← Back
Over six families without stores
1528 WHITE PLAINS ROAD
BRONX · BIN 2029098
💬 Discuss this project
1929Year Built
4Stories
C1Building Class
R6Zoning
11,200 sfGross Floor Area
12Units
Rent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: ARLE REALTY CORP. · 4,230 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2206 REALTY1407/08/2026
ARLE REALTY CORP.403/22/2026
1528 WHITE PLAINS RD REAL203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.406/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARISTON CHIMNEY LLCGeneral Contractor107/08/2026
BAUER MECHANCIAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851406/22/2022
Building Lifecycle
All (81)Filed (4)Permit Issued (4)Signed Off (2)Violation (60)Inspection (2)Special Inspection (9)
04/30/2026
Violation issued (HPD, closed)
A
10/04/2025
Violation issued (HPD, closed)
B
10/04/2025
Violation issued (HPD, closed)
A
10/04/2025
Violation issued (HPD, open)
B
10/04/2025
Violation issued (HPD, closed)
A
10/04/2025
Violation issued (HPD, closed)
C
10/04/2025
Violation issued (HPD, open)
B
06/05/2025
Violation issued (HPD, closed)
A
02/15/2024
Violation issued (HPD, closed)
B
02/15/2024
Violation issued (HPD, closed)
B
02/15/2024
Violation issued (HPD, closed)
B
05/05/2023
Violation issued (HPD, closed)
C
05/05/2023
Violation issued (HPD, open)
B
05/05/2023
Violation issued (HPD, closed)
A
05/05/2023
Violation issued (HPD, closed)
A
05/05/2023
Violation issued (HPD, closed)
A
05/05/2023
Violation issued (HPD, closed)
C
12/16/2022
Signed off — Alteration
REPLACE BOILER AND BURNER.
X00572057-I1
10/19/2022
Violation issued (HPD, closed)
B
10/19/2022
Violation issued (HPD, closed)
B
10/19/2022
Violation issued (HPD, closed)
B
06/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/22/2022
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
X00572009-P1
06/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
06/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/28/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/26/2022
Permit issued — Boiler Equipment
X00572057-I1-BE
10/12/2021
Signed off — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY.
X00572110-I1
09/15/2021
Permit issued — Plumbing
X00572009-I1-PL
09/11/2021
Violation issued (HPD, closed)
B
09/11/2021
Violation issued (HPD, closed)
B
09/11/2021
Violation issued (HPD, closed)
A
09/11/2021
Violation issued (HPD, closed)
A
09/11/2021
Violation issued (HPD, closed)
B
09/11/2021
Violation issued (HPD, closed)
B
09/11/2021
Violation issued (HPD, closed)
A
09/10/2021
Permit issued — Mechanical Systems
X00572110-I1-MS
09/10/2021
Permit issued — Boiler Equipment
X00572057-I1-BE
08/25/2021
Filed — Alteration
REPLACE BOILER AND BURNER.
X00572057-I1
08/25/2021
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY.
X00572110-I1
08/25/2021
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
X00572009-I1
08/24/2021
Special inspection requirement — Chimneys and vents
LOUIS ARENA
08/17/2021
Violation issued (HPD, closed)
A
08/06/2021
Special inspection requirement — Heating Systems
LOUIS ARENA
08/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/06/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
08/06/2021
Special inspection requirement — Final
LOUIS ARENA
08/06/2021
Special inspection requirement — Mechanical Systems
LOUIS ARENA
07/05/2021
Violation issued (HPD, closed)
B
07/05/2021
Violation issued (HPD, closed)
A
07/05/2021
Violation issued (HPD, closed)
C
07/05/2021
Violation issued (HPD, closed)
B
07/05/2021
Violation issued (HPD, closed)
A
07/05/2021
Violation issued (HPD, closed)
B
06/24/2021
Violation issued (HPD, closed)
B
06/24/2021
Violation issued (HPD, closed)
B
01/06/2021
Violation issued (ECB, open)
Construction
10/21/2020
Violation issued (HPD, closed)
A
10/21/2020
Violation issued (HPD, closed)
B
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offG. BAUER, INC04/26/2022
DOB NOWPlumbingSigned-offMIDWOOD-RAFTERY PLBG &HTG09/15/2021
DOB NOWMechanical SystemsSigned-offARISTON CHIMNEY LLC09/10/2021
DOB NOWBoiler EquipmentSigned-offG. BAUER, INC09/10/2021
BISBLISSUEDMETROPOLITAN HT&POWER CO05/22/2000
BISBLISSUEDDUAL FUEL GAS SERVICE CORP11/12/1991
BISFBISSUEDNATIONAL ENERGY SYSTEMS INC.02/02/1990
1 project · most recent 06/22/2022
Gas
FiledStatusContractorScope
06/22/2022Signed-offBAUER MECHANCIAL LLCGas
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/24/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/16/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
08/24/2021Chimneys and ventsLOUIS ARENAspecial
08/06/2021Heating SystemsLOUIS ARENAspecial
08/06/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/06/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/06/2021Maintenance informationLOUIS ARENAenergy_progress
08/06/2021FinalLOUIS ARENAprogress
08/06/2021Mechanical SystemsLOUIS ARENAspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026X00572110-I1Request digital key ↗
08/25/2026X00572057-I1Request digital key ↗
08/25/2026X00572009-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X00572057-I1Open ↗
09/01/2026X00572009-P1Open ↗
08/28/2026X00572009-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026X00572057-I1Open ↗
09/23/2026X00572057-I1Open ↗
09/23/2026X00572057-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026X00572057-I1Open ↗
08/25/2026X00572009-I1Open ↗
08/25/2026X00572009-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00572057-I1Open ↗
08/25/2026X00572009-P1Open ↗
08/25/2026X00572009-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00572057-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00572057-I1Open ↗