← Back
Two family converted from one family
2341 HERMANY AVENUE
BRONX · BIN 2023247
💬 Discuss this project
1945Year Built
2.5Stories
B3Building Class
R3-2Zoning
2,000 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: CLARENDON BRONX REALTY LLC · 10,300 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLARENDON BRONX REALTY LLC903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH BOTTA, PE, PC301/22/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METROPOLITAN HEAT & POWER COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH BOTTA, PE, PC1139301/22/2019
Building Lifecycle
All (21)Filed (3)Permit Issued (1)Violation (2)Special Inspection (15)
10/21/2021
Violation issued (HPD, open)
I
10/19/2021
Violation issued (HPD, open)
C
01/22/2019
Filed — Alteration
Installation of following equipment - Cellar: 1- Williamson GWA 140 hot water residential boiler rated input 140,000 btuh, 1- Williamson GWA 105 hot water residential boiler rated input of 105,000 btuh, 1st floor: 1- Residential Cooking Stove; 2nd Floor: 1- Residential Cooking Stove connected to 1 new gas services, 2 new meter and piping.
X00063985-P2
01/22/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
01/22/2019
Special inspection requirement — Final
JOSEPH BOTTA
01/22/2019
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH BOTTA
01/22/2019
Special inspection requirement — HVAC insulation and sealing
JOSEPH BOTTA
01/22/2019
Special inspection requirement — HVAC and service water heating equipment
JOSEPH BOTTA
01/22/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
01/22/2019
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH BOTTA
01/22/2019
Special inspection requirement — Final
JOSEPH BOTTA
01/22/2019
Special inspection requirement — HVAC and service water heating equipment
JOSEPH BOTTA
01/22/2019
Special inspection requirement — HVAC insulation and sealing
JOSEPH BOTTA
01/18/2019
Filed — Alteration
Installation of following equipment - Cellar: 1- Williamson GWA 140 hot water residential boiler rated input 140,000 btuh, 1- Williamson GWA 105 hot water residential boiler rated input of 105,000 btuh, 1st floor: 1- Residential Cooking Stove; 2nd Floor: 1- Residential Cooking Stove connected to 1 new gas services, 2 new meter and piping.
X00063985-P1
01/18/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
01/18/2019
Special inspection requirement — Final
JOSEPH BOTTA
01/18/2019
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH BOTTA
01/18/2019
Special inspection requirement — HVAC and service water heating equipment
JOSEPH BOTTA
01/18/2019
Special inspection requirement — HVAC insulation and sealing
JOSEPH BOTTA
08/28/2018
Permit issued — Plumbing
X00063985-I1-PL
07/31/2018
Filed — Alteration
Installation of following equipment - Cellar: 1- Williamson GWA 140 hot water residential boiler rated input 140,000 btuh, 1- Williamson GWA 105 hot water residential boiler rated input of 105,000 btuh, 1st floor: 1- Residential Cooking Stove; 2nd Floor: 1- Residential Cooking Stove connected to 1 new gas services, 2 new meter and piping.
X00063985-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMETROPOLITAN HEAT & POWER CO08/28/2018
1 job · most recent 04/13/2018
FiledStatusContractorScope
04/13/2018Permit IssuedCONDE ELECTRIC INC3 meters, 3 new_meters
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/22/2019Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
01/22/2019FinalJOSEPH BOTTAprogress
01/22/2019Energy Code Compliance InspectionsJOSEPH BOTTAprogress
01/22/2019HVAC insulation and sealing JOSEPH BOTTAenergy_progress
01/22/2019HVAC and service water heating equipment JOSEPH BOTTAenergy_progress
01/22/2019Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
01/22/2019Energy Code Compliance InspectionsJOSEPH BOTTAprogress
01/22/2019FinalJOSEPH BOTTAprogress
01/22/2019HVAC and service water heating equipment JOSEPH BOTTAenergy_progress
01/22/2019HVAC insulation and sealing JOSEPH BOTTAenergy_progress
01/18/2019Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
01/18/2019FinalJOSEPH BOTTAprogress
01/18/2019Energy Code Compliance InspectionsJOSEPH BOTTAprogress
01/18/2019HVAC and service water heating equipment JOSEPH BOTTAenergy_progress
01/18/2019HVAC insulation and sealing JOSEPH BOTTAenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026X00063985-I1Request digital key ↗
08/26/2026X00063985-P2Request digital key ↗
08/15/2026X00063985-P1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/26/2026X00063985-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature12
08/25/2026X00063985-I1Open ↗
08/25/2026X00063985-I1Open ↗
08/25/2026X00063985-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026X00063985-P1Open ↗
08/26/2026X00063985-I1Open ↗
08/26/2026X00063985-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026X00063985-I1Open ↗
08/23/2026X00063985-P2Open ↗
08/22/2026X00063985-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026X00063985-P1Open ↗
08/26/2026X00063985-I1Open ↗
08/26/2026X00063985-P2Open ↗