← Back
Office only, 2-6 stories
1418 WILLIAMSBRIDGE ROAD
BRONX · BIN 2044093
💬 Discuss this project
1901Year Built
2Stories
O2Building Class
R6Zoning
2,250 sfGross Floor Area
1Units
0 Open Violations
Office only, 2-6 stories · Owner of record: WILLIAMSBRIDGE REALTY MANAGEMENT LLC · 2,515 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction15p · 2 filings · 20 docs
CellarUnder Construction8p · 1 filing · 9 docs
2 jobs · most recent 07/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026Permit IssuedDVE CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEAD-AA24NL 31,400 BTU · Vrf Indoor ×1
PEAD-AA36NL 38,000 BTU · Fan Coil Indoor ×1
03/26/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM-U1 60,000 BTU · Heat Pump Outdoor ×1
2 jobs · most recent 07/17/2026
Water/Sanitary
FiledStatusContractorScope
07/17/2026Permit IssuedRRP PLUMBING CORPWater/Sanitary
03/26/2026——Water/Sanitary
Building Lifecycle
All (72)Filed (7)Permit Issued (3)Violation (6)Objection (26)Special Inspection (30)
09/17/2026
Permit issued — Plumbing
X01429392-S2-PL
09/16/2026
Permit issued — General Construction
X01429392-I1-GC
09/16/2026
Permit issued — Mechanical Systems
X01429392-S1-MS
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Scope
07/30/2026
Objection raised — Cost
07/30/2026
Objection raised — Fire_Protection
07/30/2026
Objection raised — Admin
07/30/2026
Objection raised — Other
07/17/2026
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: INSTALL NEW AHUs, DUCTWORK AND DIFFUSERS PER NEW LAYOUT. INSTALL NEW FRESH AIR INTAKE SYSTEM. INSTALL NEW EXHAUST FAN AND DUCTWORK. NO CHANGE TO OCCUPANCY, EGRESS OR USE.
X01429392-S2
07/17/2026
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: INSTALL NEW AHUs, DUCTWORK AND DIFFUSERS PER NEW LAYOUT. INSTALL NEW FRESH AIR INTAKE SYSTEM. INSTALL NEW EXHAUST FAN AND DUCTWORK. NO CHANGE TO OCCUPANCY, EGRESS OR USE.
X01429392-S1
07/17/2026
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: INSTALL NEW AHUs, DUCTWORK AND DIFFUSERS PER NEW LAYOUT. INSTALL NEW FRESH AIR INTAKE SYSTEM. INSTALL NEW EXHAUST FAN AND DUCTWORK. NO CHANGE TO OCCUPANCY, EGRESS OR USE.
X01429392-I1
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/10/2026
Special inspection requirement — Heating Systems
07/10/2026
Special inspection requirement — Mechanical Systems
07/10/2026
Special inspection requirement — Final
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
07/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/10/2026
Special inspection requirement — Maintenance information
07/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/10/2026
Special inspection requirement — Shutoff dampers
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
07/10/2026
Special inspection requirement — Interior lighting power
07/10/2026
Special inspection requirement — Maintenance information
07/10/2026
Special inspection requirement — Lighting controls
05/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/07/2026
Special inspection requirement — Maintenance information
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/03/2026
Objection raised — Energy
04/03/2026
Objection raised — Energy
03/26/2026
Filed — Alteration CO
THIS ALT CO APPLICATION IS FILED FOR PROFESSIONAL OFFICE INTERIOR RENOVATION, OBTAIN A NEW C. OF O -NO VERTICAL OR HORIZONTAL EXTENSION& ENLARGEMENT
X01298860-P1
03/26/2026
Filed — Alteration CO
THIS ALT CO APPLICATION IS FILED FOR PROFESSIONAL OFFICE INTERIOR RENOVATION, OBTAIN A NEW C. OF O -NO VERTICAL OR HORIZONTAL EXTENSION& ENLARGEMENT
X01298860-S2
03/26/2026
Filed — Alteration CO
THIS ALT CO APPLICATION IS FILED FOR PROFESSIONAL OFFICE INTERIOR RENOVATION, OBTAIN A NEW C. OF O -NO VERTICAL OR HORIZONTAL EXTENSION& ENLARGEMENT
X01298860-S1
03/25/2026
Special inspection requirement — Maintenance information
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
03/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
03/23/2026
Special inspection requirement — Fenestration air leakage
03/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/23/2026
Special inspection requirement — Interior lighting power
02/03/2026
Objection resolved — Addressed
12/19/2025
Objection raised — Energy
12/18/2025
Objection raised — Admin
12/18/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
Latest 60 of 72 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2025$953K—— → —$423/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC ENGINEERING PC307/17/2026
SION CONSULTING ENGINEERING PC403/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DVE CONSTRUCTION INCGeneral Contractor209/17/2026
RRP PLUMBING CORPPlumbing109/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108303/26/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRRP PLUMBING CORP09/17/2026
DOB NOWGeneral ConstructionPermit IssuedDVE CONSTRUCTION INC09/16/2026
DOB NOWMechanical SystemsPermit IssuedDVE CONSTRUCTION INC09/16/2026
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/10/2026Fire-Resistant Penetrations and Joints—special
07/10/2026Heating Systems—special
07/10/2026Mechanical Systems—special
07/10/2026Final—progress
07/10/2026Energy Code Compliance Inspections—progress
07/10/2026HVAC-R and service water heating system controls—energy_progress
07/10/2026HVAC-R and service water heating equipment—energy_progress
07/10/2026HVAC-R and service water piping design and insulation—energy_progress
07/10/2026Maintenance information—energy_progress
07/10/2026Duct leakage testing, insulation and design—energy_progress
07/10/2026Shutoff dampers—energy_progress
07/10/2026Fire-Resistant Penetrations and Joints—special
07/10/2026Energy Code Compliance Inspections—progress
07/10/2026Interior lighting power—energy_progress
07/10/2026Maintenance information—energy_progress
07/10/2026Lighting controls—energy_progress
05/07/2026Duct leakage testing, insulation and design—energy_progress
05/07/2026HVAC-R and service water heating equipment—energy_progress
05/07/2026Maintenance information—energy_progress
05/07/2026HVAC-R and service water heating system controls—energy_progress
05/07/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Maintenance information—energy_progress
03/24/2026HVAC-R and service water piping design and insulation—energy_progress
03/24/2026Energy Code Compliance Inspections—progress
03/24/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 39.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026X01298860-I1Request digital key ↗
08/17/2026X01298860-P1Request digital key ↗
08/17/2026X01298860-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/17/2026X01298860-P1Open ↗
08/17/2026X01298860-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026X01298860-P1Open ↗
08/17/2026X01298860-S1Open ↗
08/17/2026X01298860-S2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/17/2026X01298860-P1Open ↗
08/17/2026X01298860-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026X01298860-I1Open ↗
08/17/2026X01298860-S2Open ↗
08/17/2026X01298860-P1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/17/2026X01298860-P1Open ↗
08/17/2026X01298860-I1Open ↗
▸DOB NOWFinal Survey1
08/17/2026X01298860-I1Open ↗