← Back
Miscellaneous two family
3149 BAYCHESTER AVENUE
BRONX · BIN 2062225
💬 Discuss this project
1970Year Built
3Stories
B9Building Class
R5Zoning
3,060 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Miscellaneous two family · 3,000 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Basement1p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RCN803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN HUNG ARCHITECT505/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NH EXPEDITING AND CONSULTING LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
901 GREEN AVENUE BUILDERSGeneral Contractor303/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
Building Lifecycle
All (36)Filed (5)Permit Issued (2)Signed Off (2)Violation (22)Inspection (4)Special Inspection (1)
05/25/2023
Signed off — Alteration
APPLICATION FILED HEREWITH TO RESOLVE ECB VIOLATION #34957498Z AND #34957499K. WORK INCLUDES REMOVAL OF EXISTING PARTITIONS, WINDOWS, CAP & REMOVE GAS & PLUMBING FIXTURES. INSTALLATION OF NEW GARAGE DOOR TO RESTORE GARAGE AS PER PLAN.
X00679608-I1
05/18/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/04/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO RESOLVE ECB VIOLATION #34957498Z AND #34957499K. WORK INCLUDES REMOVAL OF EXISTING PARTITIONS, WINDOWS, CAP & REMOVE GAS & PLUMBING FIXTURES. INSTALLATION OF NEW GARAGE DOOR TO RESTORE GARAGE AS PER PLAN.
X00679608-P2
05/04/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/06/2022
Signed off — Alteration
APPLICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00679608 TO RESOLVE ECB VIOLATION #34957498Z AND #34957499K. WORK INCLUDES CAPPING AND REMOVAL OF GAS AND PLUMBING FIXTURES AS REQUIRED AND RESTORING TO PRIOR LEGAL CONDITIONS.
X00682603-I1
12/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/13/2022
Filed — Alteration
APPLICATION FILED HEREWITH TO RESOLVE ECB VIOLATION #34957498Z AND #34957499K. WORK INCLUDES REMOVAL OF EXISTING PARTITIONS, WINDOWS, CAP & REMOVE GAS & PLUMBING FIXTURES. INSTALLATION OF NEW GARAGE DOOR TO RESTORE GARAGE AS PER PLAN.
X00679608-P1
10/13/2022
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00679608 TO RESOLVE ECB VIOLATION #34957498Z AND #34957499K. WORK INCLUDES CAPPING AND REMOVAL OF GAS AND PLUMBING FIXTURES AS REQUIRED AND RESTORING TO PRIOR LEGAL CONDITIONS.
X00682603-P1
09/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/25/2022
Permit issued — Plumbing
X00682603-I1-PL
03/16/2022
Permit issued — General Construction
X00679608-I1-GC
02/25/2022
Filed — Alteration
APPLICATION FILED HEREWITH TO RESOLVE ECB VIOLATION #34957498Z AND #34957499K. WORK INCLUDES REMOVAL OF EXISTING PARTITIONS, WINDOWS, CAP & REMOVE GAS & PLUMBING FIXTURES. INSTALLATION OF NEW GARAGE DOOR TO RESTORE GARAGE AS PER PLAN.
X00679608-I1
02/25/2022
Filed — Alteration
APPLICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00679608 TO RESOLVE ECB VIOLATION #34957498Z AND #34957499K. WORK INCLUDES CAPPING AND REMOVAL OF GAS AND PLUMBING FIXTURES AS REQUIRED AND RESTORING TO PRIOR LEGAL CONDITIONS.
X00682603-I1
02/14/2022
Violation issued (HPD, closed)
B
02/14/2022
Violation issued (HPD, closed)
B
02/14/2022
Violation issued (HPD, closed)
B
02/14/2022
Violation issued (HPD, closed)
B
02/14/2022
Violation issued (HPD, closed)
B
02/14/2022
Violation issued (HPD, closed)
C
07/12/2021
Violation issued (HPD, open)
I
04/23/2021
Violation issued (HPD, open)
C
04/23/2021
Violation issued (HPD, closed)
B
04/23/2021
Violation issued (HPD, closed)
A
04/23/2021
Violation issued (HPD, closed)
B
04/23/2021
Violation issued (HPD, closed)
A
04/23/2021
Violation issued (HPD, closed)
A
04/23/2021
Violation issued (HPD, closed)
B
04/23/2021
Violation issued (HPD, closed)
B
04/23/2021
Violation issued (HPD, closed)
A
04/23/2021
Violation issued (HPD, closed)
B
04/23/2021
Violation issued (HPD, closed)
B
10/28/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/28/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/06/2013
Violation issued (ECB, closed)
Construction
08/06/2013
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT03/25/2022
DOB NOWGeneral ConstructionSigned-off901 GREEN AVENUE BUILDERS03/16/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/18/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/04/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/18/2022Fire-Resistance Rated ConstructionFAHAD FATEHprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026X00682603-P1Request digital key ↗
08/24/2026X00682603-I1Request digital key ↗
08/23/2026X00679608-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
03/28/2017240111794Open ↗
02/27/2017240111794Open ↗
11/18/2015240111794Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026X00682603-P1Open ↗
08/24/2026X00682603-I1Open ↗
08/23/2026X00679608-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/18/2015240111794Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026X00679608-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00682603-I1Open ↗
08/24/2026X00682603-P1Open ↗
08/23/2026X00679608-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/18/2015240111794Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/18/2015240111794Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/18/2015240111794Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/18/2015240111794Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/18/2015240111794Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2015240111794Open ↗
▸BISADDITIONAL INFORMATION1
12/07/2015240111794Open ↗