← Back
Four families
2520 EASTCHESTER ROAD
BRONX · BIN 2053039
💬 Discuss this project
1955Year Built
1.5Stories
C3Building Class
R3-2Zoning
3,528 sfGross Floor Area
4Units
Rent Stabilized17 Open Violations 16 unresolved · 1 paperwork only ▸
Four families · Owner of record: 2520 EASTCHESTER LLC · 5,000 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Floor 33p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER REPRESENTATIVE707/08/2026
2520 EASTCHESTER LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/03/2023$1.3M—— → —$368/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILD TECH PROFESSIONAL CORP503/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILD-TECH PROFESSIONALS CORP.503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BG INTERIORS INCGeneral Contractor207/08/2026
LINTECH ELECTRIC, INC.Electrical103/22/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILD-TECH CONSTRUCTION612603/14/2025
NS ENGINEERS, P.C.1442103/12/2025
Building Lifecycle
All (60)Filed (5)Permit Issued (3)Violation (29)Inspection (5)Objection (10)Special Inspection (8)
08/11/2026
Violation issued (ECB, open)
Construction
08/11/2026
Violation issued (ECB, open)
Zoning
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, closed)
I
06/24/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/05/2025
Permit issued — Mechanical Systems
X01052944-S3-MS
06/05/2025
Violation issued (HPD, open)
A
05/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TEOFILO INFANTE
03/14/2025
Filed — Alteration
Installation of electric heating and air conditioning units.
X01052944-P2
03/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TEOFILO INFANTE
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TEOFILO INFANTE
03/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
TEOFILO INFANTE
03/14/2025
Special inspection requirement — Interior lighting power
TEOFILO INFANTE
03/12/2025
Filed — Alteration
Installation of electric heating and air conditioning units.
X01052944-P1
03/12/2025
Filed — Alteration
Installation of electric heating and air conditioning units.
X01052944-S3
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TEOFILO INFANTE
12/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2024
Special inspection requirement — Final
Shamsul Siddique
12/16/2024
Special inspection requirement — Mechanical Systems
Shamsul Siddique
09/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/19/2024
Permit issued — General Construction
X01052944-I1-GC
08/14/2024
Objection resolved — Addressed
08/13/2024
Permit issued — Plumbing
X01052944-S1-PL
07/26/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/24/2024
Objection resolved — Addressed
07/22/2024
Filed — Alteration
Installation of electric heating and air conditioning units.
X01052944-S1
07/22/2024
Objection raised — Cost
07/22/2024
Objection raised — Scope
07/22/2024
Objection raised — Scope
07/22/2024
Objection raised — Other
07/22/2024
Objection raised — Other
07/15/2024
Filed — Alteration
Installation of electric heating and air conditioning units.
X01052944-I1
04/02/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
10/28/2016
Violation issued (HPD, closed)
I
10/05/2015
Violation issued (HPD, closed)
I
07/18/2013
Violation issued (HPD, open)
A
07/18/2013
Violation issued (HPD, open)
B
07/18/2013
Violation issued (HPD, open)
A
07/18/2013
Violation issued (HPD, open)
A
07/18/2013
Violation issued (HPD, open)
B
07/18/2013
Violation issued (HPD, open)
A
07/18/2013
Violation issued (HPD, open)
B
07/18/2013
Violation issued (HPD, open)
A
07/18/2013
Violation issued (HPD, open)
A
07/18/2013
Violation issued (HPD, open)
B
07/18/2013
Violation issued (HPD, open)
B
08/26/2008
Violation issued (ECB, closed)
Construction
01/29/2008
Violation issued (ECB, open)
Plumbing
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBG INTERIORS INC06/05/2025
DOB NOWGeneral ConstructionSigned-offBG INTERIORS INC08/19/2024
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP08/13/2024
1 project · most recent 03/14/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/14/2025Permit IssuedBG INTERIORS INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric Mini-split MSZ-G509NA 6,000 BTU · Split System ×5
MSZ-G512NA 6,000 BTU · Split System ×2
MINI-SPLIT MLZKA09NA2 9,000 BTU · Fan Coil Indoor ×1
MINI-SPLIT MSZ-FS15NA 15,000 BTU · Split System ×1
Mini-split MFZ-KJ09NA 9,000 BTU · Fan Coil Indoor ×1
Mini-split MSZ-G518NA 18,000 BTU · Fan Coil Indoor ×1
1 project · most recent 03/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/14/2025Signed-offAQUA PLUMBING & HTNG CORPGas, Water/Sanitary
1 project · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/24/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/21/2025Fire-Resistant Penetrations and JointsTEOFILO INFANTEspecial
03/14/2025Structural Stability – Alterations of existing buildingsTEOFILO INFANTEspecial
03/14/2025Fire-Resistant Penetrations and JointsTEOFILO INFANTEspecial
03/14/2025Fire-Resistance Rated ConstructionTEOFILO INFANTEprogress
03/14/2025Interior lighting powerTEOFILO INFANTEenergy_progress
01/16/2025Fire-Resistant Penetrations and JointsTEOFILO INFANTEspecial
12/16/2024FinalShamsul Siddiqueprogress
12/16/2024Mechanical SystemsShamsul Siddiquespecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026X01052944-I1Request digital key ↗
08/20/2026X01052944-S3Request digital key ↗
08/20/2026X01052944-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026X01052944-S1Open ↗
08/20/2026X01052944-I1Open ↗
08/13/2026X01052944-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/05/2026X01052944-S3Open ↗
08/31/2026X01052944-P2Open ↗
08/31/2026X01052944-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/05/2026X01052944-S3Open ↗
08/31/2026X01052944-P2Open ↗
08/31/2026X01052944-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026X01052944-S1Open ↗
08/20/2026X01052944-I1Open ↗
08/13/2026X01052944-S3Open ↗
Showing 3 of 5 on file for this type