← Back
Elevator apt, semi-fireproof without stores
277 EAST 207 STREET
BRONX · BIN 2018160
💬 Discuss this project
1959Year Built
8Stories
D1Building Class
R7BZoning
75,000 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized13 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 277 EASTCO, LLC · 17,500 sf lot · 4.29 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRYAX REALTY MANAGEMENT907/08/2026
277 EASTCO1103/22/2026
BOULIS CONSTRUCTION103/22/2026
277 EAST303/22/2026
GOODMAN MGT CO INC103/22/2026
5N5 BLDG ASSOC.103/22/2026
SNG BUILDING ASSOC C O GOODMAN203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS106/05/2024
ASR ENGINEERING PC102/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING,CON203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOPLINE NYC INCGeneral Contractor704/09/2026
BOULIS CONSTRUCTION CORPGeneral Contractor507/08/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE6799106/05/2024
Building Lifecycle
All (88)Filed (2)Permit Issued (6)Signed Off (2)Facade (FISP) (18)Violation (60)
04/10/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01004670-I1
03/09/2026
Permit issued — Sidewalk Shed
X01004670-I1-SH
08/01/2025
Cycle 9 facade report submitted
08/01/2025
Cycle 9 facade report signed — SAFE
07/28/2025
Cycle 9 facade inspection completed
07/24/2025
Signed off — Alteration
X01040106-I1
05/22/2025
Violation issued (HPD, closed)
C
05/22/2025
Violation issued (HPD, closed)
C
02/17/2025
Violation issued (HPD, closed)
A
02/17/2025
Violation issued (HPD, closed)
A
02/17/2025
Violation issued (HPD, closed)
B
02/17/2025
Violation issued (HPD, closed)
C
02/17/2025
Violation issued (HPD, closed)
C
02/17/2025
Violation issued (HPD, closed)
B
02/17/2025
Violation issued (HPD, closed)
C
02/17/2025
Violation issued (HPD, closed)
B
02/17/2025
Violation issued (HPD, closed)
B
02/14/2025
Permit issued — General Construction
X01040106-I1-GC
01/28/2025
Permit issued — Sidewalk Shed
X01004670-I1-SH
01/21/2025
Violation issued (ECB, closed)
Construction
01/03/2025
Cycle 9 facade report submitted
01/03/2025
Cycle 9 facade report signed — UNSAFE
01/03/2025
Violation issued (ECB, closed)
Unknown
01/03/2025
Violation issued (ECB, closed)
Construction
12/30/2024
Cycle 9 facade inspection completed
12/12/2024
Permit issued — General Construction
X01040106-I1-GC
08/19/2024
Violation issued (HPD, closed)
B
08/19/2024
Violation issued (HPD, closed)
B
08/19/2024
Violation issued (HPD, closed)
B
08/19/2024
Violation issued (HPD, closed)
A
08/19/2024
Violation issued (HPD, closed)
B
08/19/2024
Violation issued (HPD, closed)
B
08/19/2024
Violation issued (HPD, closed)
B
08/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/15/2024
Permit issued — General Construction
X01040106-I1-GC
06/20/2024
Violation issued (HPD, closed)
C
06/20/2024
Violation issued (HPD, closed)
A
06/20/2024
Violation issued (HPD, closed)
B
06/05/2024
Filed — Alteration
X01040106-I1
03/04/2024
Violation issued (ECB, closed)
Construction
02/20/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade report signed — UNSAFE
02/20/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2024
Permit issued — Sidewalk Shed
X01004670-I1-SH
02/16/2024
Cycle 9 facade inspection completed
02/15/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01004670-I1
09/13/2023
Violation issued (HPD, closed)
A
09/13/2023
Violation issued (HPD, closed)
B
09/13/2023
Violation issued (HPD, closed)
B
09/13/2023
Violation issued (HPD, closed)
B
09/06/2023
Violation issued (HPD, closed)
B
09/06/2023
Violation issued (HPD, closed)
B
05/02/2023
Violation issued (HPD, closed)
A
04/26/2023
Violation issued (HPD, closed)
B
03/29/2023
Violation issued (HPD, closed)
B
03/29/2023
Violation issued (HPD, closed)
C
03/21/2023
Violation issued (HPD, closed)
C
03/21/2023
Violation issued (HPD, closed)
C
03/21/2023
Violation issued (HPD, closed)
B
03/02/2023
Violation issued (HPD, closed)
C
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC03/09/2026
DOB NOWGeneral ConstructionSigned-offBOULIS CONSTRUCTION CORP02/14/2025
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC01/28/2025
DOB NOWGeneral ConstructionSigned-offBOULIS CONSTRUCTION CORP12/12/2024
DOB NOWGeneral ConstructionSigned-offBOULIS CONSTRUCTION CORP07/15/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC02/16/2024
BISOTISSUEDFIVE BORO RESTORATION GC07/07/2022
BISOTISSUEDFIVE BORO RESTORATION GC12/21/2021
BISOTISSUEDBEST ENERGY POWER 2015 LL06/22/2020
BISPLISSUEDBAUER MECHANCIAL LLC03/22/2016
BISOTISSUEDG. BAUER, INC03/22/2016
BIS—ISSUEDUNIVERSAL CONSTRUCTION IN03/03/2006
BISBLISSUEDC C CONTROLLED COMBUSTION01/20/2004
BISSPISSUEDD & LPLUMBING AND HEATING12/18/1990
BISOTISSUEDARN ENVIRONMENTAL CO. INC.10/19/1990
2 projects · most recent 02/17/2024
FiledStatusContractorScope
02/17/2024Permit IssuedRICHARD NEU—
06/24/2020CompleteRJ RUSSO ELECTRIC CO.1 meters, 1 new_meters
Nothing on file for this building.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026X01004670-I1Request digital key ↗
08/21/2026X01040106-I1Request digital key ↗
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION5
12/21/2021240294926Open ↗
06/22/2020240272352Open ↗
03/18/2016240136018Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
11/25/2020240294926Open ↗
04/30/2020240272352Open ↗
03/18/2016240136018Open ↗
▸Seals & Professional Certifications10
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/25/2020240294926Open ↗
03/18/2016240136018Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/25/2020240294926Open ↗
03/18/2016240136018Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/25/2020240294926Open ↗
03/18/2016240136018Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026X01040106-I1Open ↗
08/13/2026X01004670-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/03/2018240136018Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/30/2020240272352Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
03/18/2016240136018Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/18/2016240136018Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
04/30/2020240272352Open ↗
03/18/2016240136018Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/21/2021240294926Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/25/2020240294926Open ↗
04/30/2020240272352Open ↗
03/18/2016240136018Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026X01040106-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/08/2021240272352Open ↗
11/25/2020240294926Open ↗
04/30/2020240272352Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/25/2020240294926Open ↗
03/18/2016240136018Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/08/2021240272352Open ↗
05/03/2018240136018Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/18/2022240294926Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/03/2018240136018Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/21/2021240294926Open ↗
▸BISINTERIOR LIGHTING POWER1
10/19/2022240294926Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
03/24/2021240272352Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/30/2020240272352Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/18/2022240294926Open ↗
▸BISLIGHTING IN DWELLING UNITS1
10/19/2022240294926Open ↗
▸BISLIGHTING CONTROLS1
10/19/2022240294926Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/21/2021240294926Open ↗
03/08/2021240272352Open ↗
11/25/2020240294926Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/08/2021240272352Open ↗
03/08/2021240272352Open ↗
05/03/2018240136018Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/19/2022240294926Open ↗
03/24/2021240272352Open ↗
05/03/2018240136018Open ↗
▸BISFINAL1
10/18/2022240294926Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
03/08/2021240272352Open ↗
11/25/2020240294926Open ↗
04/30/2020240272352Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/18/2022240294926Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET3
11/25/2020240294926Open ↗
04/30/2020240272352Open ↗
03/18/2016240136018Open ↗
▸BISADDITIONAL INFORMATION2
03/05/2021240272352Open ↗
03/06/2018240136018Open ↗
▸BISBOROUGH INTAKE FORM1
05/03/2018240136018Open ↗
▸Other Documents1
▸BISTax Abatement Miscellaneous1
03/08/2021240272352Open ↗