← Back
Primarily 5-6 family with 1 store or office
627 EAST 222 STREET
BRONX · BIN 2062901
💬 Discuss this project
1926Year Built
3Stories
S5Building Class
R6AZoning
4,988 sfGross Floor Area
7Units
Rent Stabilized58 Open Violations ▸
Primarily 5-6 family with 1 store or office · Owner of record: BRX 613 NY, LLC · 2,320 sf lot · 2.15 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 35p · 2 filings · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar8p · 2 filings · 20 docs
1 job · most recent 03/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/17/2026Signed-offKISHAN PLUMBING INCGas, Water/Sanitary
2 jobs · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025CompletePLATINUM PWR ELECTL CONTGeneral Wiring
10/14/2024CompletePLATINUM PWR ELECTL CONT—
Building Lifecycle
All (126)Filed (7)Permit Issued (4)Signed Off (3)Violation (60)Inspection (3)Objection (20)Special Inspection (29)
08/13/2026
Signed off — Alteration
PROPOSE INTERIOR RENOVATION WORKS FOR THE SEVEN APARTMENTS AT THE EXISTING 3-STORY MIXED-USE BUILDING AS PER PLAN. THE PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00909348-I1
08/13/2026
Signed off — Alteration
PROPOSE INTERIOR RENOVATION WORKS FOR THE SEVEN APARTMENTS AT THE EXISTING 3-STORY MIXED-USE BUILDING AS PER PLAN. THE PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00909348-S1
08/13/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION WORKS FOR THE SEVEN APARTMENTS AT THE EXISTING 3-STORY MIXED-USE BUILDING AS PER PLAN. THE GENERAL CONSTRUCTION WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00909349-I1
08/07/2026
Violation issued (HPD, open)
B
08/07/2026
Violation issued (HPD, open)
B
08/07/2026
Violation issued (HPD, open)
C
08/07/2026
Violation issued (HPD, open)
C
08/07/2026
Violation issued (HPD, open)
A
08/07/2026
Violation issued (HPD, open)
C
08/07/2026
Violation issued (HPD, open)
B
06/25/2026
Permit issued — Plumbing
X00909349-I1-PL
06/01/2026
Violation issued (HPD, open)
A
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
04/30/2026
Violation issued (HPD, closed)
A
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
VIJAY KUMAR
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
VIJAY KUMAR
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
VIJAY KUMAR
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
VIJAY KUMAR
03/23/2026
Special inspection requirement — Heating Systems
VIJAY KUMAR
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
VIJAY KUMAR
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
VIJAY KUMAR
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
VIJAY KUMAR
03/23/2026
Special inspection requirement — Maintenance information
VIJAY KUMAR
03/17/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORKS FOR THE SEVEN APARTMENTS AT THE EXISTING 3-STORY MIXED-USE BUILDING AS PER PLAN. THE GENERAL CONSTRUCTION WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00909349-P3
03/16/2026
Filed — Alteration
PROPOSE INTERIOR RENOVATION WORKS FOR THE SEVEN APARTMENTS AT THE EXISTING 3-STORY MIXED-USE BUILDING AS PER PLAN. THE PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00909348-P2
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
VIJAY KUMAR
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
VIJAY KUMAR
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
VIJAY KUMAR
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
VIJAY KUMAR
03/02/2026
Special inspection requirement — Heating Systems
VIJAY KUMAR
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
03/02/2026
Special inspection requirement — Maintenance information
VIJAY KUMAR
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
VIJAY KUMAR
01/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/21/2026
Permit issued — Boiler Equipment
X00909348-S1-BE
01/05/2026
Violation issued (HPD, closed)
A
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, open)
B
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, open)
C
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, open)
B
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2025
Violation issued (HPD, closed)
B
08/15/2025
Violation issued (HPD, closed)
B
08/15/2025
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
C
04/24/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION WORKS FOR THE SEVEN APARTMENTS AT THE EXISTING 3-STORY MIXED-USE BUILDING AS PER PLAN. THE PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00909348-S1
Latest 60 of 126 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
85 QUAY STREET1808/29/2026
BRX 613 NY, LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/08/2016$495K—627 EAST 222 CORP. → BRX 613 NY, LLC$99/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHI F. LAU ARCHITECT, P.C.503/17/2026
ALL CITY ENGINEERING, P.C.203/16/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KISHAN PLUMBING INCPlumbing707/08/2026
ORLO CONSTRUCTION LLCGeneral Contractor303/21/2026
GEORGE GRANDVILLEElectrical103/21/2026
GRANDVILLE GEORGEElectrical103/21/2026
PLATINUM PWR ELECTL CONTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ PROFESSIONAL ENGINEERI766703/17/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKISHAN PLUMBING INC06/25/2026
DOB NOWBoiler EquipmentSigned-offN AND S PLUMBING INC01/21/2026
DOB NOWPlumbingSigned-offN AND S PLUMBING INC12/18/2024
DOB NOWGeneral ConstructionSigned-offORLO CONSTRUCTION LLC09/23/2024
BISPLISSUEDPLBG P & H INC05/05/2017
BISOTISSUEDDOPPLER INNOVATIONS INC05/05/2017
BISEQISSUEDHARTFORD SERVICES LTD.11/03/1997
BISOTISSUEDHARTFORD SERVICES LTD.11/03/1997
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/06/2026Energy Code Compliance InspectionsVIJAY KUMARprogress
04/06/2026Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
04/06/2026Tenant Protection Plan ComplianceVIJAY KUMARspecial
04/06/2026HVAC-R and service water piping design and insulationVIJAY KUMARenergy_progress
03/23/2026Tenant Protection Plan ComplianceVIJAY KUMARspecial
03/23/2026Heating SystemsVIJAY KUMARspecial
03/23/2026Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
03/23/2026HVAC-R and service water heating system controlsVIJAY KUMARenergy_progress
03/23/2026HVAC-R and service water heating equipmentVIJAY KUMARenergy_progress
03/23/2026HVAC-R and service water piping design and insulationVIJAY KUMARenergy_progress
03/23/2026Maintenance informationVIJAY KUMARenergy_progress
03/11/2026Tenant Protection Plan Compliance—special
03/11/2026Tenant Protection Plan Compliance—special
03/09/2026HVAC-R and service water piping design and insulationVIJAY KUMARenergy_progress
03/09/2026Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
03/09/2026Energy Code Compliance InspectionsVIJAY KUMARprogress
03/02/2026HVAC-R and service water piping design and insulationVIJAY KUMARenergy_progress
03/02/2026HVAC-R and service water heating system controlsVIJAY KUMARenergy_progress
03/02/2026Heating SystemsVIJAY KUMARspecial
03/02/2026Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
03/02/2026Maintenance informationVIJAY KUMARenergy_progress
03/02/2026HVAC-R and service water heating equipmentVIJAY KUMARenergy_progress
03/11/2025FinalVIJAY KUMARprogress
03/11/2025Fenestration areasVIJAY KUMARenergy_progress
03/11/2025Fire-Resistance Rated ConstructionVIJAY KUMARprogress
Latest 25 of 29.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026X00909348-I1Contact architect ↗
08/20/2026X00909348-P2Contact architect ↗
08/20/2026X00909348-S1Contact architect ↗
Showing 3 of 7 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
10/27/2017220593766Open ↗
07/07/2017220593766Open ↗
04/27/2017220593766Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
05/05/2017220593766Open ↗
05/05/2017220593766Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/04/2017220593766Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature8
09/27/2026X00909348-S1Open ↗
09/01/2026X00909348-P2Open ↗
09/01/2026X00909349-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/27/2026X00909348-S1Open ↗
09/27/2026X00909348-S1Open ↗
09/01/2026X00909348-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026X00909348-I1Open ↗
08/20/2026X00909348-S1Open ↗
08/17/2026X00909349-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/04/2017220593766Open ↗
04/27/2017220593766Open ↗
05/24/2013220288686Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/27/2017220593766Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/27/2017220593766Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/27/2017220593766Open ↗
04/27/2017220593766Open ↗
▸BISSCHEDULE B - PLUMBING1
05/24/2013220288686Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
05/24/2013220288686Open ↗
▸BISTenant Protection Plan and Notes1
04/27/2017220593766Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/20/2026X00909348-I1Open ↗
08/20/2026X00909348-S1Open ↗
08/17/2026X00909349-P3Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/27/2017220593766Open ↗
05/24/2013220288686Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/04/2017220593766Open ↗
04/27/2017220593766Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/04/2017220593766Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/04/2017220593766Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/04/2017220593766Open ↗
04/27/2017220593766Open ↗
05/24/2013220288686Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
05/05/2017220593766Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
10/27/2017220593766Open ↗
07/07/2017220593766Open ↗
▸BISEFILING COVER SHEET2
04/27/2017220593766Open ↗
05/24/2013220288686Open ↗
▸BISBOROUGH INTAKE FORM1
12/04/2017220593766Open ↗