Two family brick
2613 HARDING AVENUE
BRONX · BIN 2081531
💬 Discuss this project
1965Year Built
2Stories
B1Building Class
R3-2Zoning
1,974 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸
Two family brick · 2,723 sf lot · 0.72 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT201/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNR ELECTRIC INCORPORATEElectrical103/22/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331201/09/2023
Building Lifecycle
All (40)Filed (2)Permit Issued (1)Signed Off (1)Violation (20)Inspection (2)Objection (8)Special Inspection (6)
07/30/2026
Signed off — Alteration
NEW PLUMBING WORK FILED FOR CAP AND REMOVAL OF GAS DRYER AND INSTALLATION OF A NEW COMBI-BOILER AT CELLAR FLOOR LEVEL. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00761236-I1
03/24/2026
Violation issued (HPD, closed)
B
03/24/2026
Violation issued (HPD, closed)
B
11/24/2025
Violation issued (HPD, closed)
I
01/09/2023
Filed — Alteration
NEW PLUMBING WORK FILED FOR CAP AND REMOVAL OF GAS DRYER AND INSTALLATION OF A NEW COMBI-BOILER AT CELLAR FLOOR LEVEL. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00761236-P1
12/07/2022
Violation issued (HPD, open)
B
12/07/2022
Violation issued (HPD, closed)
C
11/30/2022
Violation issued (HPD, closed)
C
11/30/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
A
11/28/2022
Violation issued (HPD, closed)
C
11/27/2022
Violation issued (HPD, closed)
B
11/27/2022
Violation issued (HPD, closed)
C
11/27/2022
Violation issued (HPD, closed)
B
11/19/2022
Violation issued (HPD, closed)
B
11/19/2022
Violation issued (HPD, closed)
C
11/19/2022
Violation issued (HPD, closed)
C
11/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
11/18/2022
Special inspection requirement — Energy Code Compliance Inspections
GINO LONGO
11/18/2022
Special inspection requirement — Maintenance information
GINO LONGO
11/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
GINO LONGO
11/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
GINO LONGO
11/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
GINO LONGO
11/14/2022
Violation issued (HPD, closed)
C
11/01/2022
Violation issued (HPD, closed)
B
11/01/2022
Violation issued (HPD, closed)
C
11/01/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2022
Violation issued (HPD, closed)
I
10/30/2022
Violation issued (HPD, closed)
C
10/14/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/03/2022
Permit issued — Plumbing
X00761236-I1-PL
09/09/2022
Objection resolved — Addressed
09/08/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection resolved — Addressed
08/12/2022
Objection raised — Energy
08/12/2022
Objection raised — Other
08/12/2022
Objection raised — Other
08/11/2022
Filed — Alteration
NEW PLUMBING WORK FILED FOR CAP AND REMOVAL OF GAS DRYER AND INSTALLATION OF A NEW COMBI-BOILER AT CELLAR FLOOR LEVEL. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00761236-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offG.M.A. PLUMBING & HEATING10/03/2022
1 project · most recent 01/09/2023
Gas
FiledStatusContractorScope
01/09/2023Signed-offG.M.A. PLUMBING & HEATINGGas
1 project · most recent 09/22/2022
General Wiring
FiledStatusContractorScope
09/22/2022Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/18/2022Fire-Resistant Penetrations and JointsGINO LONGOspecial
11/18/2022Energy Code Compliance InspectionsGINO LONGOprogress
11/18/2022Maintenance informationGINO LONGOenergy_progress
11/18/2022HVAC-R and service water heating system controlsGINO LONGOenergy_progress
11/18/2022HVAC-R and service water piping design and insulationGINO LONGOenergy_progress
11/18/2022HVAC-R and service water heating equipmentGINO LONGOenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026X00761236-P1Request digital key ↗
08/15/2026X00761236-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature5
08/30/2026X00761236-P1Open ↗
08/30/2026X00761236-P1Open ↗
08/30/2026X00761236-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026X00761236-P1Open ↗
08/23/2026X00761236-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026X00761236-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X00761236-P1Open ↗
08/15/2026X00761236-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00761236-I1Open ↗