← Back
One story retail building
676 ALLERTON AVENUE
BRONX · BIN 2051303
💬 Discuss this project
1932Year Built
1Stories
K1Building Class
R6Zoning
5,319 sfGross Floor Area
4Units
12 Open Violations ▸
One story retail building · Owner of record: 674 ALLERTON REALTY · 4,851 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEOR MANAGEMENT1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILLAH ENGINEERING PLLC301/22/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INFINITI ESC PLUMBING CORPlumbing407/08/2026
ALMUNIR CORPGeneral Contractor207/08/2026
RDT HOME INPROVEMENT CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BILLAH ENGINEERING5838101/08/2021
Building Lifecycle
All (34)Filed (3)Permit Issued (4)Signed Off (1)Violation (18)Inspection (5)Special Inspection (3)
05/23/2024
Permit issued — General Construction
X00449393-I1-GC
05/21/2024
Signed off — Alteration
Filing for minor plumbing work type to install commercial gas cooking Equpment, and also to install plumbing fixtures including hand-wash sink, and three compartment sink inside 1st fl commercial space (DELI). work as per plans.
X00941791-I1
05/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2024
Filed — Alteration
Filing for minor plumbing work type to install commercial gas cooking Equpment, and also to install plumbing fixtures including hand-wash sink, and three compartment sink inside 1st fl commercial space (DELI). work as per plans.
X00941791-P1
01/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/16/2023
Permit issued — Plumbing
X00941791-I1-PL
11/01/2023
Filed — Alteration
Filing for minor plumbing work type to install commercial gas cooking Equpment, and also to install plumbing fixtures including hand-wash sink, and three compartment sink inside 1st fl commercial space (DELI). work as per plans.
X00941791-I1
10/10/2023
Permit issued — General Construction
X00449393-I1-GC
01/21/2021
Permit issued — General Construction
X00449393-I1-GC
01/08/2021
Filed — Alteration
FILING FOR INTERIOR WORK OF EXISTING COMMERCIAL SPACE USE GROUP#6. WORK INCLUDES INTERIOR CARPENTRY, AND INTERIOR FINISHES THROUGHOUT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00449393-I1
01/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
01/08/2021
Special inspection requirement — Fenestration areas
MOHAMMAD BILLAH
01/07/2021
Special inspection requirement — Final
MOHAMMAD BILLAH
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/01/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/09/2009
Violation issued (ECB, closed)
Boilers
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/29/2007
Violation issued (ECB, closed)
Boilers
03/15/2004
Violation issued (ECB, closed)
Boilers
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/23/2001
Violation issued (ECB, closed)
Boilers
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedALMUNIR CORP05/23/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR11/16/2023
DOB NOWGeneral ConstructionPermit IssuedALMUNIR CORP10/10/2023
DOB NOWGeneral ConstructionPermit IssuedRDT HOME INPROVEMENT CORP01/21/2021
BISPLISSUEDL.L.G. PLBG & HTG INC02/07/2012
BISMHISSUEDJM CONTRACTORS (NY) INC11/16/2011
BISMHISSUEDUNITED KITCHEN SYSTEMS IN10/07/2011
BISPLISSUEDL.L.G. PLBG & HTG INC08/30/2011
BISOTISSUEDBCS CONSTRUCT SERV CORP08/08/2011
BISEQISSUEDKORMAN DESIGN & BUILD06/18/2008
BISOTISSUEDKORMAN DESIGN & BUILD06/18/2008
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/29/1999
BISMHISSUEDABC MACHINERY CORP.02/08/1999
BISOTISSUEDABC MACHINERY CORP.02/03/1999
BISPLISSUEDAVON PLBG & HTG INC08/12/1998
BISMHISSUEDHOSCON CONST. CORP08/12/1998
BISEQISSUEDHOSCON CONST. CORP08/12/1998
1 project · most recent 05/07/2025
FiledStatusContractorScope
05/07/2025Permit IssuedJOE ELECTRICAL INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/08/2021Fire-Resistant Penetrations and JointsMOHAMMAD BILLAHspecial
01/08/2021Fenestration areasMOHAMMAD BILLAHenergy_progress
01/07/2021FinalMOHAMMAD BILLAHprogress
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/22/2026X00941791-I1Request digital key ↗
08/22/2026X00941791-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00449393-I1Request digital key ↗
▸Applications & Permits14
▸BISWORK PERMIT APPLICATION8
02/09/2012220155766Open ↗
11/19/2011220155766Open ↗
10/07/2011220142548Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
11/17/2011220155766Open ↗
10/14/2011220132853Open ↗
10/12/2011220132853Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications28
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
03/15/2012220132853Open ↗
01/03/2012220132853Open ↗
11/17/2011220155766Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
11/17/2011220155766Open ↗
09/26/2011220142548Open ↗
08/06/2011220132853Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/17/2011220155766Open ↗
09/26/2011220142548Open ↗
08/06/2011220132853Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026X00941791-I1Open ↗
08/22/2026X00941791-P1Open ↗
08/13/2026X00449393-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X00449393-I1Open ↗
08/26/2026X00449393-I1Open ↗
▸BISPC FULL REPORT1
09/14/2007210013705Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X00449393-I1Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING4
11/17/2011220155766Open ↗
10/14/2011220132853Open ↗
10/12/2011220132853Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
03/02/2012220155766Open ↗
03/02/2012220155766Open ↗
11/30/2011220132853Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
11/18/2011220132853Open ↗
10/25/2011220132853Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/18/2008210055321Open ↗
▸Environmental & Asbestos7
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
11/17/2011220155766Open ↗
09/26/2011220142548Open ↗
08/06/2011220132853Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026X00941791-I1Open ↗
08/22/2026X00941791-P1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY3
11/17/2011220155766Open ↗
09/26/2011220142548Open ↗
08/06/2011220132853Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/03/2012220132853Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS5
11/17/2011220155766Open ↗
09/26/2011220142548Open ↗
08/06/2011220132853Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/15/2012220132853Open ↗
02/21/2012220132853Open ↗
01/03/2012220132853Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/03/2012220132853Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
01/03/2012220132853Open ↗
11/17/2011220155766Open ↗
09/26/2011220142548Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
11/17/2011220155766Open ↗
09/26/2011220142548Open ↗
08/06/2011220132853Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
10/12/2011220132853Open ↗
11/30/2007210013705Open ↗
11/01/2007210013705Open ↗
▸Other Documents1
▸BISECCCNYS Analysis1
10/12/2011220142548Open ↗