← Back
Elevator apt, semi-fireproof without stores
3312 HULL AVENUE
BRONX · BIN 2018493
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R6BZoning
52,000 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized2 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 3310-12 HULL AVENUEASSOCIATES · 10,000 sf lot · 5.2 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar3p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BENENSON REAL ESTATE1404/09/2026
3310-12 HULL AVENUEASSOCIATES903/22/2026
2210-12 HULL AVENUE ASSOC103/22/2026
R N B FOUNDATION INC203/22/2026
3310 HULL AVE ASSOCIATE L103/22/2026
BENXON FUNDING CORP103/22/2026
BENENSON FONG CORP.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REVANS DESIGN PE PC301/13/2026
BANGASH ASSOCIATES INC.111/13/2025
NEW AGE ENGINEERING PLLC101/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC PERMIT EXPEDITING203/21/2026
R GERMAIN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARAGON GENERAL CONTRACTGeneral Contractor303/21/2026
ADV NY INCGeneral Contractor203/21/2026
CAM ENERGY HTG&MECH CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REVANS DESIGN PE PC4617301/13/2026
BANGASH ASSOCIATES INC8488111/13/2025
NEW AGE ENGINEERING PLLC7746101/26/2025
Building Lifecycle
All (91)Filed (5)Permit Issued (5)Signed Off (2)Violation (60)Inspection (3)Special Inspection (16)
03/24/2026
Signed off — Alteration
REPLACE (1) NEW LOW PRESSURE STEAM BOILER & (1) NEW COMBINATION NAT GAS/#2 OIL BURNER. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X01140158-S1
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
PAUL REVANS
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
01/13/2026
Filed — Alteration
REPLACE (1) NEW LOW PRESSURE STEAM BOILER & (1) NEW COMBINATION NAT GAS/#2 OIL BURNER. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X01140158-P1
12/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Permit issued — General Construction
X01311304-I1-GC
11/13/2025
Filed — Alteration
FACADE REPAIR, INCLUDES MORTAR RE-POINTING AND REPAIR, AS SHOWN ON PLANS
X01311304-I1
10/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
10/30/2025
Special inspection requirement — Final
FAZAL BANGASH
10/30/2025
Special inspection requirement — Masonry
FAZAL BANGASH
10/10/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/22/2025
Violation issued (ECB, closed)
Construction
08/20/2025
Permit issued — Plumbing
X01140158-S1-PL
05/15/2025
Permit issued — Plumbing
X01140158-S1-PL
04/09/2025
Filed — Alteration
REPLACE (1) NEW LOW PRESSURE STEAM BOILER & (1) NEW COMBINATION NAT GAS/#2 OIL BURNER. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X01140158-S1
04/07/2025
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
X01151417-I1
03/19/2025
Permit issued — Boiler Equipment
X01140158-I1-BE
03/07/2025
Filed — Alteration
REPLACE (1) NEW LOW PRESSURE STEAM BOILER & (1) NEW COMBINATION NAT GAS/#2 OIL BURNER. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPANCY.
X01140158-I1
02/11/2025
Permit issued — Mechanical Systems
X01151417-I1-MS
01/26/2025
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
X01151417-I1
01/26/2025
Special inspection requirement — Chimneys and vents
Stephen Shishko
12/05/2024
Special inspection requirement — Final
Stephen Shishko
12/05/2024
Special inspection requirement — Mechanical Systems
Stephen Shishko
12/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
11/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
11/10/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
PAUL REVANS
11/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
11/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
PAUL REVANS
11/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
11/10/2024
Special inspection requirement — Maintenance information
PAUL REVANS
11/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
02/22/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (HPD, closed)
A
02/22/2024
Violation issued (HPD, closed)
C
02/22/2024
Violation issued (HPD, closed)
A
02/22/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (HPD, closed)
C
02/22/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (HPD, closed)
B
11/13/2023
Violation issued (HPD, closed)
B
11/13/2023
Violation issued (HPD, closed)
A
11/13/2023
Violation issued (HPD, closed)
B
11/13/2023
Violation issued (HPD, closed)
A
11/13/2023
Violation issued (HPD, closed)
A
11/13/2023
Violation issued (HPD, closed)
B
11/13/2023
Violation issued (HPD, closed)
C
11/13/2023
Violation issued (HPD, closed)
A
04/17/2023
Violation issued (HPD, closed)
A
04/17/2023
Violation issued (HPD, closed)
C
04/17/2023
Violation issued (HPD, closed)
C
04/17/2023
Violation issued (HPD, closed)
C
04/17/2023
Violation issued (HPD, closed)
C
04/17/2023
Violation issued (HPD, closed)
B
04/17/2023
Violation issued (HPD, closed)
B
03/17/2023
Violation issued (HPD, closed)
A
02/27/2023
Violation issued (HPD, closed)
C
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPARAGON GENERAL CONTRACTO11/20/2025
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP08/20/2025
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP05/15/2025
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH03/19/2025
DOB NOWMechanical SystemsSigned-offADV NY02/11/2025
BISFSISSUEDCASTLE OIL CORPORATION05/29/2002
1 project · most recent 01/13/2026
Gas
FiledStatusContractorScope
01/13/2026Signed-offCAM ENERGY HTG&MECH CORPGas
1 project · most recent 06/03/2026
Boiler Controls
FiledStatusContractorScope
06/03/2026CompleteTESTA ELECTRIC CO., INCBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
01/14/2026Tenant Protection Plan CompliancePAUL REVANSspecial
01/14/2026Fire-Resistant Penetrations and JointsPAUL REVANSspecial
10/31/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
10/30/2025FinalFAZAL BANGASHprogress
10/30/2025MasonryFAZAL BANGASHspecial
01/26/2025Chimneys and ventsStephen Shishkospecial
12/05/2024FinalStephen Shishkoprogress
12/05/2024Mechanical SystemsStephen Shishkospecial
12/05/2024Tenant Protection Plan ComplianceStephen Shishkospecial
11/10/2024Fire-Resistant Penetrations and JointsPAUL REVANSspecial
11/10/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsPAUL REVANSspecial
11/10/2024HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
11/10/2024Tenant Protection Plan CompliancePAUL REVANSspecial
11/10/2024HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
11/10/2024Maintenance informationPAUL REVANSenergy_progress
11/10/2024HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01151417-I1Request digital key ↗
08/17/2026X01311304-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026X01151417-I1Open ↗
09/01/2026X01151417-I1Open ↗
09/01/2026X01151417-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X01151417-I1Open ↗
08/28/2026X01311304-I1Open ↗
08/23/2026X01140158-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026X01311304-I1Open ↗
08/13/2026X01151417-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01311304-I1Open ↗
08/13/2026X01151417-I1Open ↗