← Back
One family attached or semi-detached
660 EAST 241 STREET
BRONX · Wakefield-Woodlawn · BIN 2071084
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R5Zoning
1,224 sfGross Floor Area
1Units
One family attached or semi-detached · 1,350 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof3p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR107/07/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475107/07/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Objection (2)Special Inspection (5)
08/05/2025
Permit issued — Solar
X01251740-I1-SL
07/24/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Scope
07/07/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
X01251740-I1
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
07/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
07/07/2025
Special inspection requirement — Final
Andres Arias Londono
07/07/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedCENTURION SOLAR ENERGY08/05/2025
1 project · most recent 07/01/2025
FiledStatusContractorScope
07/01/2025Permit IssuedBERGER QUALITY ELEC'L CON—
1 project · most recent 07/07/2025
FiledStatusContractorScope
07/07/2025Permit IssuedCENTURION SOLAR ENERGY9 panels, 3.82 kw, 189.17 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/07/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
07/07/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
07/07/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
07/07/2025FinalAndres Arias Londonoprogress
07/07/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026X01251740-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026X01251740-I1Open ↗
09/02/2026X01251740-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026X01251740-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026X01251740-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026X01251740-I1Open ↗