← Back
One story - permanent living quarter
25 HAWKINS STREET
BRONX · BIN 2082134
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R3AZoning
1,254 sfGross Floor Area
1Units
One story - permanent living quarter · 4,454 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Cellar1p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC108/20/2024
REVANS DESIGN PE PC509/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEMAR MECHANICAL INCPlumbing307/08/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
DEMAR PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116108/20/2024
REVANS DESIGN PE PC4617509/23/2022
Building Lifecycle
All (38)Filed (6)Permit Issued (4)Signed Off (3)Inspection (6)Special Inspection (19)
03/18/2025
Signed off — Alteration
X01097633-I1
08/22/2024
Permit issued — Solar
X01097633-I1-SL
08/20/2024
Filed — Alteration
X01097633-I1
08/07/2023
Signed off — Alteration
X00786804-I1
08/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2023
Signed off — Alteration
REPLACE (2) EXISTING BOILERS AND (1) HOT WATER HEATER WITH NEW CONDENSING BOILER AND INDIRECT HOT WATER HEATER/STORAGE TANK. REPLACE EXISTING GAS PIPING AS PER PLANS. REGISTER EXISTING GAS DRYER IN CEL. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPA
X00581021-I1
10/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
10/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
10/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
10/03/2022
Special inspection requirement — Maintenance information
PAUL REVANS
10/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
10/03/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL REVANS
09/23/2022
Filed — Alteration
REPLACE (2) EXISTING BOILERS AND (1) HOT WATER HEATER WITH NEW CONDENSING BOILER AND INDIRECT HOT WATER HEATER/STORAGE TANK. REPLACE EXISTING GAS PIPING AS PER PLANS. REGISTER EXISTING GAS DRYER IN CEL. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPA
X00581021-P3
09/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/22/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/05/2022
Permit issued — Plumbing
X00786804-I1-PL
08/02/2022
Filed — Alteration
X00786804-I1
08/02/2022
Filed — Alteration
REPLACE (2) EXISTING BOILERS AND (1) HOT WATER HEATER WITH NEW CONDENSING BOILER AND INDIRECT HOT WATER HEATER/STORAGE TANK. REPLACE EXISTING GAS PIPING AS PER PLANS. REGISTER EXISTING GAS DRYER IN CEL. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPA
X00581021-P2
07/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
07/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
07/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
07/26/2022
Special inspection requirement — Maintenance information
PAUL REVANS
07/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
07/26/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL REVANS
07/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
06/08/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2022
Filed — Alteration
REPLACE (2) EXISTING BOILERS AND (1) HOT WATER HEATER WITH NEW CONDENSING BOILER AND INDIRECT HOT WATER HEATER/STORAGE TANK. REPLACE EXISTING GAS PIPING AS PER PLANS. REGISTER EXISTING GAS DRYER IN CEL. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPA
X00581021-P1
05/03/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL REVANS
05/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
PAUL REVANS
05/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PAUL REVANS
05/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
PAUL REVANS
05/03/2022
Special inspection requirement — Maintenance information
PAUL REVANS
05/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL REVANS
05/02/2022
Permit issued — Plumbing
X00581021-I1-PL
10/12/2021
Permit issued — Plumbing
X00581021-I1-PL
10/05/2021
Filed — Alteration
REPLACE (2) EXISTING BOILERS AND (1) HOT WATER HEATER WITH NEW CONDENSING BOILER AND INDIRECT HOT WATER HEATER/STORAGE TANK. REPLACE EXISTING GAS PIPING AS PER PLANS. REGISTER EXISTING GAS DRYER IN CEL. NO CHANGE IN MEANS OF EGRESS, USE GROUP, OR OCCUPA
X00581021-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP08/22/2024
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC08/05/2022
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC05/02/2022
DOB NOWPlumbingSigned-offDEMAR PLUMBING CORP10/12/2021
BISOTISSUED1ST LIGHT ENERGY INC01/09/2017
1 project · most recent 12/27/2024
FiledStatusContractorScope
12/27/2024CompleteJSP ELECTL CNTNG CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/22/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
10/03/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
10/03/2022HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
10/03/2022HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
10/03/2022Maintenance informationPAUL REVANSenergy_progress
10/03/2022HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
10/03/2022Energy Code Compliance InspectionsPAUL REVANSprogress
07/29/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
07/26/2022HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
07/26/2022HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
07/26/2022Maintenance informationPAUL REVANSenergy_progress
07/26/2022HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
07/26/2022Energy Code Compliance InspectionsPAUL REVANSprogress
07/26/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
05/03/2022Energy Code Compliance InspectionsPAUL REVANSprogress
05/03/2022HVAC-R and service water heating system controlsPAUL REVANSenergy_progress
05/03/2022HVAC-R and service water piping design and insulationPAUL REVANSenergy_progress
05/03/2022HVAC-R and service water heating equipmentPAUL REVANSenergy_progress
05/03/2022Maintenance informationPAUL REVANSenergy_progress
05/03/2022Fire-Resistant Penetrations and JointsPAUL REVANSspecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026X00581021-P2Request digital key ↗
08/24/2026X00581021-P1Request digital key ↗
08/24/2026X00581021-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/06/2017240167868Open ↗
▸BISWORK PERMIT APPLICATION1
01/06/2017240167868Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
01/06/2017240167868Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X00581021-P2Open ↗
09/01/2026X00581021-P2Open ↗
09/01/2026X00581021-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026X00581021-P3Open ↗
08/24/2026X00581021-P2Open ↗
08/24/2026X00581021-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00581021-P2Open ↗
09/01/2026X00581021-P1Open ↗
09/01/2026X00581021-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/06/2017240167868Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/06/2017240167868Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/06/2017240167868Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
01/06/2017240167868Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00581021-P1Open ↗
08/24/2026X00581021-I1Open ↗
08/24/2026X00581021-P2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/06/2017240167868Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/06/2017240167868Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/06/2017240167868Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00581021-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/06/2017240167868Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/06/2017240167868Open ↗
01/06/2017240167868Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01097633-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/06/2017240167868Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/06/2017240167868Open ↗