1291 EAST 223 STREET
BRONX · BIN 2065730
💬 Discuss this project
1975Year Built
3Stories
C0Building Class
R5Zoning
3,232 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 3,400 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 2 filings · 20 docs
Floor 11p · 2 filings · 20 docs
Cellar1p · 1 filing · 6 docs
Nothing on file for this building.
Building Lifecycle
All (63)Filed (7)Permit Issued (6)Signed Off (3)Violation (11)Inspection (5)Objection (19)Special Inspection (12)
02/03/2026
Signed off — Alteration
OIL TO GAS CONVERSION. INSTALL 4 NEW GAS BOILERS AND 4 NEW GAS HOT WATER HEATERS AT CELLAR. INSTALL NEW FLOOR DRAINS. INSTALL ASSOCIATED VENT AND PIPING. INSTALL NEW GAS METERS AND PIPING AS REQUIRED. INSTALL NEW PLUMBING FIXTURES AS PER PLAN.
X00586833-I1
02/03/2026
Signed off — Alteration
X01283137-I1
01/22/2026
Signed off — Alteration
X00586831-I1
12/22/2025
Permit issued — Mechanical Systems
X01283137-I1-MS
12/22/2025
Permit issued — General Construction
X01283137-I1-GC
10/24/2025
Filed — Alteration
X01283137-I1
09/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/09/2025
Permit issued — Plumbing
X00586833-I1-PL
09/06/2025
Special inspection requirement — Mechanical Systems
SYLVESTER YAVANA
09/06/2025
Special inspection requirement — Final
SYLVESTER YAVANA
09/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYLVESTER YAVANA
09/04/2025
Objection raised — Cost
09/04/2025
Objection raised — Scope
09/04/2025
Objection resolved — Resolved
08/18/2025
Filed — Alteration
OIL TO GAS CONVERSION. INSTALL 4 NEW GAS BOILERS AND 4 NEW GAS HOT WATER HEATERS AT CELLAR. INSTALL NEW FLOOR DRAINS. INSTALL ASSOCIATED VENT AND PIPING. INSTALL NEW GAS METERS AND PIPING AS REQUIRED. INSTALL NEW PLUMBING FIXTURES AS PER PLAN.
X00586833-P2
08/06/2025
Permit issued — General Construction
X00586831-I1-GC
08/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
SYLVESTER YAVANA
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
SYLVESTER YAVANA
08/06/2025
Special inspection requirement — Maintenance information
SYLVESTER YAVANA
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SYLVESTER YAVANA
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYLVESTER YAVANA
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
SYLVESTER YAVANA
06/05/2025
Violation issued (HPD, closed)
A
12/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/29/2024
Objection resolved — Addressed
11/26/2024
Objection raised — Other
11/25/2024
Filed — Alteration
OIL TO GAS CONVERSION. INSTALL 4 NEW GAS BOILERS AND 4 NEW GAS HOT WATER HEATERS AT CELLAR. INSTALL NEW FLOOR DRAINS. INSTALL ASSOCIATED VENT AND PIPING. INSTALL NEW GAS METERS AND PIPING AS REQUIRED. INSTALL NEW PLUMBING FIXTURES AS PER PLAN.
X00586833-P1
09/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/24/2024
Permit issued — Plumbing
X00586833-I1-PL
04/02/2024
Violation issued (HPD, closed)
A
11/16/2023
Violation issued (HPD, closed)
I
03/16/2023
Violation issued (HPD, closed)
A
12/15/2022
Objection raised — Other
12/15/2022
Objection resolved — Resolved
12/07/2022
Filed — Alteration
INSTALL 4 NEW GAS BOILERS AT CELLAR LEVEL.
X08002877-I1
10/27/2022
Objection raised — Scope
10/27/2022
Objection resolved — Resolved
10/19/2022
Filed — Alteration
RENOVATE EXISTING BOILER ROOM. INTERIOR RENOVATION OF EXISTING RECREATIONAL SPACE. INSTALL NEW PRTITION AS PER PLAN. NO CHANGE IN OCCUPANCY OR EGRESS.
X00586838-I1
10/08/2022
Special inspection requirement — Heating Systems
SYLVESTER YAVANA
10/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYLVESTER YAVANA
10/02/2022
Objection resolved — Addressed
10/01/2022
Objection resolved — Addressed
09/26/2022
Objection resolved — Addressed
09/26/2022
Objection resolved — Addressed
09/24/2022
Objection resolved — Addressed
08/17/2022
Objection raised — Scope
08/17/2022
Objection raised — Admin
08/17/2022
Objection raised — Admin
08/17/2022
Objection raised — Structural
08/17/2022
Objection raised — Mechanical
08/12/2022
Filed — Alteration
OIL TO GAS CONVERSION. INSTALL 4 NEW GAS BOILERS AND 4 NEW GAS HOT WATER HEATERS AT CELLAR. INSTALL NEW FLOOR DRAINS. INSTALL ASSOCIATED VENT AND PIPING. INSTALL NEW GAS METERS AND PIPING AS REQUIRED. INSTALL NEW PLUMBING FIXTURES AS PER PLAN.
X00586833-I1
05/17/2022
Permit issued — General Construction
X00586831-I1-GC
02/17/2022
Violation issued (HPD, closed)
A
02/17/2022
Violation issued (HPD, closed)
I
12/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/15/2021
Filed — Alteration
X00586831-I1
04/02/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
Latest 60 of 63 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/30/2014$570K—— → —$176/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYLVESTER R. YAVANA, ARCHITECT710/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY CONSULTANT ENGINEERING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PM MECHANICAL GROUP CORPGeneral Contractor204/09/2026
SPACIOUS LIVING GP LLCGeneral Contractor207/08/2026
SAMUEL & SONS P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYLVESTER R. YAVANA, ARCH9053510/24/2025
JACOBSON SHINODA ARCHITEC7884111/15/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPM MECHANICAL GROUP CORP12/22/2025
DOB NOWGeneral ConstructionSigned-offPM MECHANICAL GROUP CORP12/22/2025
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC09/09/2025
DOB NOWGeneral ConstructionSigned-offSPACIOUS LIVING GP LLC08/06/2025
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC05/24/2024
DOB NOWGeneral ConstructionSigned-offSPACIOUS LIVING GP LLC05/17/2022
BIS—ISSUEDNAUFFAL04/27/2001
BISPLISSUEDCASA MECHANICAL CO. INC04/27/2001
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/06/2025Mechanical SystemsSYLVESTER YAVANAspecial
09/06/2025FinalSYLVESTER YAVANAprogress
09/06/2025Fire-Resistant Penetrations and JointsSYLVESTER YAVANAspecial
08/06/2025HVAC-R and service water heating equipmentSYLVESTER YAVANAenergy_progress
08/06/2025HVAC-R and service water heating system controlsSYLVESTER YAVANAenergy_progress
08/06/2025Maintenance informationSYLVESTER YAVANAenergy_progress
08/06/2025HVAC-R and service water piping design and insulationSYLVESTER YAVANAenergy_progress
08/06/2025Fire-Resistant Penetrations and JointsSYLVESTER YAVANAspecial
08/06/2025Energy Code Compliance InspectionsSYLVESTER YAVANAprogress
10/08/2022Heating SystemsSYLVESTER YAVANAspecial
10/08/2022Fire-Resistant Penetrations and JointsSYLVESTER YAVANAspecial
12/09/2021Fire-Resistant Penetrations and Joints—special
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026X00586831-I1Request digital key ↗
08/24/2026X00586833-P2Request digital key ↗
08/23/2026X08002877-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00586831-I1Open ↗
08/24/2026X00586833-I1Open ↗
08/24/2026X00586833-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/23/2026X01283137-I1Open ↗
08/23/2026X00586833-P2Open ↗
08/23/2026X00586833-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026X01283137-I1Open ↗
08/23/2026X01283137-I1Open ↗
08/23/2026X00586833-P2Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026X00586831-I1Open ↗
08/24/2026X00586833-P2Open ↗
08/23/2026X08002877-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00586831-I1Open ↗
08/13/2026X00586833-I1Open ↗