← Back
Two family converted from one family
3644 BARNES AVENUE
BRONX · BIN 2058294
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R5Zoning
1,956 sfGross Floor Area
2Units
12 Open Violations ▸
Two family converted from one family · 3,795 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Roof2p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC208/12/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEORGE FEDERLINElectrical103/21/2026
VILLAGE ELECTL CONTRS INCElectrical103/22/2026
SOLAR CONTRACTING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854208/12/2025
Building Lifecycle
All (27)Filed (2)Permit Issued (1)Signed Off (1)Violation (13)Special Inspection (10)
04/27/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01261485-I1
10/10/2025
Permit issued — Solar
X01261485-I1-SL
08/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/22/2025
Special inspection requirement — Final
TOM PETERSEN
08/22/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/22/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
08/12/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01261485-P1
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/11/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/11/2025
Special inspection requirement — Final
TOM PETERSEN
08/11/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
07/28/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM.ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THENYC DEPARTMENT OF BUILDINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X01261485-I1
06/16/2016
Violation issued (HPD, open)
I
06/14/2016
Violation issued (HPD, open)
B
06/14/2016
Violation issued (HPD, open)
B
06/14/2016
Violation issued (HPD, closed)
C
06/14/2016
Violation issued (HPD, open)
B
06/14/2016
Violation issued (HPD, open)
B
06/14/2016
Violation issued (HPD, open)
B
06/14/2016
Violation issued (HPD, open)
B
05/31/2016
Violation issued (HPD, open)
B
05/31/2016
Violation issued (HPD, open)
B
05/31/2016
Violation issued (HPD, open)
B
05/31/2016
Violation issued (HPD, open)
A
05/31/2016
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC10/10/2025
BISOTISSUEDTRINITY SOLAR LLC09/22/2022
2 projects · most recent 01/14/2026
FiledStatusContractorScope
01/14/2026CompleteVILLAGE ELECTL CONTRS INC—
09/29/2022CancelledREDLINE ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/22/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/22/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/22/2025FinalTOM PETERSENprogress
08/22/2025Energy Code Compliance InspectionsTOM PETERSENprogress
08/22/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
08/11/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/11/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/11/2025Energy Code Compliance InspectionsTOM PETERSENprogress
08/11/2025FinalTOM PETERSENprogress
08/11/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026X01261485-P1Request digital key ↗
08/18/2026X01261485-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/20/2022240336542Open ↗
▸BISWORK PERMIT APPLICATION1
09/22/2022240336542Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X01261485-I1Open ↗
09/01/2026X01261485-I1Open ↗
09/01/2026X01261485-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X01261485-I1Open ↗
09/01/2026X01261485-I1Open ↗
08/26/2026X01261485-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026X01261485-I1Open ↗
08/18/2026X01261485-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/20/2022240336542Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/20/2022240336542Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/20/2022240336542Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/22/2022240336542Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026X01261485-I1Open ↗
08/18/2026X01261485-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/20/2022240336542Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/20/2022240336542Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/22/2022240336542Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/20/2022240336542Open ↗
▸BISNYCECC ANALYSIS1
09/20/2022240336542Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/20/2022240336542Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/22/2022240336542Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01261485-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/20/2022240336542Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/20/2022240336542Open ↗