← Back
Over six families without stores
2919 HOLLAND AVENUE
BRONX · BIN 2054833
💬 Discuss this project
1930Year Built
2.5Stories
C1Building Class
R6Zoning
2,796 sfGross Floor Area
8Units
Rent Stabilized12 Open Violations ▸
Over six families without stores · Owner of record: 2919 HOLLAND LLC · 2,500 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Floor 210p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Basement15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY CREATIVE DEVELOPERS2607/08/2026
2919 HOLLAND LLC103/22/2026
OWNER OF 2919 HOLLAND AVE103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/15/2023$725K—— → —$259/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADB ASSOCIATES812/21/2023
VASILIOS ARTEMIOU PE104/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor403/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616612/21/2023
Building Lifecycle
All (109)Filed (9)Permit Issued (4)Signed Off (3)Violation (16)Inspection (11)Objection (36)Special Inspection (30)
06/10/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (HPD, closed)
C
05/13/2026
Violation issued (HPD, open)
B
05/13/2026
Violation issued (HPD, open)
C
05/13/2026
Violation issued (HPD, open)
A
05/13/2026
Violation issued (HPD, open)
A
05/13/2026
Violation issued (HPD, open)
C
05/13/2026
Violation issued (HPD, open)
A
05/13/2026
Violation issued (HPD, open)
A
05/11/2026
Violation issued (HPD, open)
A
05/11/2026
Violation issued (HPD, open)
B
05/11/2026
Violation issued (HPD, open)
B
04/30/2026
Violation issued (HPD, closed)
A
02/27/2025
Violation issued (HPD, open)
C
02/27/2025
Violation issued (HPD, open)
C
01/10/2024
Special inspection requirement — Metering
FAHAD FATEH
01/10/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/10/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/10/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
01/10/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
01/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/10/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
01/10/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/10/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/10/2024
Special inspection requirement — Metering
FAHAD FATEH
01/10/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/10/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/10/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/10/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
01/10/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/10/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/10/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/10/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/10/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/10/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/10/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
01/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/10/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/10/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
12/21/2023
Filed — Alteration CO
Two story and basement - story 2-Family building, to be converted to a 8-Family Dwelling.
X08046464-P6
12/20/2023
Signed off — Alteration CO
Two story and basement - story 2-Family building, to be converted to a 8-Family Dwelling.
X08046464-S3
12/20/2023
Signed off — Alteration CO
Two story and basement - story 2-Family building, to be converted to a 8-Family Dwelling.
X08046464-S2
12/18/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/13/2023
Signed off — Alteration CO
Two story and basement - story 2-Family building, to be converted to a 8-Family Dwelling.
X08046464-S1
11/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/29/2023
Filed — Alteration CO
Two story and basement - story 2-Family building, to be converted to a 8-Family Dwelling.
X08046464-P4
11/29/2023
Filed — Alteration CO
Two story and basement - story 2-Family building, to be converted to a 8-Family Dwelling.
X08046464-P5
11/28/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/22/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/09/2023
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
10/20/2023
Filed — Alteration CO
Two story and basement - story 2-Family building, to be converted to a 8-Family Dwelling.
X08046464-P3
10/10/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA08/09/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC08/04/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY08/03/2023
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA08/03/2023
1 project · most recent 12/21/2023
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/21/2023Permit IssuedBUILDERS GROUP USA INCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RX12BXVJU 100,800 BTU · Heat Pump Outdoor ×14
RXS12LVJU 84,000 BTU · Heat Pump Outdoor ×14
2MXS18NMVJU 18,900 BTU · Heat Pump Outdoor ×4
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×16
QTXEN150 100 CFM · Exhaust Fan ×16
Ducts & Piping
Masterflow N/A 1 BTU ×2
1 project · most recent 12/21/2023
Storm Water/Sanitary
FiledStatusContractorScope
12/21/2023Signed-offA. M. PLUMBING COMPANYStorm, Water/Sanitary
1 project · most recent 01/10/2024
General Wiring
FiledStatusContractorScope
01/10/2024CompletePLATINUM PWR ELECTL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/18/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/28/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/22/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
11/09/2023No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
10/10/2023Pass-Final PL - UndergroundPassView ↗
08/18/2023Pass-Final PL - UndergroundPassView ↗
08/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
01/10/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/10/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/10/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/10/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/10/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/10/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/10/2024Lighting controlsFAHAD FATEHenergy_progress
01/10/2024Fenestration areasFAHAD FATEHenergy_progress
01/10/2024Fenestration air leakageFAHAD FATEHenergy_progress
01/10/2024Maintenance informationFAHAD FATEHenergy_progress
01/10/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
01/10/2024Interior lighting powerFAHAD FATEHenergy_progress
01/10/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/10/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/10/2024MeteringFAHAD FATEHenergy_progress
01/10/2024Exterior lighting powerFAHAD FATEHenergy_progress
01/10/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/10/2024Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/10/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/10/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/10/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/10/2024Interior lighting powerFAHAD FATEHenergy_progress
01/10/2024Fenestration air leakageFAHAD FATEHenergy_progress
01/10/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/10/2024Fenestration areasFAHAD FATEHenergy_progress
Latest 25 of 77.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026X08046464-I1Request digital key ↗
08/22/2026X08046464-P4Request digital key ↗
08/22/2026X08046464-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X08046464-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026X08046464-P4Open ↗
09/02/2026X08046464-P4Open ↗
08/30/2026X08046464-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026X08046464-P4Open ↗
08/30/2026X08046464-S1Open ↗
08/29/2026X08046464-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026X08046464-I1Open ↗
08/22/2026X08046464-S3Open ↗
08/22/2026X08046464-P3Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026X08046464-P3Open ↗
08/13/2026X08046464-I1Open ↗
08/13/2026X08046464-P6Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/22/2026X08046464-S2Open ↗
08/22/2026X08046464-I1Open ↗
08/22/2026X08046464-P3Open ↗
Showing 3 of 9 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/22/2026X08046464-I1Open ↗
08/22/2026X08046464-P3Open ↗
08/22/2026X08046464-P6Open ↗