Two stories - detached, small or mid-size
73 EARLEY STREET
BRONX · BIN 2081938
💬 Discuss this project
1925Year Built
1.5Stories
A1Building Class
R3AZoning
1,820 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,750 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction24p · 1 filing · 20 docs
Floor 1Under Construction25p · 1 filing · 20 docs
CellarUnder Construction24p · 1 filing · 20 docs
1 job · most recent 07/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2026Permit IssuedSUPERIOR HVAC INCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-HPR55M-230V0 55,000 BTU · Condensing Unit ×5
Midea M06HX-H48B-2A 48,000 BTU · Vrf Outdoor ×5
Mitsubishi Electric MXZ-3C24NAHZ4 22,000 BTU · Condensing Unit ×5
1 job · most recent 07/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/23/2026Signed-offG. C. PLBG & HTG INCGas, Water/Sanitary
1 job · most recent 04/01/2025
General Wiring
FiledStatusContractorScope
04/01/2025CompleteBULK ELECTRIC LLCGeneral Wiring
Building Lifecycle
All (63)Filed (9)Permit Issued (4)Signed Off (1)Inspection (7)Objection (12)Special Inspection (30)
08/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2026
Permit issued — Mechanical Systems
X00813211-S4-MS
07/29/2026
Special inspection requirement — Interior lighting power
Joseph Vuto
07/29/2026
Special inspection requirement — Mechanical Systems
Joseph Vuto
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Vuto
07/29/2026
Special inspection requirement — Lighting controls
Joseph Vuto
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Vuto
07/29/2026
Special inspection requirement — Final
Joseph Vuto
07/23/2026
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-P9
07/23/2026
Special inspection requirement — Interior lighting power
Joseph Vuto
07/23/2026
Special inspection requirement — Lighting controls
Joseph Vuto
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Vuto
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Vuto
07/23/2026
Special inspection requirement — Final
Joseph Vuto
07/23/2026
Special inspection requirement — Mechanical Systems
Joseph Vuto
07/22/2026
Signed off — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-S2
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
05/29/2026
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-P8
05/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
04/21/2026
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-P7
04/21/2026
Permit issued — Structural
X00813211-I1-GC-CX
03/18/2026
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-P6
03/18/2026
Objection resolved — Addressed
03/15/2026
Objection raised — Other
03/11/2026
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-P3
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Vuto
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
02/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
02/27/2026
Special inspection requirement — Structural Wood Frame
GLEN LANGER
02/27/2026
Special inspection requirement — Concrete - Cast-In-Place
GLEN LANGER
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
02/27/2026
Special inspection requirement — Final
GLEN LANGER
02/27/2026
Special inspection requirement — Fenestration air leakage
GLEN LANGER
02/27/2026
Special inspection requirement — Masonry
GLEN LANGER
02/10/2026
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-P5
12/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/08/2025
Permit issued — Plumbing
X00813211-S2-PL
03/26/2025
Permit issued — General Construction
X00813211-I1-GC-CX
01/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/25/2024
Objection resolved — Addressed
10/01/2024
Objection raised — Other
09/26/2024
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-S4
09/24/2024
Filed — Alteration CO
MECHANICAL WORK IN CONJUNCTION WITH NEW ALTERNATION
X00813211-S2
07/14/2023
Objection resolved — Addressed
07/14/2023
Objection resolved — Addressed
07/14/2023
Objection resolved — Addressed
07/14/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Other
02/08/2023
Objection raised — Other
Latest 60 of 63 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NIGHTINGALE BAMFORD SCHOOL507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2022$620K—Private party → Private party$341/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JMV CONSULTING ENGINEERING707/23/2026
GINO O. LONGO, ARCHITECT202/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV CONSULTING ENGINEERING, P.C103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FK CONSTRUCTION INCGeneral Contractor207/08/2026
SUPERIOR HVAC INCGeneral Contractor108/12/2026
G. C. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JMV CONSULTING ENGINEERIN804707/23/2026
S&S CONCRETE & SOIL TESTI1008202/10/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSUPERIOR HVAC INC08/11/2026
DOB NOWStructuralPermit IssuedFK CONSTRUCTION INC04/21/2026
DOB NOWPlumbingSigned-offG. C. PLBG & HTG INC09/08/2025
DOB NOWGeneral ConstructionPermit IssuedFK CONSTRUCTION INC03/26/2025
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
07/29/2026Lighting controlsJoseph Vutoenergy_progress
07/29/2026Mechanical SystemsJoseph Vutospecial
07/29/2026Fire-Resistant Penetrations and JointsJoseph Vutospecial
07/29/2026FinalJoseph Vutoprogress
07/29/2026HVAC-R and service water heating system controlsJoseph Vutoenergy_progress
07/29/2026HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
07/29/2026Interior lighting powerJoseph Vutoenergy_progress
07/29/2026HVAC-R and service water heating equipmentJoseph Vutoenergy_progress
07/23/2026Interior lighting powerJoseph Vutoenergy_progress
07/23/2026Mechanical SystemsJoseph Vutospecial
07/23/2026FinalJoseph Vutoprogress
07/23/2026HVAC-R and service water heating equipmentJoseph Vutoenergy_progress
07/23/2026HVAC-R and service water heating system controlsJoseph Vutoenergy_progress
07/23/2026HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
07/23/2026Lighting controlsJoseph Vutoenergy_progress
07/23/2026Fire-Resistant Penetrations and JointsJoseph Vutospecial
06/01/2026Fire-Resistant Penetrations and JointsJoseph Vutospecial
06/01/2026HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
05/28/2026Fire-Resistant Penetrations and JointsJoseph Vutospecial
05/28/2026HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsJoseph Vutospecial
03/11/2026HVAC-R and service water piping design and insulationJoseph Vutoenergy_progress
02/27/2026Insulation placement and R valuesGLEN LANGERenergy_progress
02/27/2026Construction Operations Influencing Adjacent StructuresGLEN LANGERspecial
02/27/2026MasonryGLEN LANGERspecial
Latest 25 of 61.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/16/2026X00813211-P9Request digital key ↗
08/16/2026X00813211-S2Request digital key ↗
08/16/2026X00813211-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00813211-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026X00813211-S2Open ↗
08/28/2026X00813211-P6Open ↗
08/28/2026X00813211-S4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/16/2026X00813211-S4Open ↗
08/16/2026X00813211-P9Open ↗
08/16/2026X00813211-P8Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026X00813211-S2Open ↗
08/28/2026X00813211-P6Open ↗
08/28/2026X00813211-S4Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/16/2026X00813211-P5Open ↗
08/14/2026X00813211-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/16/2026X00813211-P8Open ↗
08/16/2026X00813211-P9Open ↗
08/16/2026X00813211-P7Open ↗
Showing 3 of 9 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/16/2026X00813211-P5Open ↗
08/14/2026X00813211-I1Open ↗