← Back
Over six families without stores
1180 LEBANON STREET
BRONX · BIN 2042479
💬 Discuss this project
1928Year Built
5Stories
C1Building Class
M1-1Zoning
36,852 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized38 Open Violations 34 unresolved · 4 paperwork only ▸
Over six families without stores · Owner of record: 1180 SF HOLDINGS LLC · 12,202 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITIAPTS1107/08/2026
RELIABLE ENTERPRISES1007/08/2026
STEIN MANAGEMENT403/22/2026
1180 SF HOLDINGS LLC103/22/2026
1180 REALTY2803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLN ENGINEERING PLLC105/22/2024
ARQUITECTURA VARELA101/31/2023
ENTHINK ENGINEERS LLC101/18/2023
NEW YORK ENGINEERING ASSOC., P.C.503/22/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor807/08/2026
BAUER MECHANCIAL LLCPlumbing507/08/2026
FACADE RES GROUP LLCGeneral Contractor303/21/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519101/31/2023
BUTTERFIELD & O'CONNOR4189101/31/2023
NEW YORK ENGINEERING ASSO851503/22/2021
Building Lifecycle
All (107)Filed (8)Permit Issued (11)Signed Off (5)Violation (60)Objection (2)Special Inspection (21)
08/14/2026
Violation issued (HPD, open)
A
07/25/2026
Violation issued (HPD, open)
C
07/25/2026
Violation issued (HPD, open)
B
07/25/2026
Violation issued (HPD, open)
B
07/25/2026
Violation issued (HPD, open)
B
07/25/2026
Violation issued (HPD, open)
B
07/25/2026
Violation issued (HPD, open)
A
07/25/2026
Violation issued (HPD, open)
B
07/14/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
C
01/11/2026
Violation issued (HPD, closed)
B
01/11/2026
Violation issued (HPD, closed)
C
01/11/2026
Violation issued (HPD, closed)
C
01/08/2026
Violation issued (HPD, open)
C
01/08/2026
Violation issued (HPD, closed)
C
01/05/2026
Violation issued (HPD, closed)
C
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, closed)
C
12/19/2025
Violation issued (HPD, closed)
C
10/03/2025
Permit issued — Sidewalk Shed
X00814506-I1-SH
09/25/2025
Violation issued (HPD, closed)
B
09/22/2025
Violation issued (HPD, open)
C
09/22/2025
Violation issued (HPD, open)
C
09/13/2025
Violation issued (HPD, closed)
C
09/13/2025
Violation issued (HPD, closed)
C
09/13/2025
Violation issued (HPD, open)
C
09/13/2025
Violation issued (HPD, closed)
C
09/13/2025
Violation issued (HPD, closed)
B
09/13/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, open)
C
06/15/2025
Violation issued (HPD, closed)
B
06/15/2025
Violation issued (HPD, closed)
B
06/15/2025
Violation issued (HPD, closed)
B
06/15/2025
Violation issued (HPD, closed)
B
04/18/2025
Violation issued (HPD, closed)
B
03/07/2025
Violation issued (HPD, closed)
B
03/07/2025
Violation issued (HPD, closed)
C
03/07/2025
Violation issued (HPD, closed)
B
03/07/2025
Violation issued (HPD, closed)
C
03/07/2025
Violation issued (HPD, closed)
C
03/07/2025
Violation issued (HPD, closed)
C
03/05/2025
Violation issued (HPD, closed)
C
03/03/2025
Violation issued (HPD, closed)
C
03/03/2025
Violation issued (HPD, closed)
B
02/21/2025
Violation issued (HPD, closed)
B
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC10/03/2025
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC10/30/2024
DOB NOWGeneral ConstructionSigned-offFACADE RES GROUP LLC07/11/2024
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC11/28/2023
DOB NOWGeneral ConstructionSigned-offAMERICAN METAL INC02/08/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC01/18/2023
DOB NOWPlumbingSigned-offMIDWOOD-RAFTERY PLBG &HTG04/15/2021
DOB NOWBoiler EquipmentSigned-offMIDWOOD-RAFTERY PLBG &HTG03/23/2021
DOB NOWBoiler EquipmentSigned-offMIDWOOD-RAFTERY PLBG &HTG03/22/2021
DOB NOWBoiler EquipmentSigned-offMIDWOOD-RAFTERY PLBG &HTG03/16/2020
DOB NOWPlumbingSigned-offMIDWOOD-RAFTERY PLBG &HTG02/24/2020
BISOTISSUEDWINDSOR ENERGY LLC09/06/2019
BISFSISSUEDG. BAUER INC03/04/2013
BISPLISSUEDALAN E. ROSENBERG, INC.03/04/2013
BISFBISSUEDMARLANDE HEATING CORP11/14/1997
1 project · most recent 01/20/2023
FiledStatusContractorScope
01/20/2023CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/23/2024FinalJAMES NAPOLIprogress
01/26/2023Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
01/26/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/26/2023FinalVicente Varelaprogress
01/26/2023MasonryBRIAN T. O'CONNORspecial
03/25/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/25/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
03/25/2021Heating SystemsLOUIS ARENAspecial
03/25/2021Maintenance informationLOUIS ARENAenergy_progress
03/25/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/25/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
03/12/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
03/12/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
03/12/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
03/11/2021HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/11/2021Heating SystemsLOUIS ARENAspecial
03/11/2021HVAC and service water heating equipment LOUIS ARENAenergy_progress
03/11/2021Maintenance informationLOUIS ARENAenergy_progress
03/10/2021Heating SystemsLOUIS ARENAspecial
03/10/2021Maintenance informationLOUIS ARENAenergy_progress
03/10/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch3
08/26/2026X00292138-S2Request digital key ↗
08/23/2026X00814506-I1Request digital key ↗
08/21/2026X01026489-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/26/2026X00292138-S1Request digital key ↗
08/15/2026X00292138-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026X00292138-I1Request digital key ↗
08/15/2026X00292138-P2Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION5
09/05/2019240261596Open ↗
03/04/2013220254864Open ↗
03/04/2013220254864Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
09/05/2019240261596Open ↗
03/04/2013220254864Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026X00292138-S1Open ↗
09/23/2026X00292138-S1Open ↗
09/23/2026X00292138-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026X00292138-S1Open ↗
09/15/2026X00292138-S2Open ↗
09/01/2026X00292138-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026X00292138-S1Open ↗
08/26/2026X00292138-I1Open ↗
08/13/2026X00292138-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/10/2014220254864Open ↗
03/04/2013220254864Open ↗
03/04/2013220254864Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/05/2019240261596Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/04/2013220254864Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/05/2019240261596Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/04/2013220254864Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/05/2019240261596Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE2
02/05/2014220254864Open ↗
07/03/2013220254864Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
07/03/2013220254864Open ↗
▸BISSCHEDULE B - PLUMBING1
03/04/2013220254864Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/04/2013220254864Open ↗
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan4
08/26/2026X00292138-S1Open ↗
08/26/2026X00292138-I1Open ↗
08/13/2026X00292138-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
09/05/2019240261596Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026X00292138-S1Open ↗
08/26/2026X00292138-I1Open ↗
08/13/2026X00292138-P2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/05/2019240261596Open ↗
03/04/2013220254864Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/10/2014220254864Open ↗
03/04/2013220254864Open ↗
03/04/2013220254864Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00292138-S1Open ↗
08/13/2026X00292138-S2Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/10/2014220254864Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/05/2019240261596Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/05/2019240261596Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00292138-S2Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/05/2019240261596Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/10/2014220254864Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/10/2014220254864Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/04/2013220254864Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/05/2019240261596Open ↗
01/10/2014220254864Open ↗
03/04/2013220254864Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/04/2013220254864Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/05/2019240261596Open ↗
▸Other Documents5
▸DOB NOWDHCR Document5
08/26/2026X00292138-S1Open ↗
08/26/2026X00292138-I1Open ↗
08/13/2026X00292138-P1Open ↗
Showing 3 of 5 on file for this type