← Back
Two family frame
4025 EDSON AVENUE
BRONX · BIN 2067488
💬 Discuss this project
1914Year Built
2Stories
B2Building Class
R4-1Zoning
1,968 sfGross Floor Area
2Units
31 Open Violations ▸FDNY Report ↗
Two family frame · 2,500 sf lot · 0.79 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2022$655K—— → —$333/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUPERIOR HOME INSPECTION SERVICES204/04/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SUPERIOR - HOME INSPECTIO1804204/04/2023
Building Lifecycle
All (44)Filed (2)Permit Issued (1)Violation (33)Inspection (4)Objection (2)Special Inspection (2)
10/28/2025
Violation issued (HPD, open)
I
10/27/2025
Violation issued (HPD, open)
C
10/27/2025
Violation issued (HPD, open)
C
10/24/2025
Violation issued (HPD, open)
B
10/24/2025
Violation issued (HPD, open)
B
10/24/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, open)
B
12/05/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/24/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/27/2023
Permit issued — Plumbing
X08052954-I1-PL
04/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
04/04/2023
Filed — Alteration
IN CELLAR, REPL. OIL BOILER W/1 NEW GAS BOILER & INSTALL 1 NEW GAS FIRED BOILER. REPL. 1 HWH & INSTALL 1 NEW HWH W/ALL NEW ASSOCIATED GAS PIPING. REPL. TWO 3/4" METER BARS W/1-1/4" BARS & REPL. BOTH GAS METERS. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
X08052954-P1
04/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Williams
02/01/2023
Objection raised — Scope
02/01/2023
Objection resolved — Addressed
01/27/2023
Filed — Alteration
IN CELLAR, REPL. OIL BOILER W/1 NEW GAS BOILER & INSTALL 1 NEW GAS FIRED BOILER. REPL. 1 HWH & INSTALL 1 NEW HWH W/ALL NEW ASSOCIATED GAS PIPING. REPL. TWO 3/4" METER BARS W/1-1/4" BARS & REPL. BOTH GAS METERS. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
X08052954-I1
02/19/2019
Violation issued (HPD, open)
I
02/14/2019
Violation issued (HPD, open)
C
02/14/2019
Violation issued (HPD, open)
C
02/14/2019
Violation issued (HPD, open)
B
02/14/2019
Violation issued (HPD, closed)
C
02/14/2019
Violation issued (HPD, open)
B
02/02/2019
Violation issued (HPD, open)
B
11/18/2017
Violation issued (HPD, open)
B
11/18/2017
Violation issued (HPD, closed)
C
11/18/2017
Violation issued (HPD, closed)
C
11/18/2017
Violation issued (HPD, open)
C
11/18/2017
Violation issued (HPD, open)
B
11/18/2017
Violation issued (HPD, open)
B
11/18/2017
Violation issued (HPD, open)
B
11/18/2017
Violation issued (HPD, open)
A
11/13/2017
Violation issued (HPD, open)
I
11/09/2017
Violation issued (HPD, open)
B
11/09/2017
Violation issued (HPD, open)
B
11/09/2017
Violation issued (HPD, open)
B
11/09/2017
Violation issued (HPD, open)
B
11/09/2017
Violation issued (HPD, closed)
C
08/17/2007
Violation issued (HPD, open)
B
05/16/2007
Violation issued (ECB, closed)
Quality of Life
05/16/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING04/27/2023
1 project · most recent 04/04/2023
Gas
FiledStatusContractorScope
04/04/2023Permit IssuedM & M PIPING AND HEATINGGas
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/05/2023Fail-Final CND-Occupancy InspectionFailView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
04/14/2023Fire-Resistant Penetrations and JointsSteven Williamsspecial
04/04/2023Fire-Resistant Penetrations and JointsSteven Williamsspecial
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026X08052954-P1Request digital key ↗
08/14/2026X08052954-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026X08052954-P1Open ↗
08/23/2026X08052954-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026X08052954-P1Open ↗
08/25/2026X08052954-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X08052954-P1Open ↗
08/14/2026X08052954-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X08052954-P1Open ↗