← Back
Single or multiple dwelling with stores or offices
3394 EAST TREMONT AVENUE
BRONX · BIN 2072586
💬 Discuss this project
1936Year Built
2Stories
S9Building Class
R6AZoning
4,500 sfGross Floor Area
4Units
6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: JONMARK REALTY GROUP LLC · 4,952 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
Architecture
Floor 14p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IC BEAUTY STUDIO907/08/2026
JON MARK REALTY GROUP LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2017$750K—BROSCO DEVELOPMENT LLC → JONMARK REALTY GROUP LLC$167/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANKLYN ESTRELLA ARCHITECT PLLC502/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANKLYN ESTRELLA ARCHITECT PLLC503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SYMMETRICAL CONSTRUC CORPGeneral Contractor403/21/2026
HT PLUMBING & HEATING CORPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WGC SOLUTIONS4673202/28/2023
AA BUILDING & INSPECTION1519202/14/2023
Building Lifecycle
All (40)Filed (5)Permit Issued (3)Violation (8)Inspection (8)Objection (10)Special Inspection (6)
09/18/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/12/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE CLARKE
03/01/2023
Special inspection requirement — Energy Code Compliance Inspections
WAYNE CLARKE
02/28/2023
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING STORE TO INSTALL NEW BEAUTY STUDIO, NEW PARTITION, NEW PLUMBING FIXTURES, REPAIR STORE FRONT AND INSTALL NEW AWNING. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00794591-P2
02/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE CLARKE
02/24/2023
Special inspection requirement — Energy Code Compliance Inspections
WAYNE CLARKE
02/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
02/14/2023
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING STORE TO INSTALL NEW BEAUTY STUDIO, NEW PARTITION, NEW PLUMBING FIXTURES, REPAIR STORE FRONT AND INSTALL NEW AWNING. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00794591-P1
01/17/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/03/2023
Permit issued — Plumbing
X00794591-S1-PL
12/30/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/30/2022
Objection raised — Scope
11/30/2022
Objection resolved — Addressed
11/28/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/21/2022
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING STORE TO INSTALL NEW BEAUTY STUDIO, NEW PARTITION, NEW PLUMBING FIXTURES, REPAIR STORE FRONT AND INSTALL NEW AWNING. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00794591-S1
11/18/2022
Permit issued — General Construction
X00794591-I1-GC
11/16/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/09/2022
Permit issued — Construction Fence
X00797738-I1-FN
08/31/2022
Objection raised — Accessibility
08/31/2022
Objection resolved — Addressed
08/31/2022
Objection raised — Fire_Protection
08/31/2022
Objection resolved — Addressed
08/31/2022
Objection raised — Scope
08/31/2022
Objection resolved — Addressed
08/31/2022
Objection raised — Fire_Protection
08/31/2022
Objection resolved — Addressed
08/29/2022
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING STORE TO INSTALL NEW BEAUTY STUDIO, NEW PARTITION, NEW PLUMBING FIXTURES, REPAIR STORE FRONT AND INSTALL NEW AWNING. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00794591-I1
08/29/2022
Filed — Alteration
X00797738-I1
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2017
Violation issued (ECB, open)
Boilers
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR01/03/2023
DOB NOWGeneral ConstructionPermit IssuedSYMMETRICAL CONSTRUC CORP11/18/2022
DOB NOWConstruction FencePermit IssuedSYMMETRICAL CONSTRUC CORP11/09/2022
BISBLISSUEDBUDGET PLBG & HTG LLC10/19/2018
BISPLISSUEDBUDGET PLBG & HTG LLC05/29/2018
BISOTISSUEDBUDGET PLUMBING & HEATING05/29/2018
BISOTISSUEDPETER-GEORGE DEVELOPMENT10/31/2005
BISEQISSUEDCOLGATE SCAFFOLDING & EQUIPMENT09/28/2005
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD03/03/2005
1 project · most recent 02/28/2023
Water/Sanitary
FiledStatusContractorScope
02/28/2023Signed-offHT PLUMBING & HEATING CORWater/Sanitary
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/18/2023Fail-Final General Construction Non-Directive 14FailView ↗
07/12/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/28/2022Fail-Final CND-Occupancy InspectionFailView ↗
11/16/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/01/2023Fire-Resistant Penetrations and JointsWAYNE CLARKEspecial
03/01/2023Energy Code Compliance InspectionsWAYNE CLARKEprogress
02/24/2023Fire-Resistant Penetrations and JointsWAYNE CLARKEspecial
02/24/2023Energy Code Compliance InspectionsWAYNE CLARKEprogress
02/21/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
01/17/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00797738-I1Request digital key ↗
08/23/2026X00794591-P4Request digital key ↗
08/23/2026X00794591-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
07/11/2023220651809Open ↗
06/29/2023220651809Open ↗
06/22/2023220651809Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
10/22/2018220651809Open ↗
05/29/2018220651809Open ↗
05/29/2018220651809Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00797738-I1Open ↗
08/23/2026X00794591-P4Open ↗
08/23/2026X00794591-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/29/2026X00794591-S1Open ↗
09/02/2026X00794591-P1Open ↗
08/26/2026X00794591-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026X00794591-P2Open ↗
08/24/2026X00794591-P3Open ↗
08/24/2026X00794591-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/29/2018220651809Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/29/2018220651809Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/29/2018220651809Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/31/2018220651809Open ↗
05/29/2018220651809Open ↗
▸BISSCHEDULE B - PLUMBING2
07/11/2023220651809Open ↗
06/29/2023220651809Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/11/2023220651809Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/11/2023220651809Open ↗
▸BISHEATING SYSTEMS1
12/11/2023220651809Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/29/2018220651809Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026X00794591-P3Open ↗
08/23/2026X00794591-P4Open ↗
08/23/2026X00794591-P2Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/29/2018220651809Open ↗
▸Energy Compliance4
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/13/2023220651809Open ↗
▸BIS* HVAC INSULATION AND SEALING1
12/11/2023220651809Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2023220651809Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/29/2018220651809Open ↗
▸Inspections & Test Reports2
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/11/2023220651809Open ↗
▸BISMECHANICAL SYSTEMS1
12/11/2023220651809Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/07/2023220651809Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
05/29/2018220651809Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/15/2023220651809Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
07/11/2023220651809Open ↗
10/31/2018220651809Open ↗
▸BISEFILING COVER SHEET1
05/29/2018220651809Open ↗