← Back
Two stories - detached, small or mid-size
1105 SACKET AVENUE
BRONX · BIN 2044225
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4AZoning
1,720 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,325 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
CellarUnder Construction17p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2023$655K—— → —$381/sf building
10/14/2022$575K—Private party → Private party$334/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C106/25/2026
F360 ARCHITECTURE PLLC306/02/2026
JT ENGINEERING, PC202/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UP DESIGN SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BATZ ENTERPRISES INCGeneral Contractor107/08/2026
DIOMEDES E ARBOLEDAGeneral Contractor107/08/2026
SAMUEL & SONS P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292306/25/2026
JT ENGINEERING, PC7840202/13/2025
Building Lifecycle
All (45)Filed (6)Permit Issued (3)Inspection (3)Objection (15)Special Inspection (18)
08/07/2026
Objection resolved — Resolved
08/07/2026
Objection resolved — Resolved
08/07/2026
Objection resolved — Resolved
07/09/2026
Objection raised — Admin
07/09/2026
Objection raised — Structural
07/09/2026
Objection raised — Other
06/25/2026
Filed — Alteration
FILING FOR STRUCTURAL WORK AT FRONT PORCH STRUCTURE AS PER PLANS SUBMITTED HEREWITH.
X00975555-S1
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Other
06/18/2026
Objection raised — Other
06/09/2026
Special inspection requirement — Masonry
Jose Santos
06/05/2026
Special inspection requirement — Structural Steel - Details
Jose Santos
06/05/2026
Special inspection requirement — Final
Rilder Mejia
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
06/02/2026
Filed — Alteration
FILING FOR STRUCTURAL WORK AT FRONT PORCH STRUCTURE AS PER PLANS SUBMITTED HEREWITH.
X00975555-P3
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
06/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Jose Santos
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
04/15/2026
Permit issued — General Construction
X00975555-I1-GC
02/12/2026
Permit issued — General Construction
X00975555-I1-GC
09/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Jose Santos
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
09/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
09/05/2025
Filed — Alteration
FILING FOR STRUCTURAL WORK AT FRONT PORCH STRUCTURE AS PER PLANS SUBMITTED HEREWITH.
X00975555-P2
08/19/2025
Special inspection requirement — Concrete - Cast-In-Place
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Jose Cruz
08/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jose Cruz
03/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jafet Tavarez
02/21/2025
Objection resolved — Addressed
02/19/2025
Objection raised — Other
02/13/2025
Filed — Alteration
INSTALLATION OF A GAS FIRED COMBINATION BOILER AND ASSOCIATED RELATED PIPING AND ACCESORIES.
X00975342-P1
12/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jafet Tavarez
08/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2024
Permit issued — Plumbing
X00975342-I1-PL
01/02/2024
Objection raised — Zoning
01/02/2024
Objection resolved — Addressed
01/02/2024
Objection raised — Other
01/02/2024
Objection resolved — Addressed
12/28/2023
Filed — Alteration
INSTALLATION OF A GAS FIRED COMBINATION BOILER AND ASSOCIATED RELATED PIPING AND ACCESORIES.
X00975342-I1
12/27/2023
Filed — Alteration
FILING FOR STRUCTURAL WORK AT FRONT PORCH STRUCTURE AS PER PLANS SUBMITTED HEREWITH.
X00975555-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDIOMEDES E ARBOLEDA04/15/2026
DOB NOWGeneral ConstructionPermit IssuedBATZ ENTERPRISES02/12/2026
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC07/10/2024
1 project · most recent 02/13/2025
Gas
FiledStatusContractorScope
02/13/2025Signed-offSAMUEL & SONS P & H INCGas
1 project · most recent 06/25/2026
Steel Concrete
FiledStatusContractorScope
06/25/2026Permit IssuedDIOMEDES E ARBOLEDASteel, Concrete
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/09/2026MasonryJose Santosspecial
06/05/2026Structural Steel - DetailsJose Santosspecial
06/05/2026FinalRilder Mejiaprogress
06/05/2026Structural Stability – Alterations of existing buildingsJose Santosspecial
06/02/2026Energy Code Compliance InspectionsJose Cruzprogress
06/02/2026Fire-Resistance Rated ConstructionJose Cruzprogress
06/02/2026Concrete - Cast-In-PlaceJose Santosspecial
06/02/2026Fire-Resistant Penetrations and JointsJose Santosspecial
09/18/2025Concrete - Cast-In-PlaceJose Santosspecial
09/18/2025Fire-Resistant Penetrations and JointsJose Santosspecial
09/18/2025Energy Code Compliance InspectionsJose Cruzprogress
09/18/2025Fire-Resistance Rated ConstructionJose Cruzprogress
08/19/2025Concrete - Cast-In-Place—special
08/19/2025Fire-Resistant Penetrations and Joints—special
08/19/2025Energy Code Compliance InspectionsJose Cruzprogress
08/19/2025Fire-Resistance Rated ConstructionJose Cruzprogress
02/27/2025Fire-Resistant Penetrations and JointsJafet Tavarezspecial
12/06/2024Fire-Resistant Penetrations and JointsJafet Tavarezspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026X00975342-I1Request digital key ↗
08/18/2026X00975555-P4Request digital key ↗
08/16/2026X00975555-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026X00975342-I1Open ↗
08/21/2026X00975342-P1Open ↗
08/18/2026X00975555-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X00975555-P3Open ↗
09/01/2026X00975555-P3Open ↗
08/30/2026X00975342-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X00975555-P3Open ↗
09/01/2026X00975555-P3Open ↗
08/23/2026X00975555-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026X00975342-I1Open ↗
08/18/2026X00975555-P4Open ↗
08/16/2026X00975555-I1Open ↗
Showing 3 of 7 on file for this type