06/17/2020
BISEQISSUEDINTERSYSTEMS CORPORATION06/11/2010
BIS—ISSUEDNATIONAL MAINTENANCE INC.06/05/2006
BISEQISSUEDOUTDOOR INSTALLATIONS LLC12/19/2005
BISPLISSUEDROCCO FANELLI01/25/2005
BISMHISSUEDMARLIN MECHANICAL INC12/28/2004
BISOTISSUEDBROOKSIDE CONTRACTING CO., INC.03/09/1999
BISPLISSUEDH BRONNER & SON PLBG & HTG04/03/1997
BISFPISSUEDIDEAL FIRE CONTROL03/26/1997
BISMHISSUEDOBI CONSTRUCTION03/25/1997
BISOTISSUEDOBI CONSTRUCTION03/24/1997
BISEQISSUEDOBI CONSTRUCTION03/24/1997
BIS—ISSUEDLETTERA SIGN & ELECTRIC CO INC09/10/1996
1 project · most recent 08/09/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/09/2024——Air Conditioning Systems, Heating Systems
Cooling
Carrier 48HCFD17A3M5-6W5JO 15 tons · Rooftop Unit ×1
Heating
Mitsubishi Electric PUY-A18KK17 2 tons · Heat Pump Outdoor ×1
Trane PKA-A18MKA7 18,000 BTU · Vrf Indoor ×1
4 projects · most recent 06/12/2020
General Wiring
FiledStatusContractorScope
06/12/2020Permit IssuedAMPERE ELECL SERVICES COR—
06/12/2020Permit IssuedAMPERE ELECL SERVICES COR—
10/28/2019CompleteCUBE ELECTRICAL CORPGeneral Wiring
08/07/2019CompleteUNITY ELECTRIC CO INC—
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/07/2025HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
02/07/2025Mechanical SystemsJONAR MADRIAGAspecial
02/07/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
02/07/2025FinalJONAR MADRIAGAprogress
02/07/2025HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
02/07/2025Maintenance informationJONAR MADRIAGAenergy_progress
02/07/2025HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
02/07/2025Shutoff dampersJONAR MADRIAGAenergy_progress
02/28/2022Fire-Resistant Penetrations and JointsChristopher Krepciospecial
02/28/2022Mechanical SystemsChristopher Krepciospecial
02/28/2022FinalChristopher Krepcioprogress
02/28/2022HVAC-R and service water heating system controlsChristopher Krepcioenergy_progress
02/28/2022Maintenance informationChristopher Krepcioenergy_progress
02/28/2022HVAC-R and service water heating equipmentChristopher Krepcioenergy_progress
02/28/2022HVAC-R and service water piping design and insulationChristopher Krepcioenergy_progress
02/28/2022Electrical motors and elevatorsChristopher Krepcioenergy_progress
06/02/2020FinalHackjong Choiprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/21/2026X01035380-I1Request digital key ↗
08/21/2026X00688856-I1Request digital key ↗
08/20/2026X01076701-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign1
08/26/2026X00353836-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
11/05/2020200258595Open ↗
11/05/2020200338321Open ↗
06/11/2010220066960Open ↗
▸BISWORK PERMIT APPLICATION1
06/11/2010220066960Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature9
09/21/2026X00688856-I1Open ↗
09/21/2026X00688856-I1Open ↗
09/01/2026X00353836-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026X01076701-P1Open ↗
08/20/2026X01076701-I1Open ↗
08/20/2026X01156518-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/21/2026X00688856-I1Open ↗
09/21/2026X00688856-I1Open ↗
08/26/2026X01076701-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/11/2010220066960Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/11/2010220066960Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/11/2010220066960Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026X01076701-P1Open ↗
08/20/2026X01076701-I1Open ↗
08/20/2026X01156518-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/11/2010220066960Open ↗
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
11/10/2020200539961Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/11/2010220066960Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/11/2010220066960Open ↗