← Back
Two family brick
2022 TOMLINSON AVENUE
BRONX · BIN 2049176
💬 Discuss this project
1935Year Built
2Stories
B1Building Class
R4-1Zoning
2,128 sfGross Floor Area
2Units
5 Open Violations 1 unresolved · 4 paperwork only ▸
Two family brick · 2,500 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction2p · 1 filing · 11 docs
Basement1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALBERT MONTOYA ARCHITECT306/25/2026
PARKER AND WEST ENGINEERING, PLLC110/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACTION 1 MAINT CONT INCGeneral Contractor204/09/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/14/2025
Building Lifecycle
All (34)Filed (4)Permit Issued (3)Signed Off (1)Violation (1)Objection (18)Special Inspection (7)
06/25/2026
Filed — Alteration
install new rear window in dining room AND EXTEND EXISTING DECK 4'-6" AT REAR.
X01315289-P2
06/24/2026
Special inspection requirement — Final
KAMRUL AHSAN
04/30/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01301074-I1
03/12/2026
Objection resolved — Addressed
03/11/2026
Permit issued — General Construction
X01315289-I1-GC
03/11/2026
Objection resolved — Addressed
03/05/2026
Objection resolved — Addressed
03/04/2026
Objection raised — Scope
03/04/2026
Objection raised — Other
03/04/2026
Objection raised — Other
02/26/2026
Filed — Alteration
install new rear window in dining room AND EXTEND EXISTING DECK 4'-6" AT REAR.
X01315289-P1
02/24/2026
Special inspection requirement — Final
KAMRUL AHSAN
12/16/2025
Permit issued — General Construction
X01315289-I1-GC
12/04/2025
Objection raised — Zoning
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection raised — Other
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection raised — Zoning
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/13/2025
Objection raised — Admin
11/13/2025
Objection raised — Scope
11/13/2025
Objection raised — Cost
11/07/2025
Filed — Alteration
install new rear window in dining room AND EXTEND EXISTING DECK 4'-6" AT REAR.
X01315289-I1
10/21/2025
Permit issued — Solar
X01301074-I1-SL
10/14/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01301074-I1
10/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
10/10/2025
Special inspection requirement — Final
Walid Abdulla
10/10/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/22/2002
Violation issued (HPD, open)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedACTION 1 MAINT CONT INC03/11/2026
DOB NOWGeneral ConstructionPermit IssuedACTION 1 MAINT CONT INC12/16/2025
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC10/21/2025
1 job · most recent 10/13/2025
FiledStatusContractorScope
10/13/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 job · most recent 10/14/2025
FiledStatusContractorScope
10/14/2025Signed-offSUNRUN INSTALLATION SVC40 panels, 16.4 kw, 420.45 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/24/2026FinalKAMRUL AHSANprogress
02/24/2026FinalKAMRUL AHSANprogress
10/10/2025Energy Code Compliance InspectionsWalid Abdullaprogress
10/10/2025FinalWalid Abdullaprogress
10/10/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
10/10/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/10/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026X01315289-I1Request digital key ↗
08/17/2026X01315289-P2Request digital key ↗
08/17/2026X01315289-P1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026X01315289-P1Open ↗
08/31/2026X01301074-I1Open ↗
08/31/2026X01301074-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026X01315289-I1Open ↗
08/17/2026X01315289-P2Open ↗
08/17/2026X01315289-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026X01301074-I1Open ↗
08/31/2026X01301074-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026X01315289-P2Open ↗
08/17/2026X01315289-P1Open ↗
08/17/2026X01315289-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01301074-I1Open ↗