← Back
Two family frame
2116 BRUCKNER BOULEVARD
BRONX · BIN 2022925
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R3-2Zoning
2,180 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two family frame · Owner of record: UNAVAILABLE OWNER · 2,549 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (19)Filed (1)Violation (13)Objection (3)Special Inspection (2)
07/07/2022
Violation issued (ECB, open)
Construction
11/22/2021
Violation issued (ECB, closed)
Construction
11/05/2021
Objection raised — Accessibility
11/05/2021
Objection raised — Scope
11/05/2021
Objection raised — Scope
11/03/2021
Filed — Alteration
X00575821-I1
11/03/2021
Special inspection requirement — Air barrier - visual inspection
Misha Saradoff
09/29/2021
Violation issued (ECB, closed)
Construction
08/25/2021
Violation issued (ECB, closed)
Construction
08/17/2021
Special inspection requirement — Final
Misha Saradoff
06/11/2021
Violation issued (ECB, closed)
Construction
04/24/2021
Violation issued (ECB, closed)
Construction
03/04/2021
Violation issued (ECB, closed)
Construction
12/08/2020
Violation issued (ECB, closed)
Construction
09/30/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/25/2020
Violation issued (ECB, closed)
Construction
07/07/2020
Violation issued (ECB, closed)
Construction
07/07/2020
Violation issued (ECB, closed)
Zoning
06/24/2020
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANUEL CHINCHILIMA 1103/22/2026
EYECRAVE DESIGN103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EC EXPEDITING SERVICES111/03/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/03/2021Air barrier - visual inspectionMisha Saradoffenergy_progress
08/17/2021FinalMisha Saradoffprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026X00575821-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026X00575821-I1Open ↗
09/28/2026X00575821-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026X00575821-I1Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/17/2020220734775Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/17/2020220734775Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/17/2020220734775Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/23/2020220734775Open ↗