← Back
Two family frame
1031 HOLLYWOOD AVENUE
BRONX · BIN 2076484
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R3AZoning
2,084 sfGross Floor Area
2Units
Two family frame · 4,191 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
2 jobs · most recent 10/04/2022
General Wiring
FiledStatusContractorScope
10/04/2022CompleteLANO ELECTRIC COMPANY INCGeneral Wiring
01/06/2022CompleteCURRENT MECHS ELEC CONTS2 meters
Building Lifecycle
All (66)Filed (7)Permit Issued (7)Signed Off (5)Inspection (9)Objection (8)Special Inspection (30)
01/23/2025
Signed off — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-I1
01/09/2025
Signed off — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-S4
08/16/2024
Signed off — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-S3
08/13/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/09/2024
Signed off — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-S1
08/08/2024
Signed off — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-S2
08/02/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/06/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2024
Permit issued — General Construction
X00687085-S3-GC
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
09/05/2023
Special inspection requirement — Energy Code Compliance Inspections
GINO LONGO
08/31/2023
Filed — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-P2
08/31/2023
Filed — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-P1
08/31/2023
Special inspection requirement — Structural Wood Frame
GINO LONGO
08/31/2023
Special inspection requirement — Final
GINO LONGO
08/31/2023
Special inspection requirement — Fire-Resistance Rated Construction
GINO LONGO
08/31/2023
Special inspection requirement — Interior lighting power
GINO LONGO
08/31/2023
Special inspection requirement — Insulation placement and R values
GINO LONGO
08/31/2023
Special inspection requirement — Fenestration areas
GINO LONGO
08/31/2023
Special inspection requirement — Air barrier - visual inspection
GINO LONGO
08/31/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GINO LONGO
08/31/2023
Special inspection requirement — Fenestration air leakage
GINO LONGO
08/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GINO LONGO
08/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
08/18/2023
Objection raised — Zoning
08/18/2023
Objection resolved — Addressed
08/18/2023
Objection raised — Other
08/18/2023
Objection resolved — Addressed
08/18/2023
Special inspection requirement — Final
GINO LONGO
08/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GINO LONGO
08/18/2023
Special inspection requirement — Interior lighting power
GINO LONGO
08/18/2023
Special inspection requirement — Insulation placement and R values
GINO LONGO
08/18/2023
Special inspection requirement — Fenestration air leakage
GINO LONGO
08/18/2023
Special inspection requirement — Fenestration areas
GINO LONGO
08/18/2023
Special inspection requirement — Air barrier - visual inspection
GINO LONGO
08/18/2023
Special inspection requirement — Structural Wood Frame
GINO LONGO
08/18/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GINO LONGO
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GINO LONGO
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
GINO LONGO
08/10/2023
Permit issued — Plumbing
X00687085-S2-PL
08/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/26/2023
Permit issued — Plumbing
X00687085-S1-PL
07/26/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/14/2023
Permit issued — General Construction
X00687085-S4-GC-CX
05/08/2023
Objection raised — Other
05/08/2023
Objection resolved — Addressed
02/28/2023
Permit issued — General Construction
X00687085-S4-GC-CX
02/22/2023
Filed — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-S4
02/01/2023
Objection raised — Scope
02/01/2023
Objection resolved — Addressed
01/26/2023
Filed — Alteration
THIS SUBSEQUENT FILING IS FOR "NEW WORK", NOT ADDITIONAL WORK, WHICH WAS COVERED IN THE INITIAL FILING X00687085-I1. INITIAL AND SUBSEQUENT FILINGS WERE FILED AS LEGALIZATIONS. FILING FEES FOR THIS WORK HAVE ALREADY BEEN PAID IN THE INITIAL FILING.
X00687085-S3
01/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
07/20/2022
Permit issued — Plumbing
X00687085-S1-PL
07/07/2022
Permit issued — Structural
X00687085-I1-GC-CX
06/02/2022
Special inspection requirement — Structural Wood Frame
GINO LONGO
Latest 60 of 66 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/20/2017$669K—Private party → Private party$321/sf building
08/12/2015$478K—— → —$229/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT708/31/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEGA CONSTRUCTION CORPGeneral Contractor507/08/2026
BUDGET PLBG & HTG LLCPlumbing307/08/2026
LANO ELECTRIC COMPANY INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331708/31/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDEGA CONSTRUCTION CORP03/28/2024
DOB NOWPlumbingSigned-offBUDGET PLBG & HTG LLC08/10/2023
DOB NOWPlumbingSigned-offBUDGET PLBG & HTG LLC07/26/2023
DOB NOWGeneral ConstructionSigned-offDEGA CONSTRUCTION CORP06/14/2023
DOB NOWGeneral ConstructionSigned-offDEGA CONSTRUCTION CORP02/28/2023
DOB NOWPlumbingSigned-offBUDGET PLBG & HTG LLC07/20/2022
DOB NOWStructuralSigned-offDEGA CONSTRUCTION CORP07/07/2022
BISOTISSUEDCITYWIDE GENERAL CONSTRUC12/09/2014
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/13/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/02/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
09/05/2023Fire-Resistant Penetrations and JointsGINO LONGOspecial
09/05/2023Energy Code Compliance InspectionsGINO LONGOprogress
08/31/2023Structural Wood FrameGINO LONGOprogress
08/31/2023FinalGINO LONGOprogress
08/31/2023Fire-Resistance Rated ConstructionGINO LONGOprogress
08/31/2023Interior lighting powerGINO LONGOenergy_progress
08/31/2023Insulation placement and R valuesGINO LONGOenergy_progress
08/31/2023Fenestration areasGINO LONGOenergy_progress
08/31/2023Air barrier - visual inspectionGINO LONGOenergy_progress
08/31/2023Fenestration and door U-factor and product ratingsGINO LONGOenergy_progress
08/31/2023Fenestration air leakageGINO LONGOenergy_progress
08/31/2023Structural Stability – Alterations of existing buildingsGINO LONGOspecial
08/31/2023Fire-Resistant Penetrations and JointsGINO LONGOspecial
08/18/2023FinalGINO LONGOprogress
08/18/2023Fenestration and door U-factor and product ratingsGINO LONGOenergy_progress
08/18/2023Interior lighting powerGINO LONGOenergy_progress
08/18/2023Insulation placement and R valuesGINO LONGOenergy_progress
08/18/2023Fenestration air leakageGINO LONGOenergy_progress
08/18/2023Fenestration areasGINO LONGOenergy_progress
08/18/2023Air barrier - visual inspectionGINO LONGOenergy_progress
08/18/2023Structural Wood FrameGINO LONGOprogress
08/18/2023Construction Operations Influencing Adjacent StructuresGINO LONGOspecial
08/18/2023Fire-Resistant Penetrations and JointsGINO LONGOspecial
08/18/2023Structural Stability – Alterations of existing buildingsGINO LONGOspecial
08/18/2023Fire-Resistance Rated ConstructionGINO LONGOprogress
Latest 25 of 36.
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00687085-S4Request digital key ↗
08/24/2026X00687085-S2Request digital key ↗
08/24/2026X00687085-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/29/2014240075208Open ↗
▸BISWORK PERMIT APPLICATION1
12/10/2014240075208Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 16
08/24/2026X00687085-S4Open ↗
08/24/2026X00687085-S1Open ↗
08/13/2026X00687085-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026X00687085-S3Open ↗
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature27
09/02/2026X00687085-I1Open ↗
09/02/2026X00687085-I1Open ↗
09/02/2026X00687085-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026X00687085-I1Open ↗
09/02/2026X00687085-I1Open ↗
08/28/2026X00687085-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00687085-S1Open ↗
08/24/2026X00687085-S4Open ↗
08/13/2026X00687085-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/22/2017240075208Open ↗
09/22/2017240075208Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/29/2014240075208Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026X00687085-S4Open ↗
08/24/2026X00687085-S1Open ↗
08/13/2026X00687085-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00687085-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/28/2014240075208Open ↗
11/20/2014240075208Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/22/2017240075208Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
09/22/2017240075208Open ↗
10/29/2014240075208Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
12/10/2014240075208Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
12/01/2014240075208Open ↗
11/28/2014240075208Open ↗
11/07/2014240075208Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/29/2014240075208Open ↗
▸BISBOROUGH INTAKE FORM1
09/22/2017240075208Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026X00687085-S3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X00687085-S3Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X00687085-S3Open ↗