← Back
Two family brick
655 ST LAWRENCE AVENUE
BRONX · BIN 2021761
💬 Discuss this project
1955Year Built
3Stories
B1Building Class
R5Zoning
2,800 sfGross Floor Area
2Units
58 Open Violations 55 unresolved · 3 paperwork only ▸
Two family brick · 2,000 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof1p · 1 filing · 8 docs
Floor 21p · 1 filing · 3 docs
Floor 1
Cellar2p · 2 filings · 6 docs
1 job · most recent 04/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/02/2025——Gas, Water/Sanitary
2 jobs · most recent 05/27/2026
HVAC Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedA & S MASTER ELEC'L CORPHVAC Wiring
07/02/2024Permit IssuedBERGER QUALITY ELEC'L CON—
1 job · most recent 07/05/2024
FiledStatusContractorScope
07/05/2024Permit IssuedKAMTECH RESTORATION CORP12 panels, 4.98 kw, 987.99 roof_area_sqft
Building Lifecycle
All (89)Filed (3)Permit Issued (1)Violation (60)Objection (16)Special Inspection (9)
11/24/2025
Violation issued (HPD, closed)
I
07/16/2025
Objection resolved — Addressed
07/16/2025
Objection resolved — Addressed
07/03/2025
Violation issued (ECB, open)
Construction
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
04/04/2025
Objection raised — Plumbing
04/04/2025
Objection raised — Plumbing
04/04/2025
Objection raised — Admin
04/04/2025
Objection raised — Admin
04/04/2025
Objection raised — Plumbing
04/04/2025
Objection raised — Zoning
04/02/2025
Filed — Alteration
CAP AND REMOVE WATER AND WASTE LINES FOR 3 PC BATH (TOILET, SINK, SHOWER) AT CELLAR AND FIRST FLOOR. ALSO, CAP AND REMOVE GAS LINE FOR GAS STOVE ON FIRST FLOOR RESTORING FIRST FLOOR TO PRIOR LEGAL CONDITIONS FOR RECREATION/ACCESSORY USE.
X01131833-I1
04/02/2025
Objection raised — Scope
04/02/2025
Objection raised — Cost
03/28/2025
Filed — Alteration
RESTORE 1ST FL TO PRIOR LEGAL CONDITIONS TO GARAGE AND RECREATION/ACCESSORY USE. RESTORE 2ND FL ENCLOSED PORCH TO PRIOR LEGAL CONDITIONS TO OPEN PORCH. MINOR RENOVATIONS ON 2ND & 3RD FL. CAP & REMOVE 3PC BATH IN CEL & 1ST FL. CAP & REMOVE GAS LINE ON 1 FL
X01131144-I1
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
01/02/2025
Violation issued (HPD, open)
B
01/02/2025
Violation issued (HPD, closed)
C
01/02/2025
Violation issued (HPD, open)
B
01/02/2025
Violation issued (HPD, open)
B
01/02/2025
Violation issued (HPD, open)
B
12/03/2024
Violation issued (HPD, closed)
I
10/22/2024
Special inspection requirement — Final
09/17/2024
Violation issued (ECB, open)
Construction
09/17/2024
Violation issued (ECB, open)
Unknown
07/25/2024
Permit issued — Solar
X01076661-I1-SL
07/05/2024
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
X01076661-I1
07/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
07/05/2024
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
07/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
07/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
07/05/2024
Special inspection requirement — Final
Kaijin Liang
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, open)
B
06/05/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, closed)
A
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/25/2024
Violation issued (HPD, open)
B
05/24/2024
Violation issued (HPD, open)
B
05/24/2024
Violation issued (HPD, open)
B
Latest 60 of 89 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHRISTY H CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC204/02/2025
SQUARE ARCH, LLC107/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOTAKA MODERN HOME RENOVATIONS403/21/2026
KAMTECH RESTORATION CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAMTECH RESTORATION CORPGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802107/05/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedKAMTECH RESTORATION CORP07/25/2024
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/24/2025Fire-Resistant Penetrations and Joints—special
03/24/2025Energy Code Compliance Inspections—progress
03/24/2025Fire-Resistance Rated Construction—progress
10/22/2024Final—progress
07/05/2024Fire-Resistant Penetrations and JointsKaijin Liangspecial
07/05/2024Air barrier - visual inspectionKaijin Liangenergy_progress
07/05/2024Structural Stability – Alterations of existing buildingsKaijin Liangspecial
07/05/2024Energy Code Compliance InspectionsKaijin Liangprogress
07/05/2024FinalKaijin Liangprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026X01076661-I1Request digital key ↗
08/19/2026X01131144-I1Request digital key ↗
08/19/2026X01131833-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026X01076661-I1Open ↗
08/19/2026X01131833-I1Open ↗
08/13/2026X01131144-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026X01076661-I1Open ↗
08/29/2026X01076661-I1Open ↗
08/29/2026X01076661-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026X01076661-I1Open ↗
08/29/2026X01076661-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026X01076661-I1Open ↗
08/19/2026X01131833-I1Open ↗
08/13/2026X01131144-I1Open ↗