← Back
Two family frame
1790 GLEASON AVENUE
BRONX · BIN 2024270
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
R5Zoning
3,222 sfGross Floor Area
2Units
Two family frame · 2,663 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 23p · 1 filing · 10 docs
Floor 13p · 1 filing · 10 docs
Cellar4p · 1 filing · 10 docs
Sub-Basement3p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT203/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DFE ENGINEERING P.C.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
WCK ELECTRIC CORP.Electrical103/22/2026
DFE CONTRACTOR LLCGeneral Contractor104/09/2026
JUST PLBG & HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975103/21/2025
ARCHITECTURAL CONCEPT3642103/21/2025
Building Lifecycle
All (26)Filed (2)Permit Issued (2)Inspection (10)Special Inspection (12)
10/09/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/23/2025
Permit issued — General Construction
X01172106-I1-GC
05/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/11/2025
Permit issued — Plumbing
X01172106-S1-PL
03/21/2025
Filed — Alteration
Remove boiler room&propose enclosed for electrical hwh, dryer &washer machine, propose 1 3 piece bathroom under separate application at bsmt level. Interior renovation, remove non-bearing partition at 1st &2nd floor. No changes of use egress or occupancy
X01172106-I1
03/21/2025
Filed — Alteration
Remove boiler room&propose enclosed for electrical hwh, dryer &washer machine, propose 1 3 piece bathroom under separate application at bsmt level. Interior renovation, remove non-bearing partition at 1st &2nd floor. No changes of use egress or occupancy
X01172106-S1
03/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Exterior lighting power
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
02/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — Lighting controls
MUZAFFAR JAMAL
02/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
01/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDFE CONTRACTOR LLC09/23/2025
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK04/11/2025
1 project · most recent 03/21/2025
Water/Sanitary
FiledStatusContractorScope
03/21/2025Permit IssuedJUST PLBG & HTG INCWater/Sanitary
2 projects · most recent 02/06/2026
General Wiring
FiledStatusContractorScope
02/06/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
03/13/2024Permit IssuedALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/16/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
03/19/2025Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
02/08/2025HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
02/08/2025Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
02/08/2025Fenestration areasMUZAFFAR JAMALenergy_progress
02/08/2025Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
02/08/2025Exterior lighting powerMUZAFFAR JAMALenergy_progress
02/08/2025Fire-Resistant Penetrations and JointsAlbert Munozspecial
02/08/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
02/08/2025Interior lighting powerMUZAFFAR JAMALenergy_progress
02/08/2025Fenestration air leakageMUZAFFAR JAMALenergy_progress
02/08/2025Lighting controlsMUZAFFAR JAMALenergy_progress
02/08/2025HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026X01172106-I1Request digital key ↗
08/19/2026X01172106-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026X01172106-S1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026X01172106-I1Open ↗
08/19/2026X01172106-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X01172106-I1Open ↗
08/23/2026X01172106-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026X01172106-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026X01172106-I1Open ↗
08/19/2026X01172106-S1Open ↗