One family attached or semi-detached
3367 CAPUCHIN WAY
BRONX · BIN 2057024
💬 Discuss this project
1945Year Built
2Stories
A5Building Class
R4Zoning
928 sfGross Floor Area
1Units
One family attached or semi-detached · 1,520 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC106/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341106/10/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/01/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
X01238916-I1
06/25/2025
Permit issued — Solar
X01238916-I1-SL
06/10/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
X01238916-I1
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
06/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
06/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
06/10/2025
Special inspection requirement — Final
Michelle Contri
06/10/2025
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES06/25/2025
1 project · most recent 07/03/2025
FiledStatusContractorScope
07/03/2025CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/10/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
06/10/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
06/10/2025Energy Code Compliance InspectionsMichelle Contriprogress
06/10/2025FinalMichelle Contriprogress
06/10/2025Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026X01238916-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026X01238916-I1Open ↗
08/27/2026X01238916-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01238916-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026X01238916-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01238916-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01238916-I1Open ↗