Two stories - detached, small or mid-size
1575 ALLERTON AVENUE
BRONX · BIN 2054647
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R4-1Zoning
768 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,025 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 13 docs
3 jobs · most recent 06/23/2025
General Wiring
FiledStatusContractorScope
06/23/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/18/2025CompleteBERGER QUALITY ELEC'L CON1 meters, 1 new_meters
03/07/2025CompleteBERGER QUALITY ELEC'L CON—
Building Lifecycle
All (15)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (10)
06/27/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01190688-I1
06/11/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
06/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
06/11/2025
Special inspection requirement — Final
Andres Arias Londono
06/10/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01190688-P1
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
06/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
06/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
06/09/2025
Special inspection requirement — Final
Andres Arias Londono
06/09/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
05/14/2025
Violation issued (ECB, open)
Unknown
03/17/2025
Permit issued — Solar
X01190688-I1-SL
03/10/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01190688-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR206/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475206/10/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY03/17/2025
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/11/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
06/11/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
06/11/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
06/11/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
06/11/2025FinalAndres Arias Londonoprogress
06/09/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
06/09/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
06/09/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
06/09/2025FinalAndres Arias Londonoprogress
06/09/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026X01190688-I1Contact architect ↗
08/20/2026X01190688-P1Contact architect ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026X01190688-P1Open ↗
08/28/2026X01190688-P1Open ↗
08/23/2026X01190688-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X01190688-I1Open ↗
08/13/2026X01190688-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026X01190688-P1Open ↗
08/22/2026X01190688-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01190688-I1Open ↗
08/13/2026X01190688-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01190688-I1Open ↗