← Back
Two family brick
2521 PAULDING AVENUE
BRONX · BIN 2051706
💬 Discuss this project
1950Year Built
2Stories
B1Building Class
R5Zoning
1,962 sfGross Floor Area
2Units
3 Open Violations 0 unresolved · 3 paperwork only ▸
Two family brick · 1,800 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction3p · 1 filing · 20 docs
BasementUnder Construction4p · 2 filings · 20 docs
Sub-BasementUnder Construction3p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN ARCHITECTURAL DESIGN, PC407/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW PRIME GENERAL CONSTRUGeneral Contractor104/09/2026
PLBG P & H INCPlumbing107/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MELDAN GROUP LLC8100307/17/2026
Building Lifecycle
All (61)Filed (4)Permit Issued (2)Violation (4)Inspection (4)Objection (22)Special Inspection (25)
08/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/17/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2026
Special inspection requirement — Metering
07/29/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/29/2026
Special inspection requirement — Air barrier - visual inspection
07/29/2026
Special inspection requirement — Fenestration air leakage
07/29/2026
Special inspection requirement — Fenestration areas
07/29/2026
Special inspection requirement — Insulation placement and R values
07/29/2026
Special inspection requirement — Interior lighting power
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
07/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/27/2026
Objection raised — Scope
07/27/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Addressed
07/24/2026
Objection raised — Other
07/17/2026
Filed — Alteration
APPLICATION FILED FOR LEGALIZATION OF 3-PIECE BATHROOM((1)SHOWER, (1)LAV & (1) W.C.) & KITCHEN((1)SINK & (1) GAS RANGE) IN BASEMENT. IN ORDER TO RECTIFY ECB VIOLATION# 39130791Y. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01164375-P2
07/17/2026
Filed — Alteration CO
CHANGE IN CERTIFICATE OF OCCUPANCY 1)RECTIFY ECB VIOLATION #39130791Y, #39130788N 2)PROPOSED CONVERSION OF 1 TO 2 FAMILY DWELLING 3)LEGALIZE EXTERIOR WALL & WINDOW INSTALLED. NO CHANGE IN USE, EGRESS, AND BULK.
X01163342-P1
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Reid
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/16/2026
Permit issued — Plumbing
X01164375-I1-PL
04/06/2026
Permit issued — General Construction
X01163342-I1-GC
02/19/2026
Violation issued (ECB, open)
Construction
02/19/2026
Violation issued (ECB, open)
Construction
02/19/2026
Special inspection requirement — Fenestration air leakage
02/19/2026
Special inspection requirement — Metering
02/19/2026
Special inspection requirement — Fenestration areas
02/19/2026
Special inspection requirement — Interior lighting power
02/19/2026
Special inspection requirement — Insulation placement and R values
02/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/19/2026
Special inspection requirement — Air barrier - visual inspection
02/19/2026
Special inspection requirement — Electric vehicle service equipment requirements
02/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/19/2026
Special inspection requirement — Energy Code Compliance Inspections
02/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/10/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
05/03/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Admin
01/30/2025
Objection raised — Zoning
01/30/2025
Objection raised — Scope
01/30/2025
Objection raised — Zoning
01/30/2025
Objection raised — Fire_Protection
01/30/2025
Objection raised — Scope
01/30/2025
Objection raised — Energy
01/30/2025
Objection raised — Admin
01/22/2025
Objection raised — Scope
01/21/2025
Filed — Alteration
APPLICATION FILED FOR LEGALIZATION OF 3-PIECE BATHROOM((1)SHOWER, (1)LAV & (1) W.C.) & KITCHEN((1)SINK & (1) GAS RANGE) IN BASEMENT. IN ORDER TO RECTIFY ECB VIOLATION# 39130791Y. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01164375-I1
01/17/2025
Filed — Alteration CO
CHANGE IN CERTIFICATE OF OCCUPANCY 1)RECTIFY ECB VIOLATION #39130791Y, #39130788N 2)PROPOSED CONVERSION OF 1 TO 2 FAMILY DWELLING 3)LEGALIZE EXTERIOR WALL & WINDOW INSTALLED. NO CHANGE IN USE, EGRESS, AND BULK.
X01163342-I1
11/20/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLBG P & H INC06/16/2026
DOB NOWGeneral ConstructionPermit IssuedNEW PRIME GENERAL CONSTRU04/06/2026
1 project · most recent 07/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/17/2026Permit IssuedPLBG P & H INCGas, Water/Sanitary
1 project · most recent 06/07/2026
General Wiring
FiledStatusContractorScope
06/07/2026Permit IssuedR.A. PHILLIPS ELEC'L CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/29/2026Fire-Resistant Penetrations and Joints—special
07/29/2026Metering—energy_progress
07/29/2026Electric vehicle service equipment requirements—energy_progress
07/29/2026Fenestration and door U-factor and product ratings—energy_progress
07/29/2026Air barrier - visual inspection—energy_progress
07/29/2026Fenestration air leakage—energy_progress
07/29/2026Fenestration areas—energy_progress
07/29/2026Insulation placement and R values—energy_progress
07/29/2026Interior lighting power—energy_progress
07/29/2026Energy Code Compliance Inspections—progress
07/29/2026Fire-Resistance Rated Construction—progress
07/29/2026Structural Stability – Alterations of existing buildings—special
07/07/2026Fire-Resistant Penetrations and JointsJeffrey Reidspecial
02/19/2026Fenestration air leakage—energy_progress
02/19/2026Metering—energy_progress
02/19/2026Fenestration areas—energy_progress
02/19/2026Interior lighting power—energy_progress
02/19/2026Insulation placement and R values—energy_progress
02/19/2026Fenestration and door U-factor and product ratings—energy_progress
02/19/2026Air barrier - visual inspection—energy_progress
02/19/2026Electric vehicle service equipment requirements—energy_progress
02/19/2026Fire-Resistance Rated Construction—progress
02/19/2026Energy Code Compliance Inspections—progress
02/19/2026Structural Stability – Alterations of existing buildings—special
02/19/2026Fire-Resistant Penetrations and Joints—special
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026X01163342-I1Request digital key ↗
08/20/2026X01164375-P2Request digital key ↗
08/15/2026X01164375-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01163342-P1Open ↗
08/13/2026X01163342-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature20
08/23/2026X01163342-I1Open ↗
08/23/2026X01163342-I1Open ↗
08/23/2026X01163342-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/23/2026X01164375-P2Open ↗
08/23/2026X01163342-I1Open ↗
08/23/2026X01163342-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026X01163342-P1Open ↗
08/20/2026X01163342-I1Open ↗
08/20/2026X01164375-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026X01163342-I1Open ↗
08/13/2026X01163342-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026X01163342-I1Open ↗
08/20/2026X01164375-P2Open ↗
08/15/2026X01164375-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/20/2026X01163342-I1Open ↗
08/14/2026X01163342-P1Open ↗