Two family converted from one family
2118 QUIMBY AVENUE
BRONX · BIN 2022880
💬 Discuss this project
1915Year Built
2Stories
B3Building Class
R3-2Zoning
2,579 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · Owner of record: 2118 QBY LLC · 5,150 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 9 docs
Floor 2Under Construction15p · 1 filing · 20 docs
Floor 1Under Construction14p · 2 filings · 20 docs
BasementUnder Construction15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLACKSTONE REAL GROUP2509/13/2026
OWNER OF 2118 QUIMBEY AVE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/05/2024$350K—Private party → 2118 QBY LLC$136/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC1005/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY CITY CONSTRUCTION*General Contractor404/09/2026
RONEY ELECTRIC INCElectrical103/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC73301005/05/2026
Building Lifecycle
All (87)Filed (10)Permit Issued (3)Signed Off (3)Violation (27)Inspection (11)Objection (6)Special Inspection (27)
07/07/2026
Signed off — Alteration CO
CONVERT ONE INTO TWO FAMILY DWELLING UNIT. APPLICATION IS BEING FILED TO SUPERSEDE BIS JOB # 200586874. OBTAIN NEW C OF O.
X01146080-I1
06/05/2026
Special inspection requirement — Permanent certificate
Jinfar Liu
06/05/2026
Special inspection requirement — Maintenance information
Jinfar Liu
06/05/2026
Special inspection requirement — Electric vehicle service equipment requirements
Jinfar Liu
06/05/2026
Special inspection requirement — Interior lighting power
Jinfar Liu
06/05/2026
Special inspection requirement — Metering
Jinfar Liu
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jinfar Liu
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
06/05/2026
Special inspection requirement — Concrete - Cast-In-Place
Jinfar Liu
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
06/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
05/05/2026
Filed — Alteration CO
CONVERT ONE INTO TWO FAMILY DWELLING UNIT. APPLICATION IS BEING FILED TO SUPERSEDE BIS JOB # 200586874. OBTAIN NEW C OF O.
X01146080-P3
01/20/2026
Signed off — Alteration
X01302376-I1
01/16/2026
Signed off — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ BASEMENT,1ST & 2ND FLOOR. NO CHANGE IN USE EGRESS & OCCUPANCY.
X01211803-I1
12/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/03/2025
Permit issued — Mechanical Systems
X01302376-I1-MS
11/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/23/2025
Filed — Alteration CO
CONVERT ONE INTO TWO FAMILY DWELLING UNIT. APPLICATION IS BEING FILED TO SUPERSEDE BIS JOB # 200586874. OBTAIN NEW C OF O.
X01146080-P1
10/20/2025
Filed — Alteration
X01302376-I1
10/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
10/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
10/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
10/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
10/17/2025
Special inspection requirement — Metering
Jinfar Liu
10/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
10/15/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ BASEMENT,1ST & 2ND FLOOR. NO CHANGE IN USE EGRESS & OCCUPANCY.
X01211803-P2
09/26/2025
Objection resolved — Addressed
09/22/2025
Objection raised — Admin
09/18/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ BASEMENT,1ST & 2ND FLOOR. NO CHANGE IN USE EGRESS & OCCUPANCY.
X01211803-P1
09/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
09/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
09/11/2025
Special inspection requirement — Metering
Jinfar Liu
09/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
09/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
07/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/24/2025
Permit issued — General Construction
X01146080-I1-GC
06/17/2025
Permit issued — Plumbing
X01211803-I1-PL
04/24/2025
Objection resolved — Addressed
04/24/2025
Objection resolved — Addressed
04/21/2025
Objection raised — Plumbing
04/21/2025
Objection raised — Plumbing
04/16/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ BASEMENT,1ST & 2ND FLOOR. NO CHANGE IN USE EGRESS & OCCUPANCY.
X01211803-I1
03/12/2025
Filed — Alteration
X01135767-P1
03/12/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
03/12/2025
Special inspection requirement — Metering
Jinfar Liu
03/12/2025
Special inspection requirement — Lighting controls
Jinfar Liu
03/12/2025
Special inspection requirement — Final
Jinfar Liu
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
11/29/2024
Filed — Alteration CO
CONVERT ONE INTO TWO FAMILY DWELLING UNIT. APPLICATION IS BEING FILED TO SUPERSEDE BIS JOB # 200586874. OBTAIN NEW C OF O.
X01146080-I1
11/04/2024
Filed — Alteration
X01135772-I1
11/04/2024
Filed — Alteration
X01135767-I1
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNY CITY CONSTRUCTION*12/03/2025
DOB NOWGeneral ConstructionPermit IssuedNY CITY CONSTRUCTION*06/24/2025
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING06/17/2025
BIS—ISSUEDFLORIMON CONTRACTING01/15/2002
BISPLISSUEDALL HOUR SEWER SERVICE CO.06/06/2001
BIS—ISSUEDSAMMYS CONSTRUCTION02/13/2001
2 projects · most recent 01/25/2026
General Wiring
FiledStatusContractorScope
01/25/2026CompleteRONEY ELECTRIC INCGeneral Wiring
12/11/2025CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/05/2026Permanent certificateJinfar Liuenergy_progress
06/05/2026Maintenance informationJinfar Liuenergy_progress
06/05/2026Electric vehicle service equipment requirementsJinfar Liuenergy_progress
06/05/2026Interior lighting powerJinfar Liuenergy_progress
06/05/2026MeteringJinfar Liuenergy_progress
06/05/2026Structural Stability – Alterations of existing buildingsJinfar Liuspecial
06/05/2026Fire-Resistant Penetrations and JointsJinfar Liuspecial
06/05/2026Concrete - Cast-In-PlaceJinfar Liuspecial
06/05/2026Energy Code Compliance InspectionsJinfar Liuprogress
06/05/2026Fire-Resistance Rated ConstructionJinfar Liuprogress
10/17/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
10/17/2025HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
10/17/2025HVAC-R and service water heating system controlsJinfar Liuenergy_progress
10/17/2025HVAC-R and service water heating equipmentJinfar Liuenergy_progress
10/17/2025MeteringJinfar Liuenergy_progress
10/17/2025Energy Code Compliance InspectionsJinfar Liuprogress
09/11/2025HVAC-R and service water heating equipmentJinfar Liuenergy_progress
09/11/2025Fire-Resistant Penetrations and JointsJinfar Liuspecial
09/11/2025Energy Code Compliance InspectionsJinfar Liuprogress
09/11/2025MeteringJinfar Liuenergy_progress
09/11/2025HVAC-R and service water heating system controlsJinfar Liuenergy_progress
09/11/2025HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
03/12/2025Interior lighting powerJinfar Liuenergy_progress
03/12/2025MeteringJinfar Liuenergy_progress
03/12/2025Lighting controlsJinfar Liuenergy_progress
Latest 25 of 27.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026X01135772-I1Request digital key ↗
08/20/2026X01135767-I1Request digital key ↗
08/20/2026X01135767-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
02/25/2026200586874Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01146080-P1Open ↗
08/13/2026X01146080-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026X01135767-I1Open ↗
09/01/2026X01135767-I1Open ↗
08/31/2026X01146080-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026X01135772-I1Open ↗
08/20/2026X01135767-I1Open ↗
08/19/2026X01211803-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X01135767-I1Open ↗
08/31/2026X01146080-I1Open ↗
08/30/2026X01211803-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/16/2026X01146080-P3Open ↗
08/13/2026X01146080-P1Open ↗
08/13/2026X01146080-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/20/2026X01135772-I1Open ↗
08/20/2026X01135767-I1Open ↗
08/19/2026X01211803-P2Open ↗
Showing 3 of 10 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/16/2026X01146080-I1Open ↗
08/16/2026X01146080-P1Open ↗
08/16/2026X01146080-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01146080-I1Open ↗