← Back
Over six families without stores
1963 HOBART AVENUE
BRONX · BIN 2047336
💬 Discuss this project
1928Year Built
3Stories
C1Building Class
R6Zoning
4,560 sfGross Floor Area
7Units
Rent Stabilized8 Open Violations ▸
Over six families without stores · Owner of record: 1963 HOBART AVENUE REALTY CORP. · 2,375 sf lot · 1.92 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1963 HOBART AVENUE REALTY CORP707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C211/04/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY UNITED A-1 CONST INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292211/04/2024
Building Lifecycle
All (41)Filed (2)Permit Issued (1)Signed Off (1)Violation (23)Objection (6)Special Inspection (8)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
12/06/2024
Signed off — Alteration
PROPOSE TO PERFORM FACADE WORK AT THE UPPER FRONTAL JOINT AS PER PLANS SUBMITTED HERWITH. C HOOKS SCAFFOLDING FROM THE SIDE WALL AND LIGHT PIPE SCAFFOLDING WILL BE USED.
X01088741-I1
11/18/2024
Permit issued — General Construction
X01088741-I1-GC
11/12/2024
Special inspection requirement — Final
Rilder Mejia
11/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
11/12/2024
Special inspection requirement — Masonry
Jose Santos
11/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jose Santos
11/04/2024
Filed — Alteration
PROPOSE TO PERFORM FACADE WORK AT THE UPPER FRONTAL JOINT AS PER PLANS SUBMITTED HERWITH. C HOOKS SCAFFOLDING FROM THE SIDE WALL AND LIGHT PIPE SCAFFOLDING WILL BE USED.
X01088741-P1
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/04/2024
Special inspection requirement — Masonry
Jose Santos
11/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
11/04/2024
Special inspection requirement — Final
08/29/2024
Objection resolved — Addressed
08/22/2024
Objection resolved — Addressed
08/22/2024
Objection resolved — Addressed
08/13/2024
Objection raised — Other
08/13/2024
Objection raised — Other
08/13/2024
Objection raised — Scope
08/06/2024
Filed — Alteration
PROPOSE TO PERFORM FACADE WORK AT THE UPPER FRONTAL JOINT AS PER PLANS SUBMITTED HERWITH. C HOOKS SCAFFOLDING FROM THE SIDE WALL AND LIGHT PIPE SCAFFOLDING WILL BE USED.
X01088741-I1
02/17/2022
Violation issued (HPD, closed)
A
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/11/2018
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2017
Violation issued (HPD, closed)
I
10/31/2016
Violation issued (HPD, closed)
I
10/05/2015
Violation issued (HPD, closed)
I
02/04/2015
Violation issued (HPD, closed)
I
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2009
Violation issued (HPD, open)
B
03/31/2009
Violation issued (HPD, open)
A
03/26/2009
Violation issued (HPD, open)
A
03/26/2009
Violation issued (HPD, open)
A
02/25/2009
Violation issued (HPD, open)
B
02/25/2009
Violation issued (HPD, open)
B
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY UNITED A-1 CONST INC11/18/2024
BISEQISSUEDMULTILINE CONTR GROUP INC05/09/2014
BISOTISSUEDMULTILINE CONTR GROUP INC05/08/2014
BISEQISSUEDMULTILINE CONTR GROUP INC05/08/2014
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/12/2024FinalRilder Mejiaprogress
11/12/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
11/12/2024MasonryJose Santosspecial
11/12/2024Tenant Protection Plan ComplianceJose Santosspecial
11/04/2024Tenant Protection Plan Compliance—special
11/04/2024MasonryJose Santosspecial
11/04/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
11/04/2024Final—progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01088741-I1Request digital key ↗
08/20/2026X01088741-P1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION2
05/29/2014220380754Open ↗
05/27/2014220380763Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
05/29/2014220380763Open ↗
05/29/2014220380754Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/30/2014220380763Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026X01088741-P1Open ↗
08/26/2026X01088741-I1Open ↗
08/26/2026X01088741-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/29/2014220380763Open ↗
05/29/2014220380754Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/29/2014220380763Open ↗
05/29/2014220380754Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/30/2014220380754Open ↗
05/29/2014220380754Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026X01088741-I1Open ↗
08/13/2026X01088741-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026X01088741-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026X01088741-I1Open ↗
08/13/2026X01088741-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/29/2014220380754Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/30/2014220380763Open ↗
12/30/2014220380754Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/30/2014220380754Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/30/2014220380754Open ↗
05/29/2014220380754Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/29/2014220380763Open ↗
05/29/2014220380754Open ↗