| Owner | Filings | Most Recent |
|---|---|---|
| GHM PROPERTY GROUP | 2 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 11/12/2025 | $685K | — | Private party → Private party | $639/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| MEHDI GHAZI, P.E., P.C. | 4 | 07/20/2026 |
| MEI ARCHITECT PLLC | 1 | 06/02/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| ALPHA HOME DESIGN LLC | 2 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/20/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Gree MULTI24HP230V1E0 23,200 BTU · Heat Pump Outdoor ×4 MULTI36HP230V1E0 34,000 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/20/2026 | — | — | Steel, Masonry, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/15/2026 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/13/2026 | Concrete - Cast-In-Place | — | special |
| 07/13/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 07/13/2026 | Subgrade Inspections | — | special |
| 07/13/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 07/13/2026 | Final | — | progress |
| 07/13/2026 | Footing and Foundation | — | progress |
| 07/13/2026 | Masonry | — | special |
| 07/13/2026 | Structural Cold-Formed Steel | — | special |
| 07/13/2026 | Structural Steel - Details | — | special |
| 07/13/2026 | Wood – Seismic Resistance | — | special |
| 07/13/2026 | Structural Wood Frame | — | progress |
| 07/13/2026 | Final | — | progress |
| 05/26/2026 | Ventilation and air distribution system | — | energy_progress |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/26/2026 | Heating Systems | — | special |
| 05/26/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 05/26/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 05/26/2026 | Interior lighting power | — | energy_progress |
| 05/26/2026 | Energy Code Compliance Inspections | — | progress |
| 05/26/2026 | Fire-Resistance Rated Construction | — | progress |
| 05/26/2026 | Insulation placement and R values | — | energy_progress |
| 05/26/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/26/2026 | Fenestration air leakage | — | energy_progress |
| 05/26/2026 | Air barrier — testing | — | energy_progress |
| 05/26/2026 | Maintenance information | — | energy_progress |