← Back
Church, synagogue, chapel
St Helena School
1315 BENEDICT AVENUE · BIN 2028943
💬 Discuss this project
1941Year Built
3Stories
M1Building Class
R6Zoning
16,605 sfGross Floor Area
1Units
4 Open Violations 0 unresolved · 4 paperwork only ▸
Church, synagogue, chapel · 34,125 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (25)Filed (2)Permit Issued (2)Violation (6)Inspection (1)Special Inspection (14)
01/16/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/17/2025
Permit issued — Boiler Equipment
X01043496-I1-BE
05/05/2025
Filed — Alteration
REPLACE BOILER AND BURNER WITH BOILER AND BURNER. CHANGE FUEL FROM #4 OIL TO #2 OIL. EXISTING 2ND BOILER TO REMAIN WITH A CHANGE IN GRADE OF FUEL FROM #4 OIL TO #2 OIL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01043496-P1
05/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
05/05/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Gregory Perotto
05/05/2025
Special inspection requirement — Heating Systems
Gregory Perotto
05/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
05/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
05/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
05/05/2025
Special inspection requirement — Maintenance information
Gregory Perotto
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
03/26/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Gregory Perotto
03/26/2025
Special inspection requirement — Heating Systems
Gregory Perotto
03/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
03/26/2025
Special inspection requirement — Maintenance information
Gregory Perotto
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
07/15/2024
Permit issued — Boiler Equipment
X01043496-I1-BE
05/15/2024
Filed — Alteration
REPLACE BOILER AND BURNER WITH BOILER AND BURNER. CHANGE FUEL FROM #4 OIL TO #2 OIL. EXISTING 2ND BOILER TO REMAIN WITH A CHANGE IN GRADE OF FUEL FROM #4 OIL TO #2 OIL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01043496-I1
05/16/2022
Violation issued (ECB, open)
Boilers
05/16/2022
Violation issued (ECB, open)
Boilers
05/16/2022
Violation issued (ECB, open)
Boilers
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.205/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947205/05/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPETRO INC06/17/2025
DOB NOWBoiler EquipmentSigned-offPETRO INC07/15/2024
BISFPISSUEDLUND FIRE PRODUCTS CO INC11/12/2009
BISOTISSUEDMERCURY SOLAR SYSTEMS LLC04/24/2009
BISFSISSUEDMANHATTAN BOILER EQUIPMENT10/04/1996
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/16/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/05/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
05/05/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Perottospecial
05/05/2025Heating SystemsGregory Perottospecial
05/05/2025HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
05/05/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
05/05/2025HVAC-R and service water heating system controlsGregory Perottoenergy_progress
05/05/2025Maintenance informationGregory Perottoenergy_progress
03/26/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
03/26/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Perottospecial
03/26/2025Heating SystemsGregory Perottospecial
03/26/2025HVAC-R and service water heating system controlsGregory Perottoenergy_progress
03/26/2025Maintenance informationGregory Perottoenergy_progress
03/26/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
03/26/2025HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026X01043496-I1Request digital key ↗
08/19/2026X01043496-P1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
11/12/2009220032514Open ↗
04/24/2009220002182Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/20/2009220032514Open ↗
04/15/2009220002182Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026X01043496-I1Open ↗
09/23/2026X01043496-I1Open ↗
09/23/2026X01043496-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X01043496-I1Open ↗
09/23/2026X01043496-I1Open ↗
09/23/2026X01043496-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/01/2010220002182Open ↗
10/20/2009220032514Open ↗
10/20/2009220032514Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026X01043496-I1Open ↗
08/19/2026X01043496-P1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/20/2009220032514Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/20/2009220032514Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/15/2009220002182Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/19/2026X01043496-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/01/2010220002182Open ↗
03/15/2010220002182Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/20/2009220032514Open ↗
04/15/2009220002182Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X01043496-I1Open ↗
08/13/2026X01043496-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/02/2010220002182Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
04/01/2010220002182Open ↗
10/20/2009220032514Open ↗
04/15/2009220002182Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/15/2009220002182Open ↗