← Back
Five to six families
1586 PAULDING AVENUE
BRONX · BIN 2043943
💬 Discuss this project
1943Year Built
2Stories
C2Building Class
R4AZoning
3,192 sfGross Floor Area
5Units
13 Open Violations ▸
Five to six families · 2,870 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 12 docs
Nothing on file for this building.
Building Lifecycle
All (28)Filed (2)Permit Issued (1)Signed Off (1)Violation (14)Inspection (4)Special Inspection (6)
11/19/2024
Signed off — Alteration
APPLICATION FILED TO INSTALL NEW PLP METER TO SUPPLY AND REGISTER (1) EXISTING BOILER AND (1) EXISTING HOT WATER HEATER AT CELLAR FLOOR OF MULTI FAMILY BUILDING. ALSO TO RELOCATE (4) EXISTING GAS METERS AT CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY
X01087221-I1
11/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
Yahaira Volquez Colombo
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
10/30/2024
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLP METER TO SUPPLY AND REGISTER (1) EXISTING BOILER AND (1) EXISTING HOT WATER HEATER AT CELLAR FLOOR OF MULTI FAMILY BUILDING. ALSO TO RELOCATE (4) EXISTING GAS METERS AT CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY
X01087221-P1
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
10/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Yahaira Volquez Colombo
10/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
09/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/07/2024
Permit issued — Plumbing
X01087221-I1-PL
08/01/2024
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLP METER TO SUPPLY AND REGISTER (1) EXISTING BOILER AND (1) EXISTING HOT WATER HEATER AT CELLAR FLOOR OF MULTI FAMILY BUILDING. ALSO TO RELOCATE (4) EXISTING GAS METERS AT CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY
X01087221-I1
09/01/2013
Violation issued (HPD, closed)
C
09/01/2013
Violation issued (HPD, open)
A
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
A
09/01/2013
Violation issued (HPD, open)
A
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
A
09/01/2013
Violation issued (HPD, open)
B
09/01/2013
Violation issued (HPD, open)
A
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC210/30/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S. TIEGER PLBG. CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLOMBO ARCHITECTURAL STU4930210/30/2024
JOSE A SANTOS PE, PC3292210/30/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS. TIEGER PLBG. CO., INC08/07/2024
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/31/2024Tenant Protection Plan ComplianceYahaira Volquez Colombospecial
10/31/2024Fire-Resistant Penetrations and JointsJose Santosspecial
10/31/2024Energy Code Compliance InspectionsJose Santosprogress
10/09/2024Fire-Resistant Penetrations and JointsJose Santosspecial
10/09/2024Tenant Protection Plan ComplianceYahaira Volquez Colombospecial
10/09/2024Energy Code Compliance InspectionsJose Santosprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01087221-P1Request digital key ↗
08/20/2026X01087221-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026X01087221-I1Open ↗
08/29/2026X01087221-I1Open ↗
08/23/2026X01087221-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026X01087221-P1Open ↗
08/20/2026X01087221-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026X01087221-I1Open ↗
08/23/2026X01087221-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026X01087221-P1Open ↗
08/20/2026X01087221-I1Open ↗