← Back
Two family brick
1529 LELAND AVENUE
BRONX · BIN 2028654
💬 Discuss this project
1915Year Built
2Stories
B1Building Class
R6Zoning
2,624 sfGross Floor Area
2Units
6 Open Violations ▸
Two family brick · 3,742 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Electrical
Roof5p · 2 filings · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR107/27/2026
PARKER AND WEST ENGINEERING, PLLC105/12/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281107/27/2026
PARKER AND WEST ENGINEERI5272105/12/2026
Building Lifecycle
All (16)Filed (2)Permit Issued (2)Violation (6)Inspection (1)Special Inspection (5)
08/11/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/04/2026
Permit issued — Solar
X01436181-I1-SL
07/27/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 30 modules, 12.3 KW
X01436181-I1
05/15/2026
Permit issued — Solar
X01398263-I1-SL
05/12/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01398263-I1
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/12/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/06/2026
Special inspection requirement — Final
Walid Abdulla
04/05/2012
Violation issued (HPD, open)
B
04/05/2012
Violation issued (HPD, open)
B
04/05/2012
Violation issued (HPD, open)
B
04/05/2012
Violation issued (HPD, open)
B
04/05/2012
Violation issued (HPD, open)
B
04/05/2012
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR08/04/2026
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC05/15/2026
3 projects · most recent 07/27/2026
FiledStatusContractorScope
07/27/2026Permit IssuedISLAND ELECTRIC CORP—
05/12/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
05/08/2026Permit IssuedISLAND ELECTRIC CORP3 meters
2 projects · most recent 07/27/2026
FiledStatusContractorScope
07/27/2026Permit IssuedMOMENTUM SOLAR60 panels, 24.6 kw, 3,742 roof_area_sqft
05/12/2026Permit IssuedSUNRUN INSTALLATION SVC24 panels, 10.8 kw, 252 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/11/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/12/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/12/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/06/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/06/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/06/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01436181-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026X01398263-I1Open ↗
08/22/2026X01398263-I1Open ↗
08/22/2026X01398263-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026X01398263-I1Open ↗
08/22/2026X01398263-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01436181-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026X01436181-I1Open ↗