← Back
Three families
244 CITY ISLAND AVENUE
BRONX · BIN 2082457
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R3AZoning
2,220 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 4,475 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Plumbing
Basement1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAFALEX CONTRACTING CORP209/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
E&A DESIGN AND EXPEDITER CORP.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&A HEATING & CONTRG CO.IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659109/13/2022
HRF SERVICES CORP5616105/17/2021
Building Lifecycle
All (11)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Inspection (1)Objection (2)Special Inspection (3)
03/27/2023
Signed off — Alteration
JOB FILED FOR INSTALL ONE NEW GAS DRYER IN EXISTING 3 FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00519850-I1
09/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/26/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/26/2022
Special inspection requirement — Maintenance information
FAHAD FATEH
09/14/2022
Objection raised — Scope
09/14/2022
Objection resolved — Addressed
09/13/2022
Filed — Alteration
JOB FILED FOR INSTALL ONE NEW GAS DRYER IN EXISTING 3 FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00519850-P1
07/08/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/29/2021
Permit issued — Plumbing
X00519850-I1-PL
05/17/2021
Filed — Alteration
JOB FILED FOR INSTALL ONE NEW GAS DRYER IN EXISTING 3 FAMILY HOUSE. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
X00519850-I1
02/03/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offR&A HEATING & CONTRG CO.I06/29/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/26/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/26/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
09/26/2022Maintenance informationFAHAD FATEHenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026X00519850-I1Request digital key ↗
08/15/2026X00519850-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026X00519850-I1Open ↗
08/13/2026X00519850-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X00519850-I1Open ↗
08/25/2026X00519850-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026X00519850-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X00519850-I1Open ↗
08/13/2026X00519850-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00519850-I1Open ↗