Two family frame
3213 BARKER AVENUE
BRONX · BIN 2056164
💬 Discuss this project
1920Year Built
2.5Stories
B2Building Class
R5Zoning
2,758 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Two family frame · 6,365 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR109/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281109/03/2026
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Violation (5)Special Inspection (5)
09/11/2026
Permit issued — Solar
X01455333-I1-SL
09/03/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 29 modules, 12.615 KW
X01455333-I1
09/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
09/03/2026
Special inspection requirement — Final
Mina Makar
09/03/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
10/18/2024
Violation issued (HPD, open)
I
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, open)
A
10/17/2024
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR09/11/2026
1 project · most recent 09/03/2026
FiledStatusContractorScope
09/03/2026Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 09/03/2026
FiledStatusContractorScope
09/03/2026Permit IssuedMOMENTUM SOLAR58 panels, 25.22 kw, 510 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/03/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
09/03/2026Fire-Resistant Penetrations and JointsMina Makarspecial
09/03/2026Energy Code Compliance InspectionsMina Makarprogress
09/03/2026FinalMina Makarprogress
09/03/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/15/2026X01455333-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026X01455333-I1Open ↗
09/23/2026X01455333-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/14/2026X01455333-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026X01455333-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/14/2026X01455333-I1Open ↗