← Back
Walk-up cooperative
33 TIER STREET
BRONX · BIN 2082309
💬 Discuss this project
1900Year Built
3Stories
C6Building Class
R3AZoning
4,416 sfGross Floor Area
3Units
Rent Stabilized15 Open Violations ▸
Walk-up cooperative · Owner of record: TIER STREET OWNERS INC · 7,165 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Floor 31 filing
Floor 21p · 2 filings · 4 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TIER STREET OWNERS INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AM ARCHITECTURE PLLC204/20/2022
ZS DESIGN ARCHITECT, PLLC111/26/2019
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WYNNE PLBG & HEATING CORPPlumbing507/08/2026
GRINDSTONE CONTRUCTION INGeneral Contractor303/21/2026
NEW PLBG & HTG CORPPlumbing307/08/2026
Building Lifecycle
All (42)Filed (3)Permit Issued (5)Signed Off (2)Violation (16)Inspection (2)Objection (8)Special Inspection (6)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
04/03/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, open)
I
06/05/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APT. 2H. REMOVAL OF NON-BEARING WALL BETWEEN EXISTING BATHROOM / EXISTING BEDROOM. REMOVAL OF DOORS,FIXTURES, TRIM AND FINISHES IN EXISTING BATHROOM.-RENOVATE EXISTING BATHROOM FIXTURES, INSTALL NEW AS AS PER PLANS FILED
X00721046-I1
05/31/2023
Signed off — Alteration
Remove and replace plumbing fixtures on 2nd floor of existing building
X00721064-I1
03/17/2023
Violation issued (HPD, open)
A
01/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2022
Permit issued — Plumbing
X00721064-I1-PL
11/21/2022
Permit issued — General Construction
X00721046-I1-GC
11/03/2022
Violation issued (HPD, open)
I
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Alyssa Manfredonia
05/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
Alyssa Manfredonia
05/12/2022
Special inspection requirement — Insulation placement and R values
Alyssa Manfredonia
04/28/2022
Objection raised — Scope
04/28/2022
Objection resolved — Addressed
04/28/2022
Objection raised — Inspections
04/28/2022
Objection resolved — Addressed
04/28/2022
Objection raised — Other
04/28/2022
Objection resolved — Addressed
04/26/2022
Objection raised — Scope
04/26/2022
Objection resolved — Addressed
04/20/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APT. 2H. REMOVAL OF NON-BEARING WALL BETWEEN EXISTING BATHROOM / EXISTING BEDROOM. REMOVAL OF DOORS,FIXTURES, TRIM AND FINISHES IN EXISTING BATHROOM.-RENOVATE EXISTING BATHROOM FIXTURES, INSTALL NEW AS AS PER PLANS FILED
X00721046-I1
04/20/2022
Filed — Alteration
Remove and replace plumbing fixtures on 2nd floor of existing building
X00721064-I1
04/18/2022
Special inspection requirement — Final
Alyssa Manfredonia
04/18/2022
Special inspection requirement — Lighting controls
Alyssa Manfredonia
04/18/2022
Special inspection requirement — Lighting in dwelling units
Alyssa Manfredonia
02/18/2022
Violation issued (HPD, open)
I
02/18/2022
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, open)
I
03/16/2020
Permit issued — Plumbing
X00268938-I1-PL
11/29/2019
Permit issued — Plumbing
X19807283-I1-PL
11/29/2019
Permit issued — Plumbing
X00268938-I1-PL
11/26/2019
Filed — Alteration
New plumbing fixtures on 3rd floor of existing building.
X00268938-I1
10/28/2019
Violation issued (HPD, open)
I
10/12/2018
Violation issued (HPD, open)
I
11/14/2017
Violation issued (HPD, open)
I
10/05/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP12/08/2022
DOB NOWGeneral ConstructionSigned-offGRINDSTONE CONTRUCTION IN11/21/2022
DOB NOWPlumbingSigned-offNEW PLBG & HTG CORP03/16/2020
DOB NOWPlumbingPermit IssuedNEW PLBG & HTG CORP11/29/2019
DOB NOWPlumbingSigned-offNEW PLBG & HTG CORP11/29/2019
BISOTISSUEDMILLER CONTRACTING08/09/1994
BISOTISSUEDMILLER CONTRACTING08/09/1994
1 project · most recent 11/26/2019
Water/Sanitary
FiledStatusContractorScope
11/26/2019Signed-offNEW PLBG & HTG CORPWater/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
05/12/2022Energy Code Compliance InspectionsAlyssa Manfredoniaprogress
05/12/2022Fire-Resistance Rated ConstructionAlyssa Manfredoniaprogress
05/12/2022Insulation placement and R valuesAlyssa Manfredoniaenergy_progress
04/18/2022FinalAlyssa Manfredoniaprogress
04/18/2022Lighting controlsAlyssa Manfredoniaenergy_progress
04/18/2022Lighting in dwelling unitsAlyssa Manfredoniaenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/15/2026X00721064-I1Request digital key ↗
08/15/2026X00721046-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00268938-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/18/2019240262336Open ↗
▸BISWORK PERMIT APPLICATION1
10/18/2019240262336Open ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026X00721046-I1Open ↗
09/01/2026X00721046-I1Open ↗
09/01/2026X00721046-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026X00721064-I1Open ↗
08/24/2026X00721046-I1Open ↗
08/13/2026X00268938-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/18/2019240262336Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/18/2019240262336Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/18/2019240262336Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
10/18/2019240262336Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00268938-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/15/2026X00721064-I1Open ↗
08/15/2026X00721046-I1Open ↗
08/13/2026X00268938-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/18/2019240262336Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/18/2019240262336Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
10/18/2019240262336Open ↗
▸BISNYCECC ANALYSIS1
10/18/2019240262336Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00721046-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/30/2019240262336Open ↗
10/18/2019240262336Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/18/2019240262336Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/18/2019240262336Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/18/2019240262336Open ↗