← Back
Miscellaneous two family
4044 BRONXWOOD AVENUE
BRONX · BIN 2064543
💬 Discuss this project
1950Year Built
2Stories
B9Building Class
R5DZoning
—Gross Floor Area
2Units
Miscellaneous two family · 0.52 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC108/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR CONTRACTING LLCGeneral Contractor109/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854108/28/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
09/17/2026
Permit issued — Solar
X01452856-I1-SL
08/28/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS
X01452856-I1
08/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/28/2026
Special inspection requirement — Final
TOM PETERSEN
08/28/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSOLAR CONTRACTING LLC09/17/2026
BIS—ISSUEDN/A03/22/1993
2 projects · most recent 08/28/2026
FiledStatusContractorScope
08/28/2026Permit IssuedSOLAR ELEC CONTRACTNG LLC1 meters
08/28/2026Permit IssuedSOLAR ELEC CONTRACTNG LLC1 meters
1 project · most recent 08/28/2026
FiledStatusContractorScope
08/28/2026Permit IssuedSOLAR CONTRACTING LLC17 panels, 7.4 kw, 934.76 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/28/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/28/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/28/2026Energy Code Compliance InspectionsTOM PETERSENprogress
08/28/2026FinalTOM PETERSENprogress
08/28/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/01/2026X01452856-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026X01452856-I1Open ↗
09/23/2026X01452856-I1Open ↗
09/23/2026X01452856-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026X01452856-I1Open ↗
09/23/2026X01452856-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/01/2026X01452856-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/01/2026X01452856-I1Open ↗