← Back
Four families
4170 WILDER AVENUE
BRONX · BIN 2069217
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R4-1Zoning
3,000 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Four families · 8,018 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY107/21/2025
RMM DESIGN STUDIO106/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN AND CONSULTING LLC203/21/2026
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR PRO INCGeneral Contractor303/21/2026
RIVERTOWN SOLAR LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES A CLANCY9176107/21/2025
WORLD DESIGN ARCHITECTURE9323106/20/2025
Building Lifecycle
All (52)Filed (2)Permit Issued (2)Signed Off (1)Violation (42)Special Inspection (5)
04/30/2026
Violation issued (HPD, closed)
A
03/17/2026
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01258017-I1
08/01/2025
Permit issued — Solar
X01258017-I1-SL
07/21/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
X01258017-I1
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Clancy
07/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Clancy
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
07/18/2025
Special inspection requirement — Final
James Clancy
07/18/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
06/24/2025
Permit issued — Solar
X01244579-I1-SL
06/20/2025
Filed — Alteration
X01244579-I1
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
03/17/2023
Violation issued (HPD, closed)
A
11/13/2022
Violation issued (HPD, closed)
C
11/13/2022
Violation issued (HPD, closed)
B
11/13/2022
Violation issued (HPD, closed)
A
11/13/2022
Violation issued (HPD, closed)
A
11/13/2022
Violation issued (HPD, closed)
A
11/13/2022
Violation issued (HPD, closed)
A
11/13/2022
Violation issued (HPD, closed)
B
11/13/2022
Violation issued (HPD, closed)
B
11/13/2022
Violation issued (HPD, closed)
B
11/13/2022
Violation issued (HPD, closed)
A
11/13/2022
Violation issued (HPD, closed)
A
11/13/2022
Violation issued (HPD, closed)
A
06/30/2022
Violation issued (HPD, closed)
B
06/30/2022
Violation issued (HPD, closed)
C
06/30/2022
Violation issued (HPD, closed)
A
06/30/2022
Violation issued (HPD, closed)
B
06/30/2022
Violation issued (HPD, closed)
B
06/30/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
C
06/29/2022
Violation issued (HPD, closed)
C
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
B
06/29/2022
Violation issued (HPD, closed)
B
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
10/12/2018
Violation issued (HPD, closed)
I
05/17/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/17/2017
Violation issued (ECB, closed)
Construction
02/17/2017
Violation issued (ECB, closed)
Plumbing
02/17/2017
Violation issued (ECB, closed)
Plumbing
02/01/2017
Violation issued (HPD, closed)
C
02/01/2017
Violation issued (HPD, closed)
C
02/01/2017
Violation issued (HPD, closed)
C
02/01/2017
Violation issued (HPD, closed)
C
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offRIVERTOWN SOLAR LLC08/01/2025
DOB NOWSolarPermit IssuedSOLAR PRO INC06/24/2025
BISBLISSUEDUNFLAT & PEROTTO ASSOCIATES09/27/1999
BISPLISSUEDUNFLAT & PEROTTO ASSOCIATES09/24/1999
2 projects · most recent 09/19/2025
FiledStatusContractorScope
09/19/2025CompleteAMBER ELECTL CONTNG INC—
06/16/2025Permit IssuedFLOW STATE ELECTRIC, LLC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/18/2025Fire-Resistant Penetrations and JointsJames Clancyspecial
07/18/2025Structural Stability – Alterations of existing buildingsJames Clancyspecial
07/18/2025Energy Code Compliance InspectionsJames Clancyprogress
07/18/2025FinalJames Clancyprogress
07/18/2025Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026X01244579-I1Request digital key ↗
08/18/2026X01258017-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026X01244579-I1Open ↗
08/13/2026X01258017-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/19/2026X01258017-I1Open ↗
09/19/2026X01258017-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/19/2026X01258017-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026X01244579-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01258017-I1Open ↗