← Back
Single or multiple dwelling with stores or offices
1103 CASTLE HILL AVENUE
BRONX · BIN 2026434
💬 Discuss this project
1905Year Built
3Stories
S9Building Class
R5Zoning
3,588 sfGross Floor Area
5Units
Rent Stabilized26 Open Violations ▸
Single or multiple dwelling with stores or offices · 2,163 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 34p · 1 filing · 16 docs
Floor 24p · 1 filing · 16 docs
Floor 15p · 1 filing · 16 docs
Cellar1p · 1 filing · 16 docs
4 jobs · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedWCK ELECTRIC CORP.6 meters
05/05/2026CompleteWCK ELECTRIC CORP.—
05/14/2024CompleteWCK ELECTRIC CORP.General Wiring
10/20/2023Permit IssuedRICHARD NEU—
Building Lifecycle
All (85)Filed (6)Permit Issued (8)Signed Off (4)Violation (55)Inspection (5)Special Inspection (7)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2025
Signed off — Alteration
1. REPLACE EXISTING KITCHEN SINK (03) IN THE 1ST,2ND, & 3RD FLOOR.2. REPLACE EXISTING WATER CLOSET (03),WASH BASIN (03) & BATHTUB (03) IN THE BATHROOM IN THE 1ST ,2ND & 3R FLOOR.3. REPLACE EXISTING GAS STOVE (03) IN THE 1ST,2ND & 3RD FLOOR.
X00999875-S1
08/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2025
Permit issued — Plumbing
X00999875-S1-PL
08/04/2025
Filed — Alteration
1. REPLACE EXISTING KITCHEN SINK (03) IN THE 1ST,2ND, & 3RD FLOOR.2. REPLACE EXISTING WATER CLOSET (03),WASH BASIN (03) & BATHTUB (03) IN THE BATHROOM IN THE 1ST ,2ND & 3R FLOOR.3. REPLACE EXISTING GAS STOVE (03) IN THE 1ST,2ND & 3RD FLOOR.
X00999875-P2
06/12/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2025
Violation issued (HPD, closed)
A
02/18/2025
Signed off — Alteration
1. REMOVE EXISTING SIDING AND FIRE DAMAGE EXTERIOR SHEATHING AT SOUTH ELEVATION.2. INSTALL NEW STUCCO IN THE SOUTH SIDE EXTERIOR FACADE AT SOUTH ELEVATION.
X00999856-I1
01/17/2025
Signed off — Alteration
1. REPLACE EXISTING KITCHEN SINK (03) IN THE 1ST,2ND, & 3RD FLOOR.2. REPLACE EXISTING WATER CLOSET (03),WASH BASIN (03) & BATHTUB (03) IN THE BATHROOM IN THE 1ST ,2ND & 3R FLOOR.3. REPLACE EXISTING GAS STOVE (03) IN THE 1ST,2ND & 3RD FLOOR.
X00999875-I1
01/09/2025
Filed — Alteration
1. REPLACE EXISTING KITCHEN SINK (03) IN THE 1ST,2ND, & 3RD FLOOR.2. REPLACE EXISTING WATER CLOSET (03),WASH BASIN (03) & BATHTUB (03) IN THE BATHROOM IN THE 1ST ,2ND & 3R FLOOR.3. REPLACE EXISTING GAS STOVE (03) IN THE 1ST,2ND & 3RD FLOOR.
X00999875-P1
01/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2025
Special inspection requirement — Final
Eric Foster
01/06/2025
Special inspection requirement — Fenestration areas
Eric Foster
01/06/2025
Special inspection requirement — Lighting in dwelling units
Eric Foster
01/06/2025
Special inspection requirement — Fenestration air leakage
Eric Foster
12/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/05/2024
Permit issued — Plumbing
X00999875-S1-PL
11/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/29/2024
Permit issued — General Construction
X00999875-I1-GC
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/09/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00950619-I1
07/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2024
Permit issued — Plumbing
X00999875-S1-PL
04/02/2024
Violation issued (HPD, closed)
A
03/18/2024
Permit issued — General Construction
X00999875-I1-GC
02/29/2024
Permit issued — General Construction
X00999856-I1-GC
02/26/2024
Permit issued — General Construction
X00999875-I1-GC
02/24/2024
Filed — Alteration
1. REMOVE EXISTING SIDING AND FIRE DAMAGE EXTERIOR SHEATHING AT SOUTH ELEVATION.2. INSTALL NEW STUCCO IN THE SOUTH SIDE EXTERIOR FACADE AT SOUTH ELEVATION.
X00999856-I1
02/22/2024
Filed — Alteration
1. REPLACE EXISTING KITCHEN SINK (03) IN THE 1ST,2ND, & 3RD FLOOR.2. REPLACE EXISTING WATER CLOSET (03),WASH BASIN (03) & BATHTUB (03) IN THE BATHROOM IN THE 1ST ,2ND & 3R FLOOR.3. REPLACE EXISTING GAS STOVE (03) IN THE 1ST,2ND & 3RD FLOOR.
X00999875-S1
02/22/2024
Filed — Alteration
1. REPLACE EXISTING KITCHEN SINK (03) IN THE 1ST,2ND, & 3RD FLOOR.2. REPLACE EXISTING WATER CLOSET (03),WASH BASIN (03) & BATHTUB (03) IN THE BATHROOM IN THE 1ST ,2ND & 3R FLOOR.3. REPLACE EXISTING GAS STOVE (03) IN THE 1ST,2ND & 3RD FLOOR.
X00999875-I1
02/02/2024
Special inspection requirement — Masonry
Luis Pichardo
02/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
02/02/2024
Special inspection requirement — Final
RONALD VILLANO
10/25/2023
Violation issued (ECB, closed)
Construction
10/20/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00950619-I1
10/20/2023
Permit issued — Sidewalk Shed
X00950619-I1-SH
10/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2023
Violation issued (HPD, open)
I
08/03/2023
Violation issued (HPD, open)
I
08/03/2023
Violation issued (HPD, open)
I
08/03/2023
Violation issued (HPD, open)
I
07/26/2023
Violation issued (HPD, open)
C
07/26/2023
Violation issued (HPD, open)
B
07/26/2023
Violation issued (HPD, open)
B
07/26/2023
Violation issued (HPD, closed)
C
07/26/2023
Violation issued (HPD, open)
C
07/26/2023
Violation issued (HPD, open)
C
07/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
I
02/17/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
10/25/2019
Violation issued (HPD, closed)
I
10/10/2018
Violation issued (HPD, closed)
I
Latest 60 of 85 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY507/08/2026
KEYSTONE CONTRACTING1607/08/2026
JOSE A. SANTOS P.E.P.C203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP408/04/2025
RONALD VILLANO ARCHITECT PC102/24/2024
ENTHINK ENGINEERS LLC110/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AK GENERAL CONTRACTOR CORGeneral Contractor407/08/2026
W.R. PLBG AND HTG CORPPlumbing307/08/2026
SIGNORE & SONS PLBG CORPPlumbing307/08/2026
KEYSTONE CONTRACTING CORPGeneral Contractor207/08/2026
GREGORY, OWENElectrical103/21/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
LEE, ASTLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369102/24/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP08/12/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP12/05/2024
DOB NOWGeneral ConstructionSigned-offAK GENERAL CONTRACTOR COR10/29/2024
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP05/13/2024
DOB NOWGeneral ConstructionSigned-offAK GENERAL CONTRACTOR COR03/18/2024
DOB NOWGeneral ConstructionSigned-offKEYSTONE CONTRACTING CORP02/29/2024
DOB NOWGeneral ConstructionSigned-offKEYSTONE CONTRACTING CORP02/26/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC10/20/2023
BISOTISSUEDCENTURION SOLAR ENERGY10/05/2023
BIS—ISSUEDCALWIN BUILDERS & RENOVATORS COR08/24/1990
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/06/2025FinalEric Fosterprogress
01/06/2025Fenestration areasEric Fosterenergy_progress
01/06/2025Lighting in dwelling unitsEric Fosterenergy_progress
01/06/2025Fenestration air leakageEric Fosterenergy_progress
02/02/2024MasonryLuis Pichardospecial
02/02/2024Structural Stability – Alterations of existing buildingsLuis Pichardospecial
02/02/2024FinalRONALD VILLANOprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026X00950619-I1Request digital key ↗
08/21/2026X00999875-I1Request digital key ↗
08/21/2026X00999875-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/04/2023240355799Open ↗
▸BISWORK PERMIT APPLICATION1
10/05/2023240355799Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026X00950619-I1Open ↗
08/13/2026X00999875-P2Open ↗
08/13/2026X00999875-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026X00999875-P1Open ↗
08/28/2026X00999875-P1Open ↗
08/28/2026X00999875-P1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/04/2023240355799Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026X00999856-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
10/05/2023240355799Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026X00999875-P2Open ↗
08/13/2026X00999875-P1Open ↗
08/13/2026X00999875-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/04/2023240355799Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/04/2023240355799Open ↗
10/04/2023240355799Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/04/2023240355799Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/04/2023240355799Open ↗
10/04/2023240355799Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/04/2023240355799Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/04/2023240355799Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/04/2023240355799Open ↗
▸DOB NOWWaiver Document1
08/13/2026X00999856-I1Open ↗